INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkhist, Version 21.2, 31 March 2008
Fr cae rr rrmemerrcanic te ner en een CMT INA WI DCH |
ASSOCIATED With RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA . .
42 Is any of the proposed operational work associated with reconfiguring a Jot and the reconfiguration is also assessable?
PX] No -Gotoas3 [_] Yes
IPA, scheduie 8. part 1, table 4 dem 2: IP Regulation, schedule 1, patt 2. table 5, iter: Hep
Wild Rivers code (Nate the code does not currently contain appix ab'e prowsions for residential, industrial or commercial ceveloment diside a designated urban
area}
NEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA |
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
KX No -Gotoos4 ([] Yes
IPA, schedule 8, part 7, table 4, tems 1A 1G, IP Regulation, schedule 2, lable 2, dem 5 (vegetation clearing). {P Regulation, schedule 2, table 2, tem 34 (koala
conservation), IP Regulation, schedule 1, part 3, table 4, tem (vegetation clearinghwid river area): Vegetation Mariagement Act 1999, section 22A {vegetation
clearing/witd river area), Wild Rivers Act 2005, sectians 31F and 43A
{TAKING OR INTERFERING WITH WATER; WILD RIVER AREA |
44 's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Gotoa4s [[] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, teins 3a); IP Regutaon, schedule 2, table 2, item 8, IP Regulation, schedule 7, part 2. tafe 4, terns 3 and 3A; Water Act 2000, section 968A (vikd ter
area), Wi! Rivers Act 2005, section 42: relevant wild river dectaration: Wid Rivers Code
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW. If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(b), IP Regulation, schedule 2, table 2, item 8 IP Regulation, schedule |, part 3, table 4, tem 3
Wid Rivers code (Note. the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[X] No -Gotoas.7 (_] Yes - Answer (a) and (b) below
IPA, schectile B part J, table 4, dem 3(cit) IP Regulation, schedule 2, table 2, lem 8 1P Regulanon, schedute 1, part 3, table 4 item 3; Water Act 2000, section 986A (yall river aie,
{Wild Rivers Act 2005, section 43/, relevant wit liver declaration, Wik Rivers Code
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)? ,
BJ No -Gotoass [_] Yes
IPA, schedule 8, part i, table 4, item 3{c)(i); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wild ver area)(Note. no current Wild River declaration :denities taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub aftesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
[EX] No -Gotoas9 [[] Yes - Answer both (a) and (b) below
IPA schedule 8 par 1, table 4 items iopty and dy, IP Reyedatos, soheckile 2. tab 2, dom 9, IP Requiaton, schedule 1, patt 3 title ¢ dem 3A, Water Act 2000. sechon 9358 (ei
river ate} celavant vaid (wet deciatatan Wad Kivers Cade
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J No OO Yes
(i) To increase the storage capacity of a referable dam by more than 10% — No ) Yes
if yes to either or both (i) or (ii) above - (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not ihe Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schechile 8, part 1, table 4, tem 4, IP Regulation, schedule 2, table 2, item 10
{TIDAL WORK; WILD RIVER AREA . . J
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[XJ No -Gotoa4.11 ((] Yes - Answer (a) and (b) below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0610 - Transport Type 5 - Boat lifting device (Inc INCORRECT 3m boat lift plans) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.