Original source · versioned page text
2018-05-29 SM - Attachment 4 (Part 1) to Item 2 - LGIP
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
15.2 Planning assumptions
(1) The planning assumptions state the assumptions about:
(a) population and employment growth
(b) the type, scale, location and timing of development including the demand
for each trunk infrastructure network
(2) The planning assumptions together with the desired standards of service form
a basis for the planning of the trunk infrastructure networks and the
determination of the priority infrastructure area.
(3) The planning assumptions have been prepared for:
(a) the base date (2014) and the following projection years to accord with
future Australian Bureau of Statistics census years:
(i) mid (2016)
(ii) mid (2021)
(iii) mid (2026)
(iv) mid (2031)
(b) the LGIP development types in column 2 that include the uses in column
3 of Table 15.1.
(c) the projection areas identified on Local Government Infrastructure Plan
Map LGIP-PIA (Key Map) in Schedule 9—Local government
infrastructure plan mapping and tables.
Table 15.1—Relationship between LGIP development categories, LGIP development
types and uses
Column 1 Column 2 Column 3
LGIP development LGIP development Uses
category type
Residential Attached dwelling Ancillary dwelling unit
development Multiple housing
• Type 2 Duplex
• Type 3 Retirement and special needs
(retirement village)
• Type 4 Conventional
• Type 5 Relocatable
Visitor accommodation
• Type 1 Home hosted
• Type 2 Caravan park
• Type 3 Rural
• Type 4 Conventional
Open space
• Type 2 Camp ground
Detached dwelling Detached house
Community Residence
- 2-
–
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.