                                      Form 6 - Negotiated Decision Notice
                                      INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:        2007/70                          Date of Decision:     24 October 2007

1.          APPLICANT DETAILS

 Name:                 Michael J Powell

 Postal address:       CARE Martoo Consulting Pty Ltd
                       PO Box 1684
                       NOOSA HEADS QLD 4567
 Phone no:             07 5455 5425           Fax no:      07 5455 5725

2.          PROPERTY DESCRIPTION

 Street address:       14 Little Cove Road Noosa Heads

 Real property         Lots 1 & 4 RP 108495 & Lot 48 RP: 52918 County of March, Parish of Weyba
 description:

3.          OWNER DETAILS

 Name:                 Michael J Powell

 Postal address:       14 Kensington Gate
                       LONDON W8 5NA ENGLAND UNITED KINGDOM

4.          REFERRAL AGENCIES

 Referral Agency              Address                                                 Basis
 N/A

5.          APPLICATION TYPE

 Development                       Development Details                       Preliminary          Development
                                                                              Approval               Permit
 Material Change of Use            Two Detached Houses                           No                   Yes

     Lot Reconfiguration           Boundary Realignment                          No                   Yes

6.          DECISION DETAILS

Council on 4 July 2007 decided to approve the application and grant a Development Permit, subject to
conditions.
In relation to representations made by the applicant Council on 24 October 2007 decided to:
       A.      Agree to delete Conditions 37 and 43.
       B.      Approve a change to Conditions 67 and 68 to read as follows:
       C.      Issue a Negotiated Decision Notice in accordance with the above recommendations.

7.          APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Detached House Driveways Code.
Full text of the other 13 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                              2 of 14

8.     SUBMISSIONS

Not Applicable.

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Development Permit for Operational Works            Access & Carparking and Stormwater drainage

 Development Permit for Building works               All Building work

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                              Date:      26/10/07



DECISION NOTICE HISTORY
 Original Decision Notice 4 July 2007.
 Negotiated Decision Notice with amendment to
   Conditions 67 & 68 deletion of conditions 37 & 43
   on 24 October 2007 .




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                               3 of 14




                                      Noosa Council Conditions
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


Land Use
1.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plans are titled and numbered SK.201 Rev. E dated 22 May 2007 and
      SK.202 Rev. C, SK.203 Rev.A and SK.204 Rev A dated 23 April 2007 prepared by Kidd & Co Designers
      and as may be amended by these conditions and annotations on the plans.

2.    The development must be undertaken and operated in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
      emissions.

3.    A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service each
      detached house. The tank shall be installed to ensure water from the tank can be used both:

      3.1.   for external use such as watering gardens, irrigation, ornamental ponds or water features, topping
             up swimming pools, outdoor cleaning; and

      3.2.   for use in flushing of toilets internal to the building.

      All rainwater tanks are to be designed and installed in accordance with the Queensland Development
      Code (QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with
      the building approval. The location and capacity of the tanks shall be clearly shown on the plans
      submitted for Building Works and Operational Works approval and any overflow shall be directed to the
      stormwater drainage system.

4.    Fencing shall not exceed 2.0 metres above the natural and finished ground levels. Similarly, the
      swimming pool and splash proof fence above coping height to be built to the boundary shall not exceed
      2.0 metres above natural and finished ground level.

5.    All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
      (LPG or natural).

6.    The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
      Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
      and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
      comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
      exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
      requirement.

7.    Buildings and structures (including swimming pools, sheds, and outbuildings) shall not constructed under
      overhead electricity transmission lines, or within any easements.
Vegetation
8.    Existing trees on the site and within road reserves are to be retained, except where required to be
      removed due to building operations or the conduct of the approved use.

9.    All vegetation to be retained shall be protected from interference resulting from clearing or construction
      activities by:

      9.1.   Clearly marking vegetation to be retained with flagging tape;

      9.2.   Installing protective fencing around the drip line of the vegetation;

      9.3.   Stockpiling, storage and vehicle parking occurs in already cleared areas and does not cause
             interference with vegetation; and

      9.4.   Low impact construction techniques shall be used around vegetation to minimise interference with
             the vegetation.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   4 of 14


10.   Cleared vegetation is to be suitably processed by one of the following methods and removed from the
      site:-

      10.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
            heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
            between edges of heaps.

      10.2. Disposal for firewood.

      10.3. Disposal for landscaping purposes.

      10.4. Transport to alternative site for breaking down materials provided that all necessary permits have
            been obtained to allow the alternate site to be used for this purpose.

      10.5. The Applicant is advised that other methods may be considered provided full details of the method
            are submitted.

11.   The vegetation removed from the site shall be replaced with 14 tube stock trees (minimum 200mm pot
      diameter) consisting of a mixture of native, endemic species such as Corymbia citriodora, Corymbia
      intermedia, Corymbia tessellaris, Callitris columellaris, or Eucalypts of local origin. This vegetation shall
      not be planted within the sewerage zone of influence area.

12.   The large Bloodwood (Corymbia spp.) adjacent to the driveway entry shall be retained except where
      required to be removed following the issue of a Development Permit for Operational Works for access and
      carparking. Should the tree be required to be removed, then a suitable 100 litre replacement tree such
      as Corymbia intermedia or Corymbia tessellaris shall be planted in the front setback area of Lot 1.

13.   All replacement vegetation shall be maintained for a minimum period of 12 months prior to the release of
      the security bond.

14.   Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted, to
      secure performance of all conditions of this approval, prior to the issue of a Development Permit for
      building works. The cash bond or trading bank guarantee will be returned on performance of the
      conditions of approval less any costs incurred by Council in respect of enforcing performance of this
      permit.
Landslide Hazard
15.   A geotechnical report, prepared by a registered professional engineer shall be obtained, and it shall:-

      15.1. certify that the site is not at risk from landslide emanating from the site or from other land; and
     15.2. identify methods of stabilising all buildings, accessways and uses areas.
     The development shall implement any recommendations of the geotechnical report.
Demolition or Relocation of Existing Dwelling
16.   Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
      damage and made safe to the standard required by the regulatory authority.

17.   All infrastructure must be disconnected, capped or sealed including:-

      17.1. electricity meters removed and electrical wires disconnected; and

      17.2. telephone lines are disconnected; and

      17.3. high speed data cables and television provider boxes are disconnected and removed to the
            standard required by the regulatory authority.

18.   All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
      must be removed from the building and disposed of in accordance with industry best practice.

19.   Waste generated during construction must be stockpiled in a centralised location and covered as required
      to prevent material being blown onto adjoining properties including the road reserve or food waste from
      generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
      or via an approved waste receptacle and collection service. Storage areas are to be located near the
      temporary access to the site so that access can be gained with out damage to infrastructure.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                               5 of 14


20.   All building materials containing asbestos products must be disposed on in accordance with industry best
      practice.

21.   A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel.

22.   Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
      relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.

23.   Sediment and erosion control measures must be placed on site prior to the works commencing and shall
      be maintained until all works are complete. The erosion and sediment control measures shall be in
      accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
      Healthy Waterways (copy attached or available at www.healthywaterways.org).

24.   All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed
      areas are revegetated using species identified in PSP3 – Landscaping Plants and Guidelines.

25.   The transportation of all materials to and from the site must be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
      shall be covered to prevent materials including dust being windblown from the vehicle

26.   The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses if the use has not
      happened by 4 July 2011, unless an application to extend the currency is approved by Council.
Land Development
27.   For the purpose of these conditions, the following definitions apply: -

      27.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
            Council pursuant to S3.7.1 of the Integrated Planning Act 1997.

      27.2. A Registered Professional Civil Engineer (RPEQ) means an civil engineer who is listed under
            the Institution of Engineers, Australia “National Professional Engineers Register 3” (NPER 3) or an
            engineer who is registered in Queensland pursuant to the Professional Engineers Act 1988.

      27.3. The person acting on this permit means any person or company who undertakes development
            pursuant to this permit.

      27.4. AS/NZS 2890.1:2004 means Australian Standard for Off Street Carparking – AS/NZS
            2890.1:2004.

      27.5. Principal Contractor means the person nominated by the Applicant and approved by the Manager
            - Land Development at a pre-start meeting as being responsible for the major component of works
            associated with a Development Permit for Operational Works of any works on the site.

28.   In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation
      shall be presented to Council and shall be submitted in the correct form with the fees prescribed in
      Council's adopted fee schedule.

29.   Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and charges due and
      payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of
      the Plan of Survey for each stage.

30.   Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil Engineer
      shall be submitted to Council for each Development Permit for Operational Works issued pursuant to this
      permit. The engineer shall certify that he has supervised those works and that they have been completed
      in a workman like manner in accordance with good engineering practice and in accordance with that
      permit.

31.   Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
      providers to ascertain the location of their underground services.

32.   For the following classes of work associated with development, a Development Permit for Operational
      Works must be obtained prior to commencement of works relating to that class of work. The application
      may combine any or all of these classes of work: -

      32.1. Access and carparking



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                               6 of 14


      32.2. Stormwater Drainage

33.   The person acting on this permit shall apply and obtain for all other necessary permits including crane
      permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals
      required under any other Act.

34.   The Assessment Manager for building work shall ensure that all other permits required by this permit have
      been obtained and outcomes from imposed conditions incorporated into the building plans prior to issue
      of a Development Permit for Building Works.
Vehicle Access
35.   A vehicular access driveway to serve the development shall be constructed from the Little Cove Road
      frontage of the site with a maximum width of 3.5m within the road reserve.

36.   The vehicle access driveway within the site shall be setback at least 500mm from the western boundary
      with this strip of land being landscaped in accordance with Council’s Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines.

37.   Deleted.

38.   The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
      vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
      without any step or level difference. Should any driveways be constructed to grades that do not comply
      with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
      that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
      footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
39.   The driveway shall be designed and constructed to join smoothly with the adjoining access driveways and
      not concentrate or direct stormwater runoff on to adjoining properties. Any damage to the adjoining
      access driveways that occurs during the construction of the new driveway shall be reinstated with suitable
      matching materials to the satisfaction of Council’s Manager Land Development.

40.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the
      driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight
      line requirements as defined in AS2890.1, section 3.2.4. The applicant shall demonstrate compliance by
      illustrating these sight lines on the plans submitted for Operational Works.

41.   All vehicles shall enter and leave the site in a forward direction.
Vehicle Access/Visitor Carparking Easements
42.   A vehicle access easement shall be created over the proposed driveway that gives access to proposed
      Lot 2. The easement shall be a minimum of 4.5m wide (with the width being increased where necessary
      to accommodate manoeuvring areas, passing opportunities) and shall benefit proposed Lot 2 and burden
      proposed Lot 1.
      In this regard, plans submitted for Operational Works approval shall accurately show the location of the
      easement. In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles
      Office and any additional Titles Office forms or requisitions requiring the consent of Council will be
      attended to promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
      commencing.
      Any changes required by Council’s Solicitor must be corrected immediately.
43.   Deleted.

Car Parking
44.   Carparking shall be provided within the site generally as shown on drawing number SK.203 as prepared
      by Kidd & Co designers dated October 2006, and as otherwise amended by conditions of this permit.

45.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
      class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum
      head clearance (headroom) at any point of 2.2m.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   7 of 14


46.   All carparking shall be kept, maintained and line-marked in a condition fit for use.
Vegetation Protection & Preservation
47.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained shall be
      designed as a pervious pavement (such as grass paving cells or similar), as this will allow water that falls
      on this surface to penetrate to the trees root system. The pavement shall be constructed so as not to
      damage the tree or their root system and in this regard temporary fencing shall be provided around the
      trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious
      pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works.
48.   Where retained trees are located in areas proposed to be filled on site (or are located on neighbouring
      allotments to the actual site to be filled), there will be a need to prevent fill material from being placed on
      the trees root system. To this end the design of the filling works will need to incorporate terracing around
      the tree or a similar means of ensuring that the natural ground level around the trees remains generally
      the same as existing. These measures shall clearly be shown on the plans submitted for Operational
      Works approval and any drainage required to drain these areas shall also be shown on the plans.

49.   All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and Stock Route
      Management) Act 2002 are to be controlled on the site prior to Council endorsement of the plan of survey.
      In this context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3 pests it
      shall mean removal of the plants where they threaten environmentally significant areas of the site such as
      riparian zones and areas of natural vegetation.
      Where class 3 plants are removed as a result of this condition and there is not sufficient natural
      regeneration of native species, the areas shall be replanted with endemic native species so that a
      sustainable natural ecosystem is restored.
      Council’s Conservation Management Supervisor will not inspect the site until 30 days after the weed
      treatment and replanting is complete.
Frontage Works
50.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the Little Cove
      Road frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants &
      Guidelines. Grass shall be couch, free of weeds.

51.   All redundant vehicular crossings to the site shall be removed and replaced by landscaping such as trees
      and grasses in accordance with Council’s Standard specifications prior to the endorsement of the Plan of
      Survey.
Roof Water & Stormwater Drainage
52.   All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
      collected and discharged so there is no net increase in the rate of discharge as a result of the
      development for storm events up to a “1 in 100 year storm”.

53.   Stormwater runoff is to be controlled on site by using a combination of collection and reuse, detention and
      infiltration with excess runoff disposed of on site in such a manner so as to cause no scour or damage to
      the subject site, adjoining properties, existing waterways or any Council property to the reasonable
      satisfaction of the Manager - Land Development.
      A Development Permit for Building Works shall not be granted until a Development Permit for Operational
      Works has been issued in regard to the drainage scheme.
54.   All stormwater drainage shall be designed in accordance with the Noosa Planning Scheme Policy 5 –
      Engineering Design Standards – Roads, Drainage and Earthworks.

55.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
56.   Each lot shall be connected to Council’s existing sewerage reticulation systems and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.

57.   All connections to sewer system shall be carried out either by Council or by a Council approved
      Contractor and at no cost to Council.

58.   The existing sewer main that traverses the site adjacent to the eastern boundary and the ‘zone of
      influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the
      finished surface level) shall be accurately located and determined by a licensed Surveyor and shown on
      all plans submitted for Operational Works approval.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   8 of 14


     To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
     damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
     exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within
     1.5m of the centreline of the sewer main, whichever is the greater. As such the applicant shall amend
     Operational Works plans including Building plans to ensure compliance.
Town Water Supply
59.    Each lot shall be connected to Council’s existing town water supply and be constructed in accordance
       with Council’s standards and requirements at no cost to Council.

60.    Each individual water connection to the water reticulation system shall extend to the property boundary
       and be metered. All fees for the supply of water meters shall be paid to the Council.

61.    All water meters must be located outside the property boundary and in an easily assessable location to
       facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
       fences or locked gates. In this regard approval of the water meter configuration and location must be
       obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
       hydraulic drawings.

62.    Any connection to a water main shall be undertaken by Council.
Power/Telecommunications Services
63.    An underground electricity service shall be provided to each lot if not already provided.
       In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
       Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
       The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
       submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
       (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
       Survey.
       Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
       the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
       lots.
64.    The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
       new telephone services to the proposed lots. In this regard written confirmation from an approved
       telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of
       Survey.

65.    Any alteration of a public utility or other facility necessitated by the development of the land or associated
       construction works either internal or external to the site shall be at no cost to Council.
Service Easements (Sewer / Water / Stormwater / Power / Telecommunications)
66.    A registered easement shall be created over the zone of influence of all sewers within the subject site and
       over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
       easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
       twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
       finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
       accurately locate all sewer mains and determine the necessary width of the easement, which shall be
       shown on any plans submitted for Operational Works and Building Works approval. To this extent the
       surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
       be created.
       In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
       writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
       additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
       A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
       commencing.
       Any changes required by Council’s Solicitor must be corrected immediately.
67.    A registered easement in favour of Council shall be created adjacent to the Little Cove Road frontage of
       the site to permit stormwater runoff from the Little Cove Road road reserve to be discharged on to the
       subject site.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  9 of 14


68.   Development of the site shall not create any additional ponding of stormwater on any adjoining property or
      block any natural overland flows on to the subject site. A registered easement in favour of the benefited
      property shall be created over any stormwater drainage pipes or overland flowpaths within the site that
      convey stormwater from any adjoining property. The easement is to be centrally located over the pipework
      with a minimum width of 1.5m or be of sufficient width to ensure all associated pits and pipes are wholly
      contained within the easement. The terms of the easement shall include the responsibilities on the
      beneficiaries of the easement to maintain the drainage system so as to be operational at all times.

      Detailed site surveys indicating natural surface levels and contours of the adjoining upstream properties
      must be provided with the application for a Development Permit for Operational Works for Stormwater.

      Should evidence be provided to Council indicating that no runoff from the adjoining properties currently
      exists or that the proposal will not create additional ponding of stormwater on the adjoining properties the
      requirement for the drainage pipes and easement shall not apply.

69.   A registered easement shall be created over any service conduit, pipe, pole or other structure that is
      located within proposed Lot 1 and provides services to proposed Lot 2. The minimum width required for
      an easement shall be in accordance with the guidelines of the relevant authority.

70.   No building or other structure shall be constructed such that it encroaches over an easement.

71.   Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant of
      Easement shall be submitted to Council for perusal.
      Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of Survey.
      Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the
      endorsing of the Plan of Survey.
72.   Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor an
      appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land
      Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles
      Office forms or requisitions requiring the consent of Council being attended to forthwith.
Earthworks
73.   Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
      Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
      or the blockage of, or interference with, any natural watercourses.
      This may require the design and construction of drainage pipes and/or an overland flow-path within the
      development site that caters for drainage from the adjoining sites for a design storm with an Average
      Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the
      drainage pipes or overland flow-path will also be required. In this regard a Development Permit for
      Operational Works shall be obtained.
      Should evidence be provided to Council indicating that no additional ponding of stormwater will occur on
      the adjoining properties the requirement for the drainage pipes, overland flow-path and easement shall
      not apply.
74.   Earthworks carried out on site shall not affect the structural integrity of any of the existing fences and/or
      structures and/or lands that border the development site. Fences that are affected shall be replaced prior
      to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced
      shall be clearly shown on the plans submitted for Operational Works approval.
75.   Any fill material imported to the site (if any) must be from a site licensed with the Environmental Protection
      Agency or from a site for which a Development Permit for Operational Works has been issued approving
      the export of fill.

76.   A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of
      placing additional fill, prior to such fill being placed.
      Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper to the
      existing levels within the subject lot. Batters shall be at a maximum grade of 1:4 unless retained by a wall.
      Any existing fill or natural materials on the site which do not satisfy the Manager - Land Development's or
      a Geotechnical Engineer's requirements shall be removed and replaced with suitable material.
77.   Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A
      registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that
      all lots have been compacted to the required standard.
      Any existing fill on the site that does not comply with Council’s requirements shall be removed at the
      direction of the Manager - Land Development prior to additional filling works commencing.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 10

NOOSA COUNCIL IDAS Development Application Decision Notice                                                10 of 14


Erosion and Sediment Control
78.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
79.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
       various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
       amounts under the current Council policies and requirements is outlined in the table below:

          Contribution Required For:                                                          Amount:

          PSP12 – Public Open Space Contributions (Park)                                      $2,933
          PSP16 – Sewerage Headworks Contributions                                            $5,599
          PSP17 – Water Supply Headworks Contributions                                        $5,617
          PSP20 – Pathway Trunk Network Contributions                                         $659
          Local Roadworks Contributions                                                       $642
          TOTAL Contribution Amount =                                                         $ 15,450
          Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
          from March 2007 until the date of payment.
       All contributions must be paid prior Council endorsement of the plan of survey.

Site Stability
80.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
       soil classification, establish whether any measures are required to protect the stability of adjoining
       buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
       best suited for the proposed development. The recommendations of this report shall be incorporated into
       the design and construction of the proposed development.
General
81.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
       specifications for all engineering works, which shall be submitted in conjunction with an application for a
       Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the
       proposed cadastre layout is to be submitted in conjunction with any application for Operational Works.

82.    Digital detailed designs including drawings, calculations, specifications etc, shall be submitted with any
       application for a Development Permit for Operational Works in respect of roadworks and stormwater
       drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 –
       Engineering Design Standards – Roads, Drainage and Earthworks. To avoid conflict with underground
       pipes or services, all existing and proposed services required by the development shall be shown on the
       plans.

83.    To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
       in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
       available at www.adac.com.au).

84.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.

85.    Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant
       shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
       kerb and gutter, or other Council property damaged as a result of construction of the proposed
       development.
       If any person acting under this permit damages any Council property or facilities (such as underground
       drainage, water supply and sewerage), through any cause whatsoever in the course of, directly or
       indirectly carrying out development, that person shall forthwith notify the Manager - Land Development
       and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land
       Development. Alternatively, the Applicant may request the Council to carry out the rectification works.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 11

NOOSA COUNCIL IDAS Development Application Decision Notice                                                11 of 14


      Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
      undertaken by either Council or a Council approved contractor.
      In all cases, Council reserves the right to carry out rectification works in an emergency and where no
      reasonable attempt has been made to complete the rectification works as part of the development. All
      costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of
      the Plan of Survey.
86.   The transportation of all materials to and from the site shall be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
      be covered to prevent materials including dust being windblown from the vehicle.

87.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
      intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
      and structures. All of which shall be submitted to Council for checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage structures,
      finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
      As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
      www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied and
      accepted by Council.
88.   Where operational works are likely to affect nearby residents, at least 3 days notice of commencement of
      work, the name of the site supervisor, and a 24 hour contact telephone number shall be distributed to
      affected residents.

89.   Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the
      requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this
      regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1)
      of the Act, shall be submitted in conjunction with an application for Operational Works. If payment of the
      levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment
      manager.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 12

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  12 of 14



                                      Local Laws, Policies & State
                                      Regulation Requirements
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law
        No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that
        makes or causes audible noise to be made from the building work:-

        1.1.   On a Sunday or public holiday, at any time; or

        1.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
        A maximum penalty of $1,500 applies to an offence under this legislation.
2.      You are advised that the site is identified as a Koala Living Area under the Nature Conservation (Koala)
        Conservation Plan 2006 and Management Program 2006-2016 and may contain koalas. The use of a
        Koala Spotter is encouraged in areas where koalas are likely to occur, prior to the removal of Angophora,
        Corymbia, Eucalyptus, Lophostemon and Melaleuca species. Further information can be obtain from the
        Environmental Protection Agency at http://www.epa.qld.gov.au or Ph. (07) 32278185.

3.      Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
        operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
        accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
        Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
        requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
        works must be submitted to Council with the lodgement of any application for operational works over the
        site.

4.      Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa
        Council’s Plumbing Services Section in accordance with the Plumbing & Drainage Act 2002 (as
        applicable).

5.      The applicant is advised that development contributions and infrastructure charges applicable to this
        development approval have been based on the following Uses Class/ Uses and applicable quantities:-

                       Existing Development                                  Approved Development
          Existing Use Class /                                   Approved Use Class /
                                       Existing Quantity                                      Approved Quantity
                  Use                                                   Use
         Detached House             1 Dwelling                  Detached House              2 Dwellings



6.      The applicant is informed that approval of this development application will trigger an Infrastructure
        Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
        amount of $2,725 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
        March 2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
        Chapter 5 of the Integrated Planning Act 1997.

7.      The applicant is informed that payment via credit card transaction will not be an acceptable method of
        payment for development contributions conditioned in this permit or for infrastructure charge notices
        issued separately.

8.      The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
        boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
        obtaining a Development Permit for Building Works.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 13

NOOSA COUNCIL IDAS Development Application Decision Notice                                                        13 of 14



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Page 14

NOOSA COUNCIL IDAS Development Application Decision Notice                                       14 of 14

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Used in these records

About this file

File size
68 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07-0070 NEGOTIATED Decision Notice [As Published].pdf · 68 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.