Council archive · source document
Information Request OPW20 0146 · OPW20/0146
Officer: Diogo Carrico Direct Telephone: 07 53296465 Our Reference: OPW20/0146 Your Reference: 085-001 23 September 2020 Bax Engineering Pty Ltd 2261 David Low Way PEREGIAN BEACH QLD 4573 [email protected] Dear Sir Information Request Planning Act 2016 I refer to your application and advise that Council requires further information to satisfactorily assess the proposal. application details Application No. OPW20/0146 Street Address: 29 Turpentine Rd Ringtail Creek Qld 4565 Real Property Description: Lot 5 RP 846208 Planning Scheme: Noosa Plan 2020 (31 July 2020) INFORMATION REQUIRED The information requested is set out below: Issue Stormwater discharge. It is not clear that the proposed works will not create worsening conditions to downstream properties, namely by concentrating stormwater being discharged from the subject site. Information Required Demonstrate that the proposed works will not concentrate stormwater being discharged from the subject site into neighbouring properties (i.e. Lot 18 RP225617; Lot 9 RP225110; and Lot 10 RP903125). Provide RPEQ certification that the proposed works will not create worsening conditions to any neighbouring properties, with regards to stormwater discharge (i.e. the proposed works will not cause ponding to upstream properties nor concentrated flows onto downstream ones). Issue Given the extents of the earthworks and the large area to be disturbed, Council has some concerns with regards to how erosion and sediment runoff will be controlled. Information Required Provide a detailed Erosion and Sediment Control Management Plan, prepared by a CPESC or RPEQ, which includes information on, but not limited to: Layout of proposed controls during construction; How “dirty” water will be managed; How “clean” water will be diverted from the destabilised area; How the works will be stabilised immediately after being completed; How areas that are not part of the final cut/fill pad but will be disturbed as part of the works (access tracks, manoeuvring areas, etc.) will be stabilised in the short and long term; Maintenance regime of the proposed controls; Where the topsoil will be stockpiled and how it will be stabilised. Provide CPESC or RPEQ certification that all proposed E&S controls have been sized in accordance with relevant standards and legislation, and suitable contingency measures will be available onsite, or able to be deployed to site prior to being required. due date for response to information request The due date for providing the requested information is 23 December 2020. Please advise Council of your response to this information request in accordance with section 13 of the Development Assessment Rules. If you do not provide a response before the due date, it will be taken as if you have decided not to respond to the information request and Council will continue with the assessment of your application. other details You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online Services” page can be accessed via "Quick Links" on the left hand side of the screen. Should you have any further queries in relation to the above, please do not hesitate to contact me on the number above. Yours faithfully Diogo Carrico Development Engineer [word/footer1.xml] Page 2 of 2 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 2 [word/header1.xml] 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Request OPW20 0146Related documentApplication case desk ↗
About this file
- File size
- 75 KB (small file)
- File type
- DOCX
No other editions are linked here.