15.5 Plans for trunk infrastructure
(1)      The plans for trunk infrastructure identify the trunk infrastructure networks
         intended to service the existing and assumed future urban development at the
         desired standard of service up to the planning horizon stated for a trunk
         infrastructure network in Table 15.4—Planning horizon for a trunk infrastructure
         network.

Table 15.4—Planning horizon for a trunk infrastructure network

  Column 1                                       Column 2
  Trunk infrastructure network                   Planning horizon
  Stormwater                                     2026
  Transport                                      2031
  Parks and land for community facilities        2031



15.5.1            Plans for trunk infrastructure maps
(1)      The existing and future trunk infrastructure networks are shown on the
         following maps in Schedule 9—Local government infrastructure plan mapping
         and tables:

         (a)   Local Government Infrastructure Plan Map LGIP-PFTI Stormwater—Plan
               for trunk stormwater infrastructure
         (b)   Local Government Infrastructure Plan Map LGIP-PFTI Transport—Plan
               for trunk transport infrastructure
         (c)   Local Government Infrastructure Plan Map LGIP-PFTI Public Parks &
               LCF—Plan for trunk parks and land for community facilities infrastructure
(2)      The State infrastructure forming part of transport trunk infrastructure network
         has been identified using information provided by the relevant State
         infrastructure supplier.

15.5.2            Schedules of works
(1)      Details of the existing and future trunk infrastructure networks are identified in
         the electronic Excel schedule of works model which can be viewed here:
         <insert link to the website where the file can be found>.

(2)      The future trunk infrastructure is identified in the following tables in Schedule
         9—Local government infrastructure plan mapping and tables:

         (a)   for the stormwater network, Table 15.15
         (b)   for the transport network, Table 15.16
         (c)   for the parks and land for community facilities network, Table 15.17




 - 13-
  –
Log in to download the original file

2018-05-29 SM - Attachment 4 (Part 1) to Item 2 - LGIP(PDF, 626KB).pdf · 641 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗