Original source · versioned page text
Revised Civil Engineering Plans
Original PDF page 6, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFLOW
TW119.800
BW118.200
WEIR 119.35 117.80
00
BW118.3 00
SL - 119.900 THROUGH BACK OF CARPARK U05 & U06
00
40
117.20 116.80 5.
TW119.8
117.11 ILin - 119.360 6.00
6.8
116.6
6.4
6.2 11
PROPOSED 7.00
DETENTION TANK 116.60 ILout - 119.335
REFER TO 2123-R07
SW
RY
EXISTING BOUNDA
SW
FOR DETAILS.
a:\2123-lot 4 taylor court, cooroy\acad civil opw\2123 opw set.dwg
DRAINAGE
RESERVE NOTE:
REFER ARCHITECTURAL DRAWINGS FOR
FINAL BUILDING FOOTPRINTS AND FLOOR
PLANS TO PROPOSED DEVELOPMENT.
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED PROPOSED INDUSTRIAL DEVELOPMENT 2123
A 15-12-2021 FOR APPROVAL KE DB LOT 4 TAYLOR COURT, COOROY
DATUM AHD SHEET: 6 OF 11
B 10-03-2022 AMEND GENERAL LAYOUT CS CL 0 5.0 10 15 20 25m MAROOLINGAR P/L ATF TWENTY20 UT
C 04-04-22 FOR APPROVAL DTB DTB DESIGN KE
................. DRAWING TITLE: DRAWING NUMBER REV
DRAWN KE Director: CAMERON LANDRETH
SCALE 1:500 A3 Director: TONY SHELLEY
DESIGN CHECK CL (RPEQ
(RPEQ19358)
7736) 07 5443 8285 R06 C
This drawing is not to be copied or amended without written permission from [email protected] www.barlowshelley.com.au
DATE DEC-2021 Barlow Shelley Consulting Engineers PO Box 899 Maroochydore 4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.