Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2018-05-29 SM - Attachment 4 (Part 1) to Item 2 - LGIP

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SC9.3          Local government infrastructure plan maps
  1. Local Government Infrastructure Plan Map LGIP-PIA—Priority infrastructure
     area and projection areas map:
        i.   Noosa Plan – LGIP-PIA Key Map
      ii.    Boreen Point, Kin Kin & Cootharabah – LGIP-PIA Map 1
     iii.    Cooroibah – LGIP-PIA Map 2
     iv.     Cooroy & Lake Macdonald – LGIP-PIA Map 3
      v.     Eastern Beaches – LGIP-PIA Map 4
     vi.     Mary River Catchment – LGIP-PIA Map 5
     vii.    Noosa Heads – LGIP-PIA Map 6
    viii.    Noosa North Shore – LGIP-PIA Map 7
     ix.     Noosaville – LGIP-PIA Map 8
      x.     Tewantin & Doonan – LGIP-Map 9
    Note:    For the LGIP:
             • The projection areas are the PIA’s and Planning Scheme Localities; and
             • The developable area is land within the PIA represented by the planning
               scheme zones relating to urban uses and shown in PIA Maps 1 to 9.


  2. Local Government Infrastructure Plan Map LGIP-PFTI Stormwater—Plan for
     trunk stormwater infrastructure:
        i.   Noosa Plan – LGIP-PFTI Stormwater Key Map - Service Catchments
      ii.    Boreen Point, Kin Kin & Cootharabah – LGIP-PFTI Stormwater Map 1
     iii.    Cooroibah – LGIP-PFTI Stormwater Map 2
     iv.     Cooroy & Lake Macdonald – LGIP-PFTI Stormwater Map 3
      v.     Eastern Beaches – LGIP-PFTI Stormwater Map 4
     vi.     Mary River Catchment – LGIP-PFTI Stormwater Map 5
     vii.    Noosa Heads – LGIP-PFTI Stormwater Map 6
    viii.    Noosaville – LGIP-PFTI Stormwater Map 8
     ix.     Tewantin & Doonan – LGIP-PFTI Stormwater 9
    Note:    For the LGIP, the Stormwater Service Catchments comprise of the PIA areas
             within the respective Planning Scheme Localities.


  3. Local Government Infrastructure Plan Map LGIP-PFTI Transport—Plan for
     trunk transport infrastructure:
        i.   Noosa Plan – PFTI Transport Key Map - Service Catchments
      ii.    Boreen Point, Kin Kin & Cootharabah – PFTI Transport Map 1
     iii.    Cooroibah – PFTI Transport Map 2
     iv.     Cooroy & Lake Macdonald – PIA Map 3
      v.     Eastern Beaches – PFTI Transport Map 4
     vi.     Mary River Catchment – PFTI Transport Map 5
Log in to download the original file

2018-05-29 SM - Attachment 4 (Part 1) to Item 2 - LGIP(PDF, 626KB).pdf · 641 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.