Council archive · source document
08/0610 - Transport Type 5 - Boat lifting device (Inc INCORRECT 3m boat lift plans) [As Published] · 142008.610
Plans and drawings: the text below has words only, no drawings.
NOOSA Checklist - Applications Involving Land ee Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 4., APPLICATION FORMS’) = 7” a 2 es 1.4 Form’ PartA 1.1.1 Ensure that the form is fully completed. v 4.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners consent is required. 1.1.2.1 If there are multiple owners, the consent of each owner is required. 1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required. 1.2. Form’ Part B-O Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. 4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. 2. - REFERRAL INFORMATION. - me at bin me i 2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. 3. 7 ENVIRONMENTALLY RELEVANT ACTIVITIES’ “°° sy) re 3.1 Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. 4: FORWM 2 REQUEST TO.CHANGE APPROVAL Ss SS 4.4 Ensure that items 1-28 have been checked and/or completed including information regarding | applicant details and owners consent. §. ° PLANS -,* : TRO mS wo Ot gee. US aes ¢ 5.1 Ensure that at least 6 sets ‘of the Plan of Development (5 for Reconfiguration and Operationat | i Works) accompanies the application. In addition ensure that each set is compiete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. 6. -"SUPPORTING INFORMATION. LTIT 7 TT le ak NEN 6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfi iguration and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 7. FEE REE eS cae wee oe ee ee ee : 7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, J accompanies the application or has been paid. 7.2. Ensure that the fee which has been paid is recorded on the application form. . J Receiving Officer ...... f Jee ) Naan Le Need Date ..... (ok peseeeeeueeee Having completed this form and accepted the crgighon please deliver both to the following IDAS Application Receiving trays:- * If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section. ¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. * Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the Land Development Section. * Inall other circumstances - AOP1’s desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. PPK aneaeynper ee vee See ape Tame ees SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 pages
Page 2
PILE-IT Pty Ltd Trading as Noosa Jetty Builders LETTER ABN: 55099036736 No: 0046 BSA: 1111115 DATE:3/04/2008 FROM: Noosa Jetty Builders PO Box 299 Phone: (07) 5474 3480 Noosaville Fax: (07) 5474 3480 QLD, 4566 Mobile: 0408 137 526 TO: Trish Sweeney Sunshine Coast Regional Council Noosa Office Pelican Street Tewantin, Q 4565 Contact No: 54 495 293 RE: Dear Trish, Due to an oversight on my part the boat storage device shown on the attached plan was not assessed under the recent jetty application. Could you please assess the boat storage device as discussed in our previous phone conversation. Attached is 4 plans one being the original approved jetty plan, the other a copy of the site plan from the approved plans, plus 2 copied of the proposed boat storage device. In regards to the application fee | have submitted as discussed payment of the reduced fee of $650 & | thank-you for this relaxation. If you require any further information regarding this application please contact me on the above numbers, Yours Sincerely, Emma Reed (Managing Director) 06/273
Page 3
Mackenz 2
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 Maich 2008
Form 1 Development Application
Common details
i &
RECT? Details (The App comm Ms petscn responsio far Oh ing lie eppbcaon and rage dnd G8 te varies Of the Crd Teapot iespanst:2 for ensuring th.
Information provided of te DAS Apt saten Forms correct Th.s utormxten is rebed upen by the Assessment Manager-and any referral.gencies when assessing and
deciding thes applicatwn By dodging th.s enpvieewon, the Appkcart incurs (he obligations and resnonsiialh ies preseribed bythe IPA Any deystopmcnt pera gr preiiminxy
approval thut re ty be suad a a consegucnce of thes anahcation Kil ba dasuiad to ile Apphicsst)
Company/organisation name (if applicable) |PILE-IT Pty Ltd t/a Noosa Jetty Builders
Individuat applicant/C ontact person (if there is more than one applicant, provide additional applicant detaits on an attachment to this form)
Postal address [po Box 299, Noosaville. QLD 4566
Contact telephone number |07 5474 3480 Mobile phone number 0408 137 526
Facsimile number 07 5474 3480 e-mail address [email protected]
iDetads of the premises Ce the [nd.co which the develope is proposed refer 15 the cuv.cé at the end of the form) “ 4
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A {f the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
| __,___.__ Name of each local government area in which the mobile and temporary ERA is proposed to operste
| 1
OR
Table B Street address for the premises (tick applicable box/es belaw and insert property description in the table. Identify each lot in a separate row.)
(i) ((] Street address / lot on plan for the premises (Appropriate for most applications including building applications): or
(i) {XJ Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon ate) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government, )
pe ~~ Street Address “_ {Loton pian descnptionf |
aT Sheet Bian ype and Local government area (og. Logan, |
. , |
No. | No. Street Name and official suburbfocaliy name | Post Code} Lat No Pion A Cakns)
4 10 The Promontory, Noosaville. QLO 4566 845 SP 102579 Sunshine Coast regional councit
AND / OR
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, aver part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates a ie Te |
(Nola: place exch sal of coording’ss in a saparate row) Zone D Local government area
i” : , 1 , Reference turn | (if applicable}
Easting Northing . Latitude Longitude
1 (J ocpasa
CO wesse
| Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the fallawinn eharartoricties hewavar came anniiratinne may inualia ane or mare of theca charactarictire . eamniate ante if anolirahla)
Page 4
INTEGRATED PLANNING ACT 1997
Table D Complete itt if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
Part A, Version 3.1, 3 March 2008
"Name of water body, watercourse ¢ or aquifer | (if known}
It Noosa Waters
Table E Complete | it the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
~ Lot on plan description for strategic port land a __Port Authority for the lot ~ |
[i _ cones sessed
Table F Complete if the premises are in tidal water
| — nt for the tidal area ffagp _ ne of port authority for the tidal area (f applicable}
[1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
7 Total area of premises
747.00 [K}m? ([] hectares
(Tick applicable unit)
Existing use of the premises.
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
|
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc)?
XK) No O Yes - Ensure the type, location and aimensions of each easement are included in plans, submitted with the application
iProposal details ‘J
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
Pneumatic boat storage device
7. Does the poposal include new buildings or operational work (including any services) on the premises?
(No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
Resource entilementt (agg sen.s« tarther ivine tur 1s prowidiea #1 the “tet. séctarr £282 end of reform |
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
XxX No -Go to Q9 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
jOwner's consent @ ays’cubl} further star conn prodded 9 i. oc: ve seetenat ne nd of tie hem |
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or an an attachment to this form if applicable
Premises Owners name’s | Details of the premises owned “Date consent}
TableH __and postal address ___{steet adoress or fot n plan description) Owners saat” | was obtained |
1 Marilyn C Mackenzie 10 The Promontory, Noosaville. QLD 4566 01/02/2008
2 Malcolm J Mackenzie 10 The Promontory, Noosaville. QLD 4566 01/02/2008
* Qwner’s signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2007 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
ttachments and supporting information Cors :+ Take! Use a supon'e row far exch typeof adachrect or orton oeitag a r.3on requ red
ar tts Port) Please ensure ad documentation Submized wih thé form, induding other Pacts of Form 7, oF ovmer's consent, eic, are securely attached @ this Part of the For.
Deserption of atachmentr information = | Tie (appicebie} Method of datvery to |
Table t feo Pet € of Form 1, oe eee noe eo er een anes Sea a" Date - assessment manager
1 Part E 07-Apr-2008 | over the counter
Check list 07-Apr-2008 | over the counter
Plans 07-Apr-2008 | over the counter
Portable Long Service Leave (PLL) levy. (frac chy cat-n bu ong ond consinacton nuk wetiod ox $72,000 ory} 1
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: { Tick box if applicable)
(1 the application seeks a preliminary approval only;
[77 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave} Act 1997, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing. site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
[X] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. |s payment of a PLSL levy applicable to this application? (Refer to Q70 and the Advice below for more information)?
1K) No - End of Pat a
(1 Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
Fee ($} Date received Receiving officer's Reference
tame numbers
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER 1
‘ouncil. | have been engaged as the private certifier for the building work referred to in this application.
To:
Building classificattonés
Name af . -BSA Certification number,
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
~~ — = “T Date recespted
oo 1 . form e-ghted by | Name of cffoer wito si
Description of the work Qleave Project Number | Amount paid ($) Date paid ssment | form
ir manager :
1
Privacy Statement
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by tegistation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Details of the premises
The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.
The premises may be identified in a number of ways --
« Street address and lot on plan are most common and will apply to most applications.
* Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body and ‘watercourse’ can vary from Act to Act.
StrategicPortLandis within a local government area but a focal government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports} website.
‘Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA {schedule 10}. Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a focal government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the {PA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
Section 3.2.1{5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned tand, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be property made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as property made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receNve the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.
Portable Long Service Leave (PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensiand.
The PLSL ‘evy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Heatth and Safety Fee and the
Building and Construction IndustryTrainingLevy.
The Building and Construction industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www. qleave,qid,gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
www. gleave.qld.gov.au }
Page 7
INTEGRATED PLANNING ACT 1997
Building &/or operational works assessable
against a planning scheme
SSSR RIE SEs, EN PI IE
4. Nature of work that requires assessment against a planning scheme:
([] Building work - Complete Table A Operational work - Complete Table 8
Table B
@ (i) What is the nature of the operational work?
(] Roadworks (J Stormwater {_] Water infrastructure L_] Sewerage infrastructure
(J Landscaping (FD Earthworks [J Orainage Works J] Signage
J Clearing vegetation under the planning scheme Other - Specify below
Boat Storage Device
(ii) What type of approval is being sought? (VOTE: If you have indicated multiple operational works in question (} above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these delails in an attachment to this form)
(J Preliminary approval J Both (Specify below)
[X] Development Permit
(ii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision?
BX}No — ([] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Pretiminary Approval for MCU or reconfiguring
a fot)
No {[] Yes - Compiete Table Bfa)
$ 10000
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour)
oy
Syptieteouen 2 Bs un ne
3. Confirm that the following mandatory information accompanies this application
Plans, andspecifications if applicable, showing the nature and location of the proposed works fincluding the
extent of any cut and fii) {XJ Confirmed | over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
le Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.
Ql A development permit authorises development to occur, while a preliminary ‘approval is a step in the approval process and does nol authorise development to occur
Page 8
INTEGRATED PLANNING ACT 1997
Assessment Checklist
boas Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.
Part A (Common details) of Form 1 must be completed for aff applications. The relevance of other Parts of Form 1 depends on
the nature of the application.
Form 1 also includes the IDAS Assessment Checidist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be
completed tor all development applications except those proposed on Jand in an urban development area, or for building work
requiring assessment against the Building Act 1975 onty.
For more information about development applications on land in an urban development area, refer to vrwy.utda.qld.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checkfst
Does the application seek approval to materially change use of the premises?
ifyes - complete Section 2 of this checklist L1Yes |JNo
Does the application seek approval to reconfigure a lof? Yes |B2No
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the focal government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist bdYes |LJNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
if yes - complete Section 5 of this checklist
(Yes |KJNo
Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist. DYes |KJNo
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? Yes |LINo
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. (Yes |{KJNo
Assessment is by a building certifier
BEC 1.7 7 secten 1 must be completed for afi epptications that require completion af the IDAS Assessment Checklist.
HERITAGE
11 Answer both A and 8 below.
A |s any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensiand Heritage Act
1992?
EX] No - Go to8 CL Yes
Page 9
(NTEGRATED PLANNING ‘ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008 B Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9 (development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992? id No - Goto Q1.2 O Yes - (Complete Form 1, Part C;) This application requires assessment by the relevant local government against the IDAS Cade in the Queensland Heritage Regulation 2003. if the development involves building work and the Jocal government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence Agency. IPA senadiile 8, patt L lable + dem ¢A, schertule 9 tables 1 2% 4.8 SIP Requiaten, schedine 7 table 1 tem TIARA, section} 59 (DeSnituns toe terms used tt deve ipitasm) Queensland Heritage: Regulate 2003 s.hedue 2 UDAS Cade R EMOVING QUARRY MATERIAL; WILD RIVER AREA ] 1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000? (XJ No-Gotoa13 [_] Yes IPA, schedule 8, part 1, table 5, tem 1; 1P Regulation, schedule 2, table 2, tem 11; IP Regulation, schedute 1, table 5, tem 2 (wild river area): Water Act 2000, section 966C, Wild Rivers Act 2005, section 43A JENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA | 1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? LX] No-Gotoa74 [_] Yes IPA setredise H, part 1 table 2, tain T IPA, schedule & part 7. iable 4, tems 3 and 4, IP Regulation, schedise 7, lable 2, terms 1 and 73, Lewienmental Protection Act 1984, seciat TUAA (wkd ever aed}; Wael Revers Act 2005 sectin 414 relevant wald wer declsrabon: Wid Revers Code: (WITHIN THE UMITS OF A PORT : | 1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994? BX] No - Goto Q7.5 LD Yes IP Regulation, schedule 2, table 2, items 15 and 16 [DECLARED FISH HABITAT AREA | 15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? KX] No - Goto ar6 (Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Advice Agency. IP Regulation, schedule 2, table 2, item 26 iCOMMUNITY INFRASTRUCTURE | 16 Is any part of the premises designated for community infrastructure? [KX] No -Gotoan7 (1 Yes IP Regulation, schedule 2. table 3. tem 7 WASTE WATER MANAGEMENT __ | 17 Does the proposal involve the establishment or expansion of a waste water disposal system? [IX] No - Endof Section? [_] Yes IP Regulation, schedule 2, table 3, item 5 iS E C 1 } Jig Section 4-must be completed when the applicaton seeks approval fo carry out operational work. PLANNING SCHEME eS 41 ls any of the proposed operational work assessable under a planning scheme? (LJ No - Go to Q4.2 DX] Yes - (Complete Form 1, Part E} Answer Qs4.1.1 - 4.1.7 below.
Page 10
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 21.2, 31 March 2008
ISTATE-CONTROLLED ROAD |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-contralled road?
KX No
(Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
{K] No - Goto 04.1.2
Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Reguianor, schedwe 2 table 2 tem 3; IP Reguisuion, schedule 2. table 3, tem 127
|ACID SULFATE SOILS . {
4.1.2 Isany of the operational work proposed in a local government area listed*! in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
EX] No -Gotoa4.13 (1 Yes
4\ gurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloota, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
IP Regulation, schedule 2, table 3, item 4, State Planning Poly 202 Pianning and Managing Development involving Acid Sulfate Soils. section 36
EASEMENTS AND-SUBS TATIONS ° : oO ~ |
413 Is any of the proposed operational work for filling or excavation?
BQ) No -Got0a4.1.4
CI Yes
IP Reguiation, schedule 2, table 3 item 10(a), IP Regulation, schedule 2, table 3, item 10(b}
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
XJ No -Gotoa4.1.5 ((] Yes
IP Regulation, schedule 2, table 3, tem 17
PUBLIC PASSENGER TRANSPORT 4
4.1.5 Is any of the proposed operational work listed in schedule 13C of the /ntegrated Planning Regulation 1998 and does it exceed the
specified threshold?
{X] No-Gotoa4.1.6 [[] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Reguiation, schedule 2, table 3, tem 14
JRAILWAY SAFETY AND EFFICIENCY |
4.1.6 |s any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
DK] No- Goto a4.1.7 ([] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation. schedule 2, table 3, iter 15
|KOALA CONSERVATION 7 “J
417 ls any part of the premises in a koala conservation area or koala sustainability area?
DX] No -Gowasz2 (] Yes
IP Regulation, schedule 2, table 3, tem 19
WILD RIVER AREA - Although legistation provides for assessment of operatiorial works for residential, commercial and industrial
development for the purposes of the Wild Rivers Act 2005. currently no declarations for any of the wild river areas apply the Wild Rivers
ode to that type of development.
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkhist, Version 21.2, 31 March 2008
Fr cae rr rrmemerrcanic te ner en een CMT INA WI DCH |
ASSOCIATED With RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA . .
42 Is any of the proposed operational work associated with reconfiguring a Jot and the reconfiguration is also assessable?
PX] No -Gotoas3 [_] Yes
IPA, scheduie 8. part 1, table 4 dem 2: IP Regulation, schedule 1, patt 2. table 5, iter: Hep
Wild Rivers code (Nate the code does not currently contain appix ab'e prowsions for residential, industrial or commercial ceveloment diside a designated urban
area}
NEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA |
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
KX No -Gotoos4 ([] Yes
IPA, schedule 8, part 7, table 4, tems 1A 1G, IP Regulation, schedule 2, lable 2, dem 5 (vegetation clearing). {P Regulation, schedule 2, table 2, tem 34 (koala
conservation), IP Regulation, schedule 1, part 3, table 4, tem (vegetation clearinghwid river area): Vegetation Mariagement Act 1999, section 22A {vegetation
clearing/witd river area), Wild Rivers Act 2005, sectians 31F and 43A
{TAKING OR INTERFERING WITH WATER; WILD RIVER AREA |
44 's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Gotoa4s [[] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, teins 3a); IP Regutaon, schedule 2, table 2, item 8, IP Regulation, schedule 7, part 2. tafe 4, terns 3 and 3A; Water Act 2000, section 968A (vikd ter
area), Wi! Rivers Act 2005, section 42: relevant wild river dectaration: Wid Rivers Code
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW. If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(b), IP Regulation, schedule 2, table 2, item 8 IP Regulation, schedule |, part 3, table 4, tem 3
Wid Rivers code (Note. the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[X] No -Gotoas.7 (_] Yes - Answer (a) and (b) below
IPA, schectile B part J, table 4, dem 3(cit) IP Regulation, schedule 2, table 2, lem 8 1P Regulanon, schedute 1, part 3, table 4 item 3; Water Act 2000, section 986A (yall river aie,
{Wild Rivers Act 2005, section 43/, relevant wit liver declaration, Wik Rivers Code
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)? ,
BJ No -Gotoass [_] Yes
IPA, schedule 8, part i, table 4, item 3{c)(i); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wild ver area)(Note. no current Wild River declaration :denities taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub aftesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
[EX] No -Gotoas9 [[] Yes - Answer both (a) and (b) below
IPA schedule 8 par 1, table 4 items iopty and dy, IP Reyedatos, soheckile 2. tab 2, dom 9, IP Requiaton, schedule 1, patt 3 title ¢ dem 3A, Water Act 2000. sechon 9358 (ei
river ate} celavant vaid (wet deciatatan Wad Kivers Cade
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J No OO Yes
(i) To increase the storage capacity of a referable dam by more than 10% — No ) Yes
if yes to either or both (i) or (ii) above - (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not ihe Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schechile 8, part 1, table 4, tem 4, IP Regulation, schedule 2, table 2, item 10
{TIDAL WORK; WILD RIVER AREA . . J
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[XJ No -Gotoa4.11 ((] Yes - Answer (a) and (b) below
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 21 2, 31 March 2008
IPA, scheduie 8, part 1, tabie 4. tem 5 IP Regulation, schedule 2, table 2. xems 12. 14 and 17 iP Reguiaiion. schedule 1. part 3 table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wid nver area)
iCOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA i
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
[X] No -Gotogsi2 {_] Yes
IPA, schedule §, part 1. table 4 em 5. IP Requiation, schedule 2, table 2. tems 12 and 14, IP Reguiation, schedule 1 part 3. table 4, tems 4A and 5
Coasial Protection and Management Act 199% Act 1995. section 104A (wid vit area), Wid Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BX] No -Gotoas13 [_] Yes
IPA, schedule 3 pat} table 4, tem o: IPA schedule & part 7, iabie 4, dem 2, Fisheries Reguiahon 199% 173A (sell assessable codes): IP Renulaion, schedule 2 table 2, tem ct i
Regulation, schedule 1, part 3, table 4. tent &, series Ari 1904, section 76D (old iver aie): Wild Rivers Act 200%, sector 45A
=
DECLARED FISH HABITAT AREA; WILD RIVERAREA . ~ . |
4.13 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
EX] No - Goto 04.74
(1 Yes
IPA schedule 8 uatt 1 table 4, dem 7 IVA schedule & part 2. table 4. dent 3: Fishenes Reyulation 199 STA (sell asessable ondest IP Requtation, schodute 2 lable Zale dlr iP
Reguiaton, schedule 1, patt 3, table 4, dem 7, Wild Rivers Act 2005, sections 434, Fisheries Act, section /6D0 (wikt tiver avea)
jREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |
4.14 ‘s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
EX) No -Gotoas1s (] Yes
JPA, schedute 8, pant 1, table 4, vein @, IPA. schedule 8, pant 2 labie 4, item 4, Fishores Regulation 1995 91144 (sell asseysable cndes), P Reguizton schedule 2 tatde 2. tern 2: IP
Reguignun, schedule 7, part 3, table 4. lem 4, Fishetes Act 1994, section /6D8 (wild ver aina} Wael Rivers Act 7005, section 43A, relevant wild iver declaration, Wid Rivers Code
WILD RIVER AREA '
4.15 \s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
RX] No -Gotoas16 [_] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 43A
{STATE-CONTROLLED ROAD }
4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No - End of section 4 (Yes
IP Regulation, schedule 2, table 2, item 3
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims alll liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.
Page 13
eo WITLENTIC -
INTEGRATED PLANNING ACT 1997 Past A, Version 3.0, 3 September 2007
bee
\s ROU PLN ole ics eal 9 eLUO
Common details
identification of tha premises the subject of the application ‘o. Fay }
1. Can any part of the premises be identified by a street address or lot on plan description?
[[] No - Answer Qifa)
X Yes - Complete Table B and answer Qi(b) and Q1(c)
@ Table B
ie ee re ~~ ~~ Cot on plan description oo vd
Unit | Street c Official suburb | Post Glace each descnption ita separate row) . a4
number} number} ~~ Street name “| -focality name -} code “tot Pletrtype ““} Plan Local government area |
avithber (ay RP SPP number
410 The Promontory Noosavifle 4566 845 SP 102579 Noosa Council
1(b). Can the address be further described by shop/tenancy number or storey/level?
DX No
(1 Yes - Complete Table C
4(c). _ Is any part of the premises strategic port land under the Transport Infrastructure Act 19947
DJ No
C1 Yes - Complete Table D
@ 2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on a site within a large rural tot)?
BX No
CI] Yes - Complete Table &
3. Are the premises within or adjacent to a water body or watercourse?
[J No
(J Yes - Complete Table F and answer Q3(a)
Table F
1 Noosa Waters Canal
3(a). _ Is any part of the development proposed in tidal waters (ie. below high water mark)?
[No
C] Yes
Page 14
INTEGRATED PLANNING ACT 1997 Part A, Version 3 0, 3 September 2007
4. Whatis the total area of land that makes up the premises (i.e. the area covered by the application)?
~~~ rea of land above high water mark/outside watercourse ~ Area in a water body or watercourse oe
747.00 [Xjm? [Jhectares (Tick applicable unit) [)m? {hectares {Tick applicable unit)
Existing use of the premises
5. Are the premises currently used for any purpose?
[X] Ne
CO Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. location
and nature of existing uses, buildings, structures and services
6. Are there any existing easements on the premises (e.g. for vehicular access, electricity, overland flow)?
[—X] No
[7] Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application
(Proposal details }
7. Are new uses proposed on the premises?
[J No
[X] Yes - Provide details in Table |
Table |
_—_ Each proposed new use a
{ New Timber Jetty
2 Pneumatic boat storage device
8. Are new buildings or structures proposed to be erected on the premises?
LJ No
4 Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the
application
‘Applicant details ]
9. Who is the applicant for the application?
Companylorganisation name |i om & Marilyn Mackenzie C/- Noosa Jetty Builders
(if applicable)
individual contact persondetals a __
Postal address [PO Box 299 Noosaville 4566
Contact telephone number lo7 5474 3480
|
|
Mobile phone number [0408 137 526 |
|
Facsimile number lor 5474 3480
e-mail address [[email protected]
jOwner's consent and resource entitlement
10. Does the application involve a State-owned resource prescribed by schedule 10 of the /nfegrated Planning Regulation 1998 {IP Reg) or
any other regulation?
X] No
(] Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement
Page 15
INTEGRATED PLANNING ACT 1997
Part A, Version 3 0, 3 September 2007
141. Does the application involve land other than State-owned land (i.e. privately owned land) and require owner's consent?
(No
&X Yes - Complete Table K and submit. with the application, written documentation of all owner's consent
Table K
po ee ~~ | Date written consent |
7 Owner name/s Street address or lot on plan description was obtained
1 Malcolm & Marilyn Mackenzie 10 The Promontory Noosaville 4566 05/02/2008
(Mandatory attachments and supporting information 7
12. What are the other parts of IDAS Application Form 4 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?
Description of attachment or information _ Title (# appilcable) | Wethad of defvery to |
E feg. Part C of Form 1, owner's consent, evidence of } (e.g. General Authority James SteetTrafiic . Date Method of delivery to {
b resource allocationentitiement, plans, crawings, repoits) Report) assessment manager |
1 Part E 05-Feb-2008 | over the counter
2 Checklist 05-Feb-2008 | over the counter
3 Owners consent 05-Feb-2008 | over the counter
4 Plans Feb 2008 over the counter
[Portable Tong Service Leave (PLSL) fevy tor building and construction work
13.
the application can be given?
&] No
CI Yes
13(a).
Indicate the reason PLSL is not applicable
J
ts payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
[J The application is not for building and construction work under the Building and Construction Industry (Portable Long
Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of work carried
out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching
vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); or
All costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
&
(The work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority
Act 1997- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number
stated). The receipted form must be sighted by the assessment manager before a development permit can be given
OFFICE USE ONLY
Date Received
Reference Numbers
|
| 28] 12
FOR COMPLETION. BY ASSESSMENT MANAGER
Is a QLeave Notification and Payment Form required for this application?
[J No
(71 Yes - Complete Table M
Page 16
INTEGRATED PLANNING ACT 1997 Part A, Version 3 0, 3 September 2007 L NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To Council | have been engaged as the private certifier for the building work referred to in this application = ' ee = ft Accrediation number ; Name ; a BSA Certification number Building Classification
Page 17
INTEGRATED PLANNING ACT 1997 Part A, Version 3 0, 3 September 2007
Advice for completing Part A
Genera! advice
Under IPA, section 3.2.1(7} mandatory requirements must be correctly completed for a development application to be a ‘properly made application’.
The assessment manger may refuse to receive an application that is not properly made.
Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications,
are stated in other Parts of Form 1.
The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building
Act 1975 only.
For further information about completing this form go to {DAS Guide 1 (Making and IDAS application)
qi
The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the local government.
The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or
other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
A description of the land is not required if the application relates to a mobile and temporary Envronmentally Relevant Activity (ERA)
only. Instead complete Q1(a).
StrategicPortland is within a local government area but a local government's planning scheme does not apply on Strategic Port Land.
StrategicPortLandis declared under the Transport infrastructure Act 1994, For further information go to IDAS Guide 11 (Development
on strategic port and) and the Queensland Transport (Ports) website.
Q2
Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application.
Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.
Q3
Asingle development application may involve land both within and outside waters.
A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
which high spring tide ordinarily flows and reflows (unless a regulation has declared a limit for the watercourse). Generally, a
watercourse is in the jurisdiction of the Department of Natural Resources and Water.
“Tidal water is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land
is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to
high water mark at spring tides) establishes the boundary of a tidal area.
Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993.
Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark, A tidal area for strategic
port {and is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for
a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for
prescribed tidal works within the tidal area for a local government, and the planning scheme may be applied to that assessment (to the
extent provided for in the code for prescribed tidal work).
a9
The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form 1 Application Form (including this Part and any other relevant Part) is correct.
(f the applicant is a company or organisation, a contact person must be nominated.
Evidence of this consent may need to be provided before the application will be accepted as property made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.
Q10
Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Requlation
Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence..
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material betow high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark.
In the case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement
In the case of State-controfled roads, a resource entitlement is not required for an activity that is exempt ancillary works or
encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.
Page 18
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 Qi . Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner!s, if the application involves any of the following: (i) a material change of use; (ii) reconfiguration of a lot, (iti) work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or (tv) work on rail corridor land defined under the Transport infrastructure Act 1994. . “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent). - Owner's consent is not required for a mobile and temporary ERA. Q12 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A. 13 . The Building and Construction industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of the work, whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy. The Building and Construction industry (Portable Long Service Leave) Act 7997 (PLSL Act) defines the building and construction industry for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land. ¢ The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a development permit for certain building or operational work. The assessment manager must sight an approved form issued by QLeave advising of the status of the payment of the levy. Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.qid.gov.au For further information contact QLeave (Tel: 1800 803 481 Web: www,gleave.qld,.gov.au ) Privacy Statement The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or as required by Parliament. This information may be stored in a Department of Local Government, Planning, Sport and Recreation database. The information collected will be retained as required by the Public Records Act 2002. For further information on your privacy, contact the Privacy Contact Officer for the Department of Local Goverment, Planning, Sport and Recreation at (07) 3237 1860. Proposal ID ~ Glick here to submit your DA
Page 19
a SRD RIOM
| oe
YY
pvvowoumr i yaa
CLUL0099 £0 284 LELLONNE 20 Atl
s00r 0 unaen,
900 OG Od / Grumey BURG wy
Ad ONL OS
emenning efyong We) | PEARS
el
428 CBE O10 KO
sejejo0ssy 9
uepsON UYyOor fr
W/L CL) ALé SUT OEY
SUSLVM VSOON|
AYOLNOWOUd SHL
OL'ON
Se 101
ALLar GasOdOud
3IZNSMOWW ‘W
su3z0ting
ALLS VSOON
QUT Ald L-ad
aa)
Q3aA0uddv SNVId
TON daulis SSUON gags
NV1d 3LIS
WA3M HSIevd
625701 dS
sve LO1
NOLLERIDS20
Aluad0ud Tvau
oe:
M NOILVWAST2 30IS
oor.
LNOAV1 ONINVYS
+—_——+
tt
CABO AS
Aisa ZOVUOLE ivVOS
erge *
aie Bw ap, 2
at Rj
Sve LOT
—H
AMWOLNONOUd AHL
3009 ONMid - 6542 SV HLM
SONVOYOOOV NI GATIWLSNI 38 TIVHS SFlid TV
‘9 CUVZVH OL GALVsuL GNV
QOOMCUVH G3A0UddY 38 TIVHS S3lid TV
‘ST
OHV ¥P'0 TH YALVM WONKININ
OHV 00'2 Ta T3A37 GOOT4 a3quoosu WAWNIXWN
Page 20
- . . ‘
7
‘
oa
1.0m x 1.0m HULL HOLDER
"|
7375 Lo:
BS
worm -7220 — a eo i 8
; z
125 5: :
2998 1 2990 | +990 #
| || z |
i} 3
z |
na!
ce
Oo
g a |
% |
| bss A |
2 a
— Fe wo
{ULT 049] aA i
a
g |
© a:
a
2
OW GUIDES 3.0m x 1.0m (ULT 003} 3.0m x 1.0m {ULT 003] 1.5m x 1.0m SWitt FRONT
(ULT 031) {ULT 0061 a
w
J
15 d
—— FY
rake
lomslial ‘TOPEAL 15 Tome BOVE PORT ORR
Page 21
Sunshine Coast and Use SECTION FEES Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation §20 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Materiat Change of Use - Code/tmpact Consistent 521 Inconsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 r Extension of a Currency Period 521 Operational Works - Landscaping 521 Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour §22 One Hour §22 ADVERTISING . Purchase Advertised Applications §23 JETTIES / : _ Jetty Application Fee 630 524 Jetty Bond 51 (Category 4) BONDS ' Performance Bond 51 (Category 9) Ss v Registration Fee . 222 SEARCH FEE . . . Search of Land Use Section file. 112 Liquor Licensing Request ms 113 TOTAL $ 650 NAME: (Xe. Ze Ply Ley ADDRESS: Do ban. 2924 Nee SoA ge “Sb FILE NO: os! Ch.o - DATE: Hulok receiptNo: |) 3B9US YS Signature of TP Officer: 5 Se AUTHORITY NO: (+/ aoe] colt
Used in these records
08/0610 - Transport Type 5 - Boat lifting device (Inc INCORRECT 3m boat lift plans) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.