INTEGRATED PLANNING ACT 1997
Building &/or operational works assessable
against a planning scheme
SSSR RIE SEs, EN PI IE
4. Nature of work that requires assessment against a planning scheme:
([] Building work - Complete Table A Operational work - Complete Table 8
Table B
@ (i) What is the nature of the operational work?
(] Roadworks (J Stormwater {_] Water infrastructure L_] Sewerage infrastructure
(J Landscaping (FD Earthworks [J Orainage Works J] Signage
J Clearing vegetation under the planning scheme Other - Specify below
Boat Storage Device
(ii) What type of approval is being sought? (VOTE: If you have indicated multiple operational works in question (} above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these delails in an attachment to this form)
(J Preliminary approval J Both (Specify below)
[X] Development Permit
(ii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision?
BX}No — ([] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Pretiminary Approval for MCU or reconfiguring
a fot)
No {[] Yes - Compiete Table Bfa)
$ 10000
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour)
oy
Syptieteouen 2 Bs un ne
3. Confirm that the following mandatory information accompanies this application
Plans, andspecifications if applicable, showing the nature and location of the proposed works fincluding the
extent of any cut and fii) {XJ Confirmed | over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
le Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.
Ql A development permit authorises development to occur, while a preliminary ‘approval is a step in the approval process and does nol authorise development to occur
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0610 - Transport Type 5 - Boat lifting device (Inc INCORRECT 3m boat lift plans) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.