Council archive · source document
Decision Notice - 010.2007.00000911.001 [As Published] · 132007.911
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 7
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
General
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are titled and numbered Ground Floor Plan, PL 02-1; First Floor
Plan, PL 02-1; Elevations, PL 01-2; Elevations, PL 01-1 and Section & Elevation, PL 01-3 prepared by
Artech Property and dated 19 April 2007 (Revision A) and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. The building shall not exceed 2 stories and 8 metres in height above natural ground level.
4. A minimum of 20% of the site is to be maintained as soft landscaping, as defined by The Noosa Plan
5. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
6. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the
detached house. The tank is to be installed to ensure water from the tank can be used both:
6.1. for external use such as watering gardens, irrigation, ornamental ponds or water features, topping
up swimming pools, outdoor cleaning; and
6.2. for use in flushing of toilets internal to the building.
7. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
constructed under overhead electricity transmission lines, or within any easements.
Building Demolition
8. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
damage and made safe to the standard required by the regulatory authority;
9. All infrastructure must be disconnected, capped or sealed including:-
electricity meters removed and electrical wires disconnected; and
telephone lines are disconnected; and
high speed data cables and television provider boxes are disconnected and removed to the
standard required by the regulatory authority;
10. All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
must be removed from the building and disposed of in accordance with industry best practice.
11. Waste generated during construction must be stockpiled in a centralised location and covered as required
to prevent material being blown onto adjoining properties including the road reserve or food waste from
generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
or via an approved waste receptacle and collection service. Storage areas are to be located near the
temporary access to the site so that access can be gained with out damage to infrastructure.
12. All building materials containing asbestos products must be disposed on in accordance with industry best
practice.
13. A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel;
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@d808851f\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00000911.001 [As Published]Related documentApplication case desk ↗