Minor Change Existing Approval OPW24-0098.01 (As Published) · OPW24/0098.01
Bonds
33. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be calculated using a schedule of works and relevant bond equation.
c. include GST.
d. have approval of the bond calculations and amount from Council prior to lodgement
e. be lodged with Council and accompanied by the Bond Administration Fee/s.
f. be requested for release by writing to Council, when relevant approval requirements
have been met.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
Geotechnical Investigation Report prepared by 28 June 2024
PTG Consulting - reference PTG/00259 – 0001 -
Rev 0
Dewatering Management Plan prepared by ADG July 2024
Consulting - reference ADG1673.24.
Letter prepared by SCG Consulting Engineers – 6 August 2024
reference 0282(L1)
Letter prepared by PTG Consulting – reference 31 July 2024
PTG/00259 – 0002 – Rev 0
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. This development permit does not authorise the carrying out Building Works assessable
against the Planning Scheme should the development not achieve compliance with the
nominated assessment benchmarks of the Noosa Plan 2020.
2. As the works are private structures, the owner bears full responsibly for the standard of their
construction, maintenance and any liabilities associated with their construction. It is
recommended that professional advice be sought for the construction of the works.
3. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
4. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
Page 6 of 9
Document Set ID: 25260882
Version: 3, Version Date: 21/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW24-0098.01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 168 KB (small file)
- File type
No other editions are linked here.