20.   All building materials containing asbestos products must be disposed on in accordance with industry best
      practice.

21.   A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel.

22.   Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
      relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.

23.   Sediment and erosion control measures must be placed on site prior to the works commencing and shall
      be maintained until all works are complete. The erosion and sediment control measures shall be in
      accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
      Healthy Waterways (copy attached or available at www.healthywaterways.org).

24.   All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed
      areas are revegetated using species identified in PSP3 – Landscaping Plants and Guidelines.

25.   The transportation of all materials to and from the site must be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
      shall be covered to prevent materials including dust being windblown from the vehicle

26.   The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses if the use has not
      happened by 4 July 2011, unless an application to extend the currency is approved by Council.
Land Development
27.   For the purpose of these conditions, the following definitions apply: -

      27.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
            Council pursuant to S3.7.1 of the Integrated Planning Act 1997.

      27.2. A Registered Professional Civil Engineer (RPEQ) means an civil engineer who is listed under
            the Institution of Engineers, Australia “National Professional Engineers Register 3” (NPER 3) or an
            engineer who is registered in Queensland pursuant to the Professional Engineers Act 1988.

      27.3. The person acting on this permit means any person or company who undertakes development
            pursuant to this permit.

      27.4. AS/NZS 2890.1:2004 means Australian Standard for Off Street Carparking – AS/NZS
            2890.1:2004.

      27.5. Principal Contractor means the person nominated by the Applicant and approved by the Manager
            - Land Development at a pre-start meeting as being responsible for the major component of works
            associated with a Development Permit for Operational Works of any works on the site.

28.   In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation
      shall be presented to Council and shall be submitted in the correct form with the fees prescribed in
      Council's adopted fee schedule.

29.   Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and charges due and
      payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of
      the Plan of Survey for each stage.

30.   Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil Engineer
      shall be submitted to Council for each Development Permit for Operational Works issued pursuant to this
      permit. The engineer shall certify that he has supervised those works and that they have been completed
      in a workman like manner in accordance with good engineering practice and in accordance with that
      permit.

31.   Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
      providers to ascertain the location of their underground services.

32.   For the following classes of work associated with development, a Development Permit for Operational
      Works must be obtained prior to commencement of works relating to that class of work. The application
      may combine any or all of these classes of work: -

      32.1. Access and carparking



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Used in these records

About this file

File size
68 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07-0070 NEGOTIATED Decision Notice [As Published].pdf · 68 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.