Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-05-29 SM - Attachment 4 (Part 1) to Item 2 - LGIP

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

       Government Infrastructure Plan Map LGIP-PIA in Schedule 9—Local
       government infrastructure plan mapping and tables.
(2)    The planned density for future development is stated in Table 15.8 in Schedule
       9—Local government infrastructure plan mapping and tables.
(3)    A summary of the assumptions about future residential and non-residential
       development for the planning scheme area is stated in Table 15.3—Residential
       dwellings and non-residential floor space assumptions summary.
Table 15.3—Residential dwellings and non-residential floor space assumptions
summary

  Column 1       Column 2
  Description    Assumptions
                  Base
                  date                                                         Ultimate
                  2014     2016            2021        2026         2031     development
  Residential
  dwellings       28,753      29,434      30,833      31,343       32,070        34,330
  (Total)
  Non-
  residential
                 948,028    1,027,894   1,122,702    1,179,373   1,232,488     1,825,601
  floor space
  (m2 GFA)

(4)    Detailed assumptions about future development for each projection area and
       LGIP development type are identified in the following tables in Schedule 9
       Local government infrastructure plan mapping and tables:
       (a)   for residential development , Table 15.10

       (b)   for non-residential development, Table 15.11

15.2.3          Infrastructure demand
(1)    The demand generation rate for a trunk infrastructure network is stated in
       Column 3 of Table 15.9 in Schedule 9 Local government infrastructure plan
       mapping and tables.

(2)    A summary of the projected infrastructure demand for each service catchment
       is stated in:

       (a)   for the stormwater network, Table 15.12

       (b)   for the transport network, Table 15.13

       (c)   for the parks and land for community facilities network, Table 15.14


15.3 Priority infrastructure area
(1)    The priority infrastructure area identifies the area prioritised for the provision of
       trunk infrastructure to service the existing and assumed future urban
       development up to 2031.

(2)    The priority infrastructure area is identified on Local Government Infrastructure
       Plan Map LGIP-PIA.



- 5-
 –
Log in to download the original file

2018-05-29 SM - Attachment 4 (Part 1) to Item 2 - LGIP(PDF, 626KB).pdf · 641 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.