Minutes Ordinary Meeting 20 March 2025
ORDINARY MEETING MINUTES 20 MARCH 2025
Response provided by Kim Rawlings Director Strategy and Environment
As demonstrated by the Biodiversity Overlay, the tree preservation local law and
a broad range of environmental and ecological activities regularly undertaken by
the organisation, Council is committed to conserving natural resources and
retaining areas of ecological significance where possible and practical. The
subdivision has been assessed against several assessment frameworks and
determined to be compliant. An ecological report (available via the Council
website) was commissioned by Council to assess the site for ecological
significance. The gully was specifically considered as part of the exploration of the
site. Historical aerial mapping indicates this area provided general overland flow
down to the main waterway until the Dianella Ct residential subdivision was
created. This area currently discharges into a pipe which can be subject to
blockage issues. As well as providing access to the rear of the property, the
revised subdivision plan acts to improve site drainage and reduce
blockage/overflow issues on the site. In addition to the approximately 2,000 pine
trees, there is some scattered native vegetation across the site, including Gympie
Messmates, which will be retained where possible, although some are likely to be
removed as part of the remediation or subdivision works. It is the intent to retain
as much native vegetation on site as possible. The screening trees along the
northern boundary of the cemetery are likely to be retained along with some of the
screening hedge along Lake Macdonald Drive. New native tree plantings
throughout the subdivision will offset the removal of the existing native trees.
8.4. PAUL NOONAN
QUESTION 1
Subject: 62 Lake Macdonald Drive - Late last year Council committed to conduct
roof and water tank cleaning at surrounding homes during and after site works (as
necessary). Is Council planning to undertake professional 'background' data
collection in the adjoining residential area and cemetery before site work starts?
This would be a sensible step to inform project and health risk decision making in
a range of scenarios:
1) vibration monitors on homes and graves,
2) noise monitoring,
(Considering the 62LMD contaminants of concern)
3) dust monitoring - both nuisance, and respirable (PM10 and PM2.5 particulates).
4) roof dust analysis
5) rainwater tank water testing
Thank you
Response provided by Kim Rawlings Director Strategy and Environment
Resident, worker, and community safety are of the highest priority in carrying out
this work. Site remediation is highly regulated and will be overseen by a qualified
and experienced specialist.
Vibration and Noise Monitoring
Both vibration and noise monitoring is proposed to be undertaken by the Principal
Remediation and Construction Contractor throughout the duration of the works, in
accordance with the Department of Transport and Main Roads construction
management specification for the monitoring and controlling of Noise and Vibration
to ensure the site’s surrounding sensitive receptors are not adversely impacted
upon. Sensitive receptors include the site’s surrounding residential properties
along Dianella Court, Lake Macdonald Drive and Kauri Street as well as all assets
and infrastructure (e.g. burial sites, buildings) located within the Cooroy Cemetery
site. A dilapidation report will also be undertaken on the sites surrounding
infrastructure and sensitive receptors, prior to the works commencing on site to
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.