Original source · versioned page text
Landscape plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Lot 4 Taylor Court, Cooroy
Landscape Operational orks
an 2022
| |
|
|
|
|
|
|
| |
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| | | |
|
|
|
|
| |
|
|
| | | | |
|
|
|
|
| | |
|
|
| |
| | ||
|
| | |
|
| | ||
|
|
| |
| | | |
| |
| | | |
| | | | || || | |
| | | | | |
| | | |
|
| | || | | |
|
|| | | | | | | | |
| | | | || || |
|
| | | | | | |
|
| |
|
LP
Lot 1
The following landscape operational works plan package consists of the following schedule of
drawings;
Taylor LD1 eneral Notes Sheet Layout Site Location
Court LD2 ro ect Specifications
LD3 Specification Notes inishes lantin Schedule Maintenance Schedule
LD4 Typical etails
LP1-3 Landscape onstruction Setout
Lot 2
This package has been developed to comply with;
Noosa lan 2020
In asi e lants Listed in the Biosecurity Act 2014
Noosa Biosecurity lan 2020
Bioretention Technical esi n uidelines Version 1 Octo er 2012 ater y esi n
Sources;
LP1 Barlo Shelly onsultin En ineers
Adapt To n lannin
Certifications;
e elopment Mana ement
Lot 3 · urnish LA ith follo in certifications prior to on maintenance inspection;
AS 2303:2015
AS4419 Soil ertification
Mulch eed free est ree
Soil epth certification ith photo raphic e idence
Sample Approvals;
· urnish LA ith follo in samples for LA appro al prior to construction;
omposted orest Litter
Lot 4 Su ar ane Mulch
LP2 LP3
7
SP237587
Lot 4, Taylor Court, Cooroy, QLD
SHEET KEY LAYOUT N.T.S SITE LOCATION N.T.S
Lot 4 SP324340
Client Project NORT TITLE: JOB No.: S22011135
anembo consultants
FILE: 220120
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LD1
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS GENERAL NOTES, SHEET 1 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 20.01.22 COUNCIL SUBMISSION CK TH SHEET LAYOUT & SITE NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LOCATION NTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
t ice eekly durin prolon ed rain
LANDSCAPE SPECIFICATIONS · All stockpiles are to e protected ith suita le erosion control de ices raded DRAINAGE TREE PLANTING
to ensure control of runoff. · The i il desi n and construction has pro ided a specific catchment ased · Refer to Street tree tree plantin details as applica le for information.
The landscape plans must be read in conjunction with the operational works
· oordinate installation of sediment erosion control de ices ith ci il contractor draina e outcome that drains the site. Refer to i il Storm ater esi n dra in s · All trees to e certified that they comply ith this specification ith AS 2303 'Tree
landscaping decision notice once issued. This plan has been developed to
to ensure compati ility consistency in control measures. for detail. Stock for Landscape Use'.
comply with the MBRC Development & Design Manual.
· All exposed surfaces once completed shall e immediately sta ilised. · Landscape orks are to ensure that the ci il draina e intent is realised. · ontractor is to pro ide a suita ly ualified Ar orist ith iploma Ar oriculture to
· here the i il storm ater draina e desi n intent conflicts ith landscape orks inspect each tree upon arri al onsite and certify trees accepta le for use.
SITEWORKS refer to SU ER for direction.
· Landscape contractor to pe roup indi idual street tree positions for appro al
ABBREVIATIONS y LA efore exca ation.
· Remo e all un anted material deleterious operational de ris from site. · Ensure draina e outcomes correlate ith upstream and do nstream catchment
AS Australian Standard ot dipped · Undertake soil orks in accordance ith Topsoil.
· here ad round occurs or le els pro ided are not functional refer to SU ER. inte rity.
E Esta lishment eriod LA Landscape Architect · Street trees to ha e a full e en cro n.
N A Not applica le O On centre · Ensure site draina e can occur to hole of site here paths ed es ardens · Landscape lans sho locations and specifications of field pits conduits and · Existin trees to remain are to e protected in accordance ith AS4970 ' rotection
MRTS Main Roads Technical Standard M Maintenace eriod etc. may impede draina e refer to super efore continuin orks. su surface draina e. here conduits pass under paths in parks install rass on of Trees on e elopment Sites'.
m2 S uare metres m3 u ic Metres · Ensure draina e orks correlate ith ad acent land. path at location. · All prunin to e done in accordance ith AS4373 ' runin of Amenity Trees'.
NATA National Association of Testin Authorities SU ER Superintendent · i il desi n has pro ided a positi ely drained site ho e er here draina e issues · here ne field ully pits are re uired they are to e concrete sump ith · Install trees at locations indicated on the plans per notes details herein.
NS Noosa Shire ouncil B ater y esi n are identified refer SU ER. rate type confirm si e and final location ith SU ER to ensure they meet the · Root prune trees as re uired to meet AS2303:2015.
u V Unplasticised poly inyl hloride T Typical · Refer to Landscape onstruction raina e for more information. catchment needs. · Install street tree draina e per detail if re uired y ci il en ineer or tree pits do not
· onduits are re uired for con eyance of draina e from field ullies to the i il drain after they are tested for draina e y fillin ith ater prior to plantin .
SLEEVING & CONDUITS Storm ater system roof ater from lots to ker adaptors or under structures. · Tree stakin per detail.
· Supply install 100mm diameter solid V pipin at lo points under all onduits are to e 100mm u V pipe centered in a minimum 200mm x 200mm · Ensure trees located in accordance ith En ineerin re uirements for safe ehicle
1. GENERAL NOTES pedestrian si ht lines.
footpaths that; trench ackfilled ith clean fill and minimum 300mm co er compacted to suit
PRELIMINARIES
Bisect landscape areas for landscape draina e purposes. surroundin landform.
· Refer to plans by others for all services locations, footpath works, levels GENERAL PLANTING
Extend ends 300mm eyond paths each side and cap. · Su surface drains are re uired to intercept seepa e ad acent ardens ed es
(other than those indicated on these plans) & boundaries. All services &
Are re uired to con ey roof ater from lots to ker adapters. paths and structures. Su surface drains are to e 100mm 'A line' centered in a · Refer to detail s herein respecti ely.
related infrastructure including street lighting shown on these plans are
· Refer to Landscape onstruction raina e for more information. eofa ric lined 300mm x 300mm trench ackfilled ith 20mm ra el at depths to
· Supply place plants accordin to plantin schedule setout notes details for
indicative only. appro al y LA prior to plantin .
ensure falls to recei in storm ater pits or filed ullies.
· Call dial before you dig 11 00 prior to any excavation. · here discrepancies occur ad ise super prior to plantin .
IMPORTED TOPSOIL · Su surface drains are also re uired under s ales in lar e catchments to · Ensure plants are placed planted at e ual centres sta ered not in ro s unless
· All site excavation works must comply with WHS, Excavation Works Code
· lear remo e all non or anic deleterious and lar e or anic matter such as compliment the ci il draina e and ena le use of the landscapes durin et indicated on plans.
of Practice 2013 and Risk Management Principals.
rocks reater than 40mm diameter tree roots trunks lim s and stumps from all periods. Su surface drains are to e 100mm 'A line' centered in a eofa ric · Mass roup plantin s to e spaced e enly in a trian ular pattern to achie e
· In order to positi ely identify ser ices prior to exca ation scan for ser ice location
areas to e landscaped. lined 300mm x 300mm trench ackfilled ith 20mm draina e ra el at depths to optimum co er related to mature plant si e and form.
erification usin a AT a le A oidance Tool scanner or similar.
· Exca ate and remo e off site any remainin fill to turf and arden areas to ensure ensure falls to recei in storm ater pits or filed ullies. · Shru s spreadin roundco ers to e set ack a minimum 600mm from roads
· or exca ation ithin 2.5m of an identified ser ice the exca ation process must
correct depths for topsoils. · At the completion of all landscape orks test all draina e systems here ker s arden ed es paths to allo for mature plant form. confirm ith LA hich
comply ith the asset o ner's instructions. If instructions are not a aila le the
· ulti ate su rade for all street trees to a depth of 150mm for inspection efore practica le. All dama ed storm ater pipes and infrastructure are to e replaced re uire more distance.
follo in must e adopted:
installation of soil. relocated as necessary. · All plants must e planted usin one A riform 10 fertiliser N. . . 20 4.3 4.1
Manually exca ate or Vacuum exca ate to expose the ser ices
· ulti ate su rade in all turf areas to a depth of 150mm for inspection efore · urther information located in inishes Schedule etails and ra in s. ta let at a rate of 1 140mm 2 200mm 3 300 4 45 litre a o e pot si es 5 ta let
for location erification prior to any mechanical or deep exca ation for tu estock. Use phosphorous free ta lets for Banksias and re illeas.
installation of soil.
plus 500mm. · Soak plants thorou hly efore remo in from container.
· ulti ate su rade in all arden areas to a depth of 300mm for inspection efore EDGING
· If mechanical or deep exca ation is to occur further than 2.5m from an identified · Remo e plants from containers a s tu es carefully inspect root all remo e
installation of soil. · Supply install maintain ed es as specified sho n on the plans details
ser ice an assessment must e made to confirm that no ser ices are located in old matted coiled roots to expose youn roots. All stock to e free of structural
· ontractor to import topsoil certified to AS4419 'Soils for Landscape and arden specifically here ne ardens are located ad acent to ne turf areas. Tie off
the area to e exca ated such as: defects a o e elo soil line i.e. no irdled roots .
Use' standard spread to proposed plan finish le els. ed e ends perpendicularly to paths at ker s at control or expansion oints.
Scan the area to e exca ated ith the AT and record findin s
· To street trees install 700mm topsoil · o not mix soil from hole ith mulch.
Sample potholes manual or acuum exca ate to re uired depth. · Rou hly s uare hole sides.
· To turf areas install 200mm topsoil. MULCHING
Visual inspection of the area · ill hole ith ater allo to drain efore plantin .
· To arden areas install 500mm topsoil enerally ith a taperin to turf and · Or anic and inor anic mulches are re uired to e installed o er all arden areas
Utilise a spotter · Install fertiliser ta let s install plant ackfill plant ith AS.
structures as re uired. ro n eds 100mm hi h at their centre point. here sho n on the dra in s. · ater plant in ell maintain soil moisture le els throu h E
· Before ork commences the su contractor is to or anise a pre start meetin ith
· Ensure smooth flo in e en rades and positi e draina e ith no pondin . all · All mulches supplied must e clean free from li e eeds eed seeds · o not compact plant pit.
the LA to esta lish scope of orks mana ement procedures clarify any issues.
percenta es 3 minimum 2 specifically nutsed e pests soil orne iruses and diseases. urther SU ER
· Install tree protection measures as per plans & detail.
· · inished rades shall lend into existin rades pro idin a natural ith certifications respecti ely for appro al prior to installations. NEW TURFED AREAS
· rior to commencin construction orks erify dimensions le els location of
appearance ith no a rupt ed es. · State o ernment ire Ants re ulations must e strictly adhered to refer to · Undertake soil orks in accordance ith Topsoil
site ser ices refer en ineer's dra in s enerally.
Biosecurity L on 132 523 for landscape suppliers and landscape contractor's · Trim ameliorated topsoil fill depressions pro ide e en falls per plans.
· or construction orks impactin on pu lic roads traffic control procedures must
2. LANDSCAPE CONSTRUCTION re uirements. · inished turf rades contours shall e smooth undulatin free from deleterious
e adopted complyin ith S State re uirements and Risk Mana ement
DOCUMENTATION INFORMATION SEQUENCE Mulch types include: materials de ris lar e clods of soil stones free from pest diseases eeds
rinciples. Refer to the rincipal ontractor for coordination or contact an
· or each ' onstruction item' in this landscape specification the information Su ar ane Mulch 100mm depth to io asins or anic matter positi e flo in min. 2 slopes no pondin areas. o ordinate
authori ed Traffic ontrol onsultant for implementation. on site ith SU ER ensure le els are appro ed prior to layin turf. here turf
needed to understand the full scope of construction re uirements occurs in a omposted orest Litter 100mm depth to all street
· Dimensions take precedence over scale. meets hard ed es ad ust finish topsoil le els to allo storm ater to flo
num er of places in the documents includin : trees feature ardens.
· ontractor to re ie all schedules herein to confirm their correlation to these unimpeded o er laid turf to lo area respecti ely.
Le end inishes Schedule for type finish and any further ra el Mulch 150mm depth o er pinned eo fa ric to areas nominated.
plans. here discrepancies occur ithin landscape documentation refer to LA · Supply lay 'A' rade turf per plans schedule.
prior to pro ision of tender pricin or construction. construction information · here turf is installed on slopes 20 1:5 pin turf to industry standards.
etails for installation specification · urther information located in inishes Schedule and dra in s.
· Remo e pins once turf is ell esta lished.
SEDIMENT & EROSION CONTROL Sections for installation uidance and specification · ater turf in ell apply ater to maintain soil moisture until esta lished as
· The landscape contractor to implement & maintain for the contract · ra in s for locations dimensions and uantities FENCING re uired durin the maintenance period to maintain health i our.
· Each ' onstruction item' ill reference here to look Schedule etail dra in to · encin ali nment set out to e sur eyed pe ed y licensed pro ect
duration, best practice erosion & sediment control measures in
find rele ant information from the documentation packa e. sur eyor. PLANTING TO BIO-RETENTION BASIN MEDIA
accordance with the manual for erosion & sediment control (maroon
manual), good environmental practice & the consulting civil engineers · here conflicts occur or further information is re uired refer to LA or SU ER. · lant as specified in the field y LA accordin to nominated plantin schedules.
specification for erosion & sediment control. Penalties & fines for 3. PLANTING & GROUNDWORKS · ertili er ta let and moisture retenti e el to manufacturers specifications to e
non-compliance will apply. LEVELS NEW GARDENS incorporated at time of plantin .
· Install silt control fencin in accordance ith site en ironmental mana ement plan · or all road draina e and lot le els refer to i il dra in s. Ensure ci il rades · Exca ate ci il finish le els 300mm for arden areas unless completed y ci il · Ensure that root all is placed firmly in su strate such that the plant can properly
and le els are maintained any chan es to e confirmed y SU ER. contractor . esta lish.
local authority re ulations.
· Verify ith SU ER all rele ant construction le els and ser ice locations. SU ER is · ulti ate su rade soil to a depth of 150mm. · ater in ell.
· e ices to e installed here necessary as directed on site y super.
to ad ise on re uired outcomes here discrepancies occur · Spread ameliorated site topsoil or imported or anic topsoil to a depth of 300mm · here sho n install 50mm su ar cane mulch to asin floor and sta ili e ith oir
· All sediment erosion control de ices are to e installed in accordance ith Mesh.
· here critical le els need erification such as lot oundaries ser ices and asins o er prepared arden areas trim.
manufacturer's specifications. · oir mesh to e used to sta ili e steep atters and hi h flo areas. Mesh to e
confirmation y a licensed sur eyor is re uired. · ro n arden eds at centre 100mm to drain positi ely.
· The contractor is responsi le for ensurin sediment erosion control de ices are
· rade e enly et een prescri ed le els finished surface le els ensurin · Mulch ardens ith la appro ed AS. 4454 imported 25mm mulch 100mm deep pinned to manufacturers specifications.
inspected maintained as follo s; settled. Lea e 25mm et een top of mo in ed e plantin area mulchin .
a. urin construction: daily durin dry eather positi e draina e no pondin areas.
· All supplied topsoil mulch to comply ith current AS free of eeds seeds A o e le el of inundation install arden mulch as specified in eneral plantin .
prior to predicted storm e ents · The follo in rades are to e follo ed here practica le:
specifically nutsed e pests includin fire ants soil orne iruses diseases.
t ice daily durin prolon ed rain Turf 1:4 25 max.
furnish LA ith certifications respecti ely for appro al prior to installations.
. urin esta lishment period: eekly durin dry eather Road reser e slope up to ack of path 1:33 3 max.
prior to predicted storm e ents ardens 1:3 33 max.
t ice eekly durin prolon ed rain Structural ardens 1:2 50 max.
· All stockpiles are to e protected ith suita le erosion control de ices raded Slopes in erts a ay from structures 1:50 2 max.
to ensure control of runoff.
· oordinate installation of sediment erosion control de ices ith ci il contractor DRAINAGE
Client Project NORT TITLE: JOB No.: S22011135
anembo consultants
FILE: 220120
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LD2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS SHEET 2 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 20.01.22 COUNCIL SUBMISSION CK TH PROJECT NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 SPECIFICATIONS NTS
Page 3
PLANT SCHEDULE 1 - Street Trees Min. idth
O E ENUS species ommon Name ty x ei ht Si e Staked
STREET TREES
TRI lau TRISTANIO SIS laurina ater um 1 7x9 45 L
4. MAINTENANCE MANAGEMENT ANNUAL MAINTENANCE REGIME - SCHEDULE
TOTAL 1
PRACTICAL COMPLETION TAS RE UEN ER ORMAN E IN I ATOR
· The landscape contractor shall consolidate the landscape orks and make ood eekly: No em er e ruary Maintain turf to present consistent
all defects for practical completion. ortni htly: March April i orous appearance mo to
PLANT SCHEDULE 2 - General Min. idth
· At practical completion the landscape contractor shall ad ise SU ER for an 'on' Mo in Monthly: May Au ust 30mm hi h
x ei ht
O E ENUS species ommon Name ty Si e Staked
maintenance inspection ith LA. Maintain turf neatly a ainst any
eekly: No em er e ruary
· The annual maintenance re ime schedule descri es the maintenance tasks ortni htly: March April ed e around any ser ice or TREES
fre uencies and key performance indicators that the maintenance contractor is to Trimmin Monthly: May Au ust respecti e co er A M hem A MENA hemilampra 4 7x9 45 L
follo . TIB als TIBOU INA Alston ille 1 7x9 45 L
Sprayin ick E ery 2 eeks Octo er March No eeds or rass taller than plant
· Maintenance period of t el e 12 months from the date of practical completion O if O ETIA ifurcata oxtail alm 5 3 x 10 45 L
ipin E ery 4 eeks April Septem er ithin 500mm of plants
on maintenance of landscape orks to streetscape and parks. TOTAL 10
100mm minimum re uired depth or
MONITORING mulch ade uate to suppress eed SHRUBS
Re mulchin Once durin M once per year ro th maintain soil moisture.
· Re ularly inspect all landscape orks to monitor durin construction MET lit METROSI EROUS collina Little u ald 23 1.2 x 1.5 300mm
esta lishment and maintenance. Inspect plantin at the start of S pin S IUM australe innacle 46 1.5 x 6 300mm
· Re ie periodically to ad ust in consultation ith SU ER to suit chan in Sprin assess dama ed dead To achie e minimum desi n TOTAL 69
or unhealthy plants. Replant as plantin densities and arden
conditions. co er GROUNDCOVERS
Re plantin re uired.
· Any trees ith irdled or poor root ro th identified durin the maintenance period A A pra A A ANT US praecox Blue Lilly 29 1x1 140mm
ill e replaced at the contractors expense. E ery 2 or 3 days durin E
lants exhi it healthy ro th LIR us LIRIO E muscari ust Ri ht 18 0.3 x 0.3 140mm
· Report immediately any stolen or dead or dyin plants to SU ER and al ays eekly durin M or as re uired
TRA as TRA ELOS ERMUM tricolour arie ated 26 2 x 0.3 140mm
aterin to maintain ade uate soil moisture. no si ns of drou ht stress
confirm direction on su stitution or replacement ith a similar si e and identical TUL io TULBA IA iolacea Sil er Lace 33 0.5 x 0.5 140mm
species or ariety of the plant s ertilisin re uired TOTAL 106
· Maintenace period of t el e 12 months from date of practical completion om here hen plants
are not respondin to Once durin M or as re uired lants appear healthy exhi it
maintenance of landscape orks to streetscape. ood rate of ro th.
slo release fertiliser PLANT SCHEDULE 4
applied at plantin
PLANT SCHEDULE 3
OFF MAINTENANCE Bio Retention Media Planting Bio Retention Batter Planting
· At the end of the maintenance period the landscape contractor shall arran e for an As re uired here plants re uire
support. Allo to stake 20 of BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN
'off maintenance' inspection ith Superintendent. Only compliance of site lants ro in in an upri ht manner
trees durin E . Allo to stake SPACING Media 500mm SPACING Batter Planting
inspections and instructions y Superintendent achie es 'Off maintenance' further 20 of trees durin M (66m²) (107m²)
Stakin
BIO-RETENTION BASINS - MAINTENANCE & HANDOVER Inspection for storm ollo in storm e ent hea y
Any dama e noted and recitifed
dama e rainfall or hi h inds SHRUBS HIGH SHRUBS @ 30% OF AREA
· here temporary turf is installed remo e turf soil eofa ric. Turf o er media
BANKSIA robur 140mm 1/5m 2 4 ACMENA smithii 200mm 1/5m 2 6
surface ith 20mm soil on turf sla s rolls lants ha e desired natural form
runin to promote Monthly durin E e ery 3 CALLISTEMON sieberi 140mm 1/5m 2 4 CALLISTEMON captain cook 200mm 1/5m 2 6
· here plants ha e een installed re ularly remo e silt uildup y hand and healthy plant ro th months M eyond display healthy ro th
LEPTOSPERMUM petersonii 140mm 1/5m 2 4 LEPTOSPERMUM petersonii 200mm 1/5m 2 6
maintain mulch.
· At 24 months 80 uild out de silt any planted areas replace any plants and MELALEUCA claret Tops 140mm 1/5m 2 4 SYZYGIUM aussie southern 200mm 1/5m 2 6
remulch. E ro ide a report to SU ER Scheduled acti ities carried out. TOTAL 16 TOTAL 24
· Maintain Bio Retention asins until it reaches B 4.4.7 'Measures of successfully on esta lishment pro ress at Successful esta lishment.
Monitorin each pro ress payment claim. Scheduled maintenance acti ities MACROPHYTES & GROUNDCOVERS
esta lished plants'. Ve etation co er 90 surface 10 soil isi ility from a o e FICINIA nodosa Tubestock 8/m
2
132
M ro ide completed acti ities carried out. Successful LOW SHRUBS @ 60% OF AREA
any areas ithout co er are mulched minimum e etation hei ht of 500mm and list to SU ER after 3 months maintenance IMPERATA cylindrica Tubestock 4/m
2
66
e etation healthy and free from disease. 2
MELALEUCA thymifolia 140mm 1m 2 16
JUNCUS usitatus Tubestock 8/m 132 1m 2 16
2
HOVEA linearis 140mm
LOMANDRA hystrix Tubestock 1/m 16 1m 2 16
HARDENBERGIA violacea 140mm
TOTAL 346 LOMANDRA longifolia 140mm 1m 2 16
FINISHES SCHEDULE 64
Sacrificial CYNODON dactylon Turf to Media Areas. To be Planted Out at 80% Build Out TOTAL
CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR or After 2 Years.
Top Soil Soil preparation As Smooth uniform eed free GRASSES @ 10% OF AREA
Imported site topsoil: Refer to 2
Top soil per Specification per plan topsoil mulch surfaces ith no As supplied NOTES: All plant quantities are shown for reference only, contractor to verify all quantities IMPERATA cylindrica Tubestock 4/m 13
specifications
nominated areas. deleterious materials. if a discrepancy exists between plans and schedules, plans to take presedence. JUNCUS usitatus Tubestock 4/m
2
13
Plant shrubs from 140mm pots and Macrophytes & Groundcovers from Tubestock in drifts Tubestock 2
13
Uniform finish 100mm deep free of deleterious THEMEDA triandra 4/m
of 7-13.
B Or anic Mulch Street Tree arden pt and ardens 25mm composted materials. Install pinned coir mesh o er io retention As supplied TOTAL 39
omposted orest Litter asic mulch areas pro ect entry atter and
storm ater o erland flo path lo flo s ales.
PLANT SCHEDULE 5
Uniform finish free of deleterious materials eed
S Or anic Mulch Bio Retention Basin Media Area's As supplied seed i.e Nut sed e 100mm deep. Install pinned coir As supplied Drainage Easement Buffer
Su ar ane Mulch
mesh o er mulch.
BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN
ynodon dactylon Top Soil as per eneral notes SPACING Batter Planting
Smooth flo in e en positi ely Bri ht reen
Turf ouch Bermuda rass 150mm deep (880m²)
A rade free of pests and eeds drainin rades
Turf Rolls Sod
oir MES pinned do n o er Mulch as HIGH SHRUBS @ 30% OF AREA
oir MES oir Mesh oir Net 400 sm As supplied
per manufactures specification ACMENA smithii 200mm 1/5m 2 44
CALLISTEMON captain cook 200mm 1/5m 2 44
GREVILLEA honey gem 200mm 1/5m 2 44
ra el Mulch Ri er ra el Mulch 100 50mm Smooth Natural
LEPTOSPERMUM petersonii 200mm 1/5m 2 44
MELALEUCA linariifolia 200mm 1/5m 2 44
hite decorati e ra el o er pinned SYZYGIUM aussie southern 200mm 1/5m 2 44
ecorati e ra el Mulch eofa ric 50mm Smooth hite
TOTAL 264
Spade Ed in er detail er etail er etail er etail LOW SHRUBS @ 60% OF AREA
MELALEUCA thymifolia 140mm 1m 2 132
HOVEA linearis 140mm 1m 2 132
Tim er Ed e er detail er etail er etail er etail HARDENBERGIA violacea 140mm 1m 2 132
LOMANDRA longifolia 140mm 1m 2 132
TOTAL 528
GRASSES @ 10% OF AREA
2
IMPERATA cylindrica Tubestock 4/m 117
2
JUNCUS usitatus Tubestock 4/m 117
2
THEMEDA triandra Tubestock 4/m 117
TOTAL 351
Client Project NORT TITLE: JOB No.: S22011135
anembo consultants
FILE: 220120
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS PROJECT SPECS, SHEET 3 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 20.01.22 COUNCIL SUBMISSION CK TH PLANT SCHEDULE & NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 FINISHES SCHEDULE NTS
Page 4
3x Tube dia.
SPADE CUT EDGE TO TURF & GARDEN TOP SOIL PER
INTERFACES WHERE NO HARD EDGE IS SPECIFICATIONS
SPECIFIED, 150mm DEEP.
TURF AS SPECIFIED.
100mm THICK ORGANIC MULCH
AS SPECIFIED. TUBESTOCK PLANT, REFER TO PLANT
150mm SCHEDULE FOR SPECIES
SUBGRADE, FORM TO SUIT FORM SHALLOW SAUCER SHAPED
FINISH LEVEL & CONTOURS. DEPRESSION AROUND PLANT BASE
100mm DEEP ORGANIC MULCH PER AS
SPECIFIED. KEEP MINIMUM 50mm
1 SPADE CUT EDGE AT TURF / TREE GARDEN INTERFACES CLEAR OF PLANT STEM. DO NOT
Typical Section NTS MULCH BIO-AREA MEDIA SAND.
LP4
CULTIVATED SUBGRADE TO 150mm
STREET TREE PLANTING DETAIL PLAN
TOPSOIL AS SPECIFIED CONCRETE GARDEN EDGE, WASHED GRAVEL
NOTES: REFER TO DETAIL AS SPECIFIED
EXTENT OF PIT EXCAVATION TO BE 1800mm x 1800mm IN AREA, MINIMUM
(SUBJECT TO FOOTPATH LOCATION). REMOVE ALL EXCAVATED FILL OFF-SITE. 5 gram 'AGRIFORM' TABLET - USE TURF AS SPECIFIED
PHOSPHORUS FREE TABLETS FOR
150
CALLISTEMONS & GREVILLEAS TOPSOIL AS
HARDWOOD SPECIFIED, FINISH 25mm
SUBGRADE
STAKES (2), BELOW TOP OF EDGE TO
SEE SECTION ALLOW FOR TURF
STREET TREE, SUBGRADE
REFER DETAIL
BELOW.
ROOTBALL SPADE CUT EDGE
3 TUBESTOCK PLANTING 5 GRAVEL PLACEMENT N.T.S.
KERB INVERT
LP4 Typical Section N.T.S. LD4 Typical Section
1800mm
ROAD
TOPSOIL WITH
MULCH ABOVE
100 x 50 mm TIMBER EDGING 50 x 25 x 450mm HARDWOOD PEG
@1200mm CENTRES
20mm
TURF AS SPECIFIED
MULCH AS SPECIFIED
2x HOT DIPPED
'FIGURE 8' HESSIAN TREE TIE, TYPICAL. GALVANISED TRIPLE GRIP
1000mm 1000mm SCREW TO FIX MITRED
TIMBER EDGING
CENTRE TREE, 900mm FROM BACK OF KERB, OR TOGETHER, TYPICAL. SECTION
BETWEEN KERB & FOOTPATH AS APPLICABLE
6 HARDWOOD TREATED GARDEN EDGE N.T.S.
LD4 Typical Detail
NOTES:
ENSURE CROWN OF ROOTBALL LEVEL IS
SET HIGHER THAN ADJACENT FINISHED
GROUND LEVELS TO PREVENT EXCESSIVE
PONDING AROUND ROOTBALL.
FULL & EVEN CROWN, TYP.
FULL & EVEN CROWN, TYP.
50mm WIDE HESSIAN TREE TIES WRAPPED
LOOSELY AROUND TRUNK, THEN A FIGURE 8 &
50mm WIDE HESSIAN TREE TIES WRAPPED
SECURED TO STAKE.
LOOSELY AROUND TRUNK, THEN A FIGURE 8 &
SECURED TO STAKE WITH GALVANISED NAILS
OR STAPLES. POSITION TREE TIE BETWEEN
1/3 TO 1/2 OVERALL HEIGHT OF TREE.
2 - 50mm x 50mm x 2400mm F14 HARDWOOD
CENTRALLY POINTED NON-TREATED STAKES
2 - 50 x 50 x 2400mm F14 HARDWOOD
(SHOWN PERPENDICULAR TO KERB FOR
CENTRALLY POINTED NON-TREATED STAKES.
GRAPHIC CLARITY ONLY). STAKES TO BE
STAKES TO BE DRIVEN VERTICALLY INTO
DRIVEN VERTICALLY INTO GROUND OUTSIDE
GROUND OUTSIDE OF THE ROOTBALL &
OF THE ROOTBALL.
SHALL HAVE A FINISHED HEIGHT LOWER
THAN THE TREES LOWER LATERAL LIMBS.
FORM SHALLOW SAUCER SHAPED FORM SHALLOW SAUCER SHAPED
1000mm DEPRESSION AROUND BASE OF PLANT.
DEPRESSION AROUND BASE OF PLANT. KEEP
min. 1000mm KEEP MULCH NOM. 50mm FROM TRUNK
MULCH NOM. 50mm FROM TRUNK BASE.
CROWN OF TREE 50mm ABOVE KERB HEIGHT 900mm 900mm BASE.
100mm DEEP ORGANIC MULCH AS 100mm DEEP ORGANIC MULCH AS
NOMINATED. NOMINATED. MOUND MULCH AT EDGE OF
2 x POT Ø PLANT PIT TO COLLECT WATER TO FALL
TURF AS SPECIFIED. DOWN EDGES OF PLANT PIT. DO NOT MULCH
POT Ø WITHIN 50mm OF PLANT STEM.
TURF OR GARDEN, REFER TO PLAN.
SPADE EDGE
COMPACTED SOIL UNDER TREE SPADE EDGE, REFER TO DETAIL.
600mm
TOPSOIL PROFILE AS PER GENERAL NOTES
PROJECT SPECIFICATIONS.
TREE PIT TO BE EXCAVATED TO NOMINAL
DEPTH VARIES
DEPTH OF 600mm. BACKFILL HOLE WITH TREE PIT TO BE EXCAVATED TO NOMINAL
200mm 150mm 300mm
TOPSOIL PER SPECIFICATIONS FIRMING DEPTH OF 600mm. BACKFILL HOLE WITH
PROGRESSIVELY. EXCESS EXCAVATED SOIL 100% TOPSOIL PER SPECIFICATIONS FIRMING
TO BE REMOVED OFF SITE. PROGRESSIVELY. EXCESS EXCAVATED SOIL
TO BE REMOVED OFF SITE.
SCARIFY PIT WALLS & CULTIVATE PIT
BOTTOM 150mm, TYP.
150mm CULTIVATED SUBGRADE & PIT WALLS. SLOW RELEASE FERTILIZER AS PER
MANUFACTURER & SPECIFICATIONS.
SLOW RELEASE FERTILIZER AS PER
MANUFACTURER & SPECIFICATIONS.
STREET TREE PLANTING - SPADE EDGES N.T.S.
4 TREE PLANTING - in GARDEN or TURF N.T.S.
2
LD2 Typical Section
LP4 Typical Section Detail
Client Project NORT TITLE: JOB No.: S22011135
anembo consultants
FILE: 220120
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LD4
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS SHEET 4 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 20.01.22 COUNCIL SUBMISSION CK TH NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 TYPICAL DETAILS NTS
Page 5
1 A M hem
WARNING LEGEND
T
Turf To istur ed Areas 6S pin
THE LOCATION OF EXISTING & PROPOSED
1 O if TELSTRA, ELECTRICITY, SEWERAGE, STORMWATER
& WATER ARE SHOWN SCHEMATICALLY ON THE TURF
T
8 A A pra DRAWINGS. PRIOR TO & DURING CONSTRUCTION Refer to Plans, Notes & Planting Schedule
1 TRI lau
SE
OBTAIN THE LOCATION OF ALL SERVICES
TE TE 9 A A pra LOT 1
(UNDERGROUND & OVERHEAD) FROM THE
RESPONSIBLE AUTHORITY & DESIGNER
3054m2
T
RESPONSIBLE FOR THE SERVICE SHOWN. ARTIFICIAL TURF
Staff Refer to Plans, General Notes & Finishes Schedule
Recreation
Area
T
TAYLOR COURT 1 O if Tim er Ed e DECORATIVE GRAVEL 50mm
Refer to Plans, General Notes, Finishes Schedule &
6S pin
Detail
T
Artificial Turf
TIMBER EDGE
TE Refer to Plans, General Notes, Finishes Schedule &
Detail
T
PR
U 01 O
PE
TREES
Refer to Plan, Detail, Notes, Plant Schedule 1 & 2
2&4
T
DP
RT & Finishes Schedule
LD4
Entry ate y Others Y
BO
UN BIO BASIN MEDIA PLANTING
LOT 2
T
3
DA Refer to Plan, Detail, Notes, Plant Schedule 3
LD4
RY & Finishes Schedule 3136m2
T
BIO BASIN BATTER PLANTING
Refer to Plan, Detail, Notes, Plant Schedule 4 3
LD4
& Finishes Schedule
T Si na e ence By Architect
T
8 LIR us DRAINAGE EASEMENT BUFFER 3
T Refer to Plan, Detail & Plant Schedule 5 LD4
//
T
Existin oncrete 9 MET lit
T
U 01 U 02 EXTENT OF WORKS
T
T Refer to Plans & General Notes
T
1 TIB als
22 S pin 13 TRA as
//
12 A A pra
Existin Utilities Infrastructure
1 O if
// //
Bin Stora e
//
33 TUL io
//
1 A M hem
1 A M hem
//
EMENT
14 MET lit //
//
1 O if 1 O if
// oncrete ri e ay U 02
GE EAS
Bin Stora e
//
5 TRA as
DRAINA
8 TRA as
1 A M hem
PWD
Bin Stora e
NDARY
10 LIR us U 11
DP U 03
U
5S pin
RTY BO
1S pin
50mm ecorati e
hite ra el
PROPE
U 10
U 11
U 03
U 12
Refer To Architects
ra in s
U 12 DP U 04
1S pin
1S pin 50mm ecorati e
U 12 hite ra el
50mm ecorati e
ITE ra el
Client Project NORTH TITLE: JOB No.: S22011135
anembo consultants
FILE: 220120
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LP1
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS 0 1 2 3 4 5
LANDSCAPE SHEET 5 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used SCALE 1:200 @ A3
A 20.01.22 COUNCIL SUBMISSION CK TH CONSTRUCTION & S ALE 1:100 A1 Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 SETOUT PLAN S ALE 1:200 A3
Page 6
U 10 U 11
U 12
U 12
1S pin
50mm ecorati e
U 12
hite ra el
Y
UNDAR
RTY BO
U 09 oncrete ri e ay
1S pin
PROPE
1S pin
50mm ecorati e
1S pin 50mm ecorati e hite ra el
hite ra el
50mm ecorati e
DPDP
hite ra el
DP
BIO BASIN Batter lantin .
TE
Refer To lant Schedule 3
U 06
BIO BASIN Media lantin .
U 07
TE
Refer To lant Schedule 4
WARNING U 08
THE LOCATION OF EXISTING & PROPOSED
TE
TELSTRA, ELECTRICITY, SEWERAGE, STORMWATER ra el Maintenance Access
& WATER ARE SHOWN SCHEMATICALLY ON THE
DRAWINGS. PRIOR TO & DURING CONSTRUCTION
OBTAIN THE LOCATION OF ALL SERVICES Tim er Ed e
(UNDERGROUND & OVERHEAD) FROM THE
TE
RESPONSIBLE AUTHORITY & DESIGNER
RESPONSIBLE FOR THE SERVICE SHOWN.
Access
2m Mulched Maintenance
LEGEND
TURF
Refer to Plans, Notes & Planting Schedule Retainin all By i il
ARTIFICIAL TURF Tim er Ed e
Refer to Plans, General Notes & Finishes Schedule
100 50mm
DECORATIVE GRAVEL 50mm Rock Mulch
Refer to Plans, General Notes, Finishes Schedule &
Detail
TIMBER EDGE
TE Refer to Plans, General Notes, Finishes Schedule &
Detail
UNDARY
TREES PROPERTY BO
SW
2&4
SW
Refer to Plan, Detail, Notes, Plant Schedule 1 & 2
SW
SW
LD4
SW
SW
& Finishes Schedule
BIO BASIN MEDIA PLANTING
Refer to Plan, Detail, Notes, Plant Schedule 3 3
LD4
& Finishes Schedule
Drainage Easement Buffer.
BIO BASIN BATTER PLANTING Rerfer To Plant Schedule 5
Refer to Plan, Detail, Notes, Plant Schedule 4 3
& Finishes Schedule LD4 Reinstate any Levels & Surface
Treatment Where Construction
DRAINAGE EASEMENT BUFFER 3 Damage Occurs
Refer to Plan, Detail & Plant Schedule 5 LD4
EXTENT OF WORKS
Refer to Plans & General Notes
Client Project NORTH TITLE: JOB No.: S22011135
anembo consultants
FILE: 220120
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LP2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS 0 1 2 3 4 5
LANDSCAPE SHEET 6 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used SCALE 1:200 @ A3
A 20.01.22 COUNCIL SUBMISSION CK TH CONSTRUCTION & S ALE 1:100 A1 Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 SETOUT PLAN S ALE 1:200 A3
Page 7
WARNING LEGEND
U 03 THE LOCATION OF EXISTING & PROPOSED
TELSTRA, ELECTRICITY, SEWERAGE, STORMWATER
& WATER ARE SHOWN SCHEMATICALLY ON THE TURF
DRAWINGS. PRIOR TO & DURING CONSTRUCTION Refer to Plans, Notes & Planting Schedule
OBTAIN THE LOCATION OF ALL SERVICES
(UNDERGROUND & OVERHEAD) FROM THE
RESPONSIBLE AUTHORITY & DESIGNER
RESPONSIBLE FOR THE SERVICE SHOWN. ARTIFICIAL TURF
Refer to Plans, General Notes & Finishes Schedule
DP U 04 DECORATIVE GRAVEL 50mm
1S pin
Refer to Plans, General Notes, Finishes Schedule &
Detail
50mm ecorati e
hite ra el TIMBER EDGE
TE Refer to Plans, General Notes, Finishes Schedule &
Detail
TREES
oncrete ri e ay Refer to Plan, Detail, Notes, Plant Schedule 1 & 2
2&4
LD4
& Finishes Schedule
BIO BASIN MEDIA PLANTING
Refer to Plan, Detail, Notes, Plant Schedule 3 3
LD4
& Finishes Schedule
1S pin U 04 BIO BASIN BATTER PLANTING
3
Refer to Plan, Detail, Notes, Plant Schedule 4
LD4
50mm ecorati e LOT 3 & Finishes Schedule
hite ra el 3234m2 DRAINAGE EASEMENT BUFFER 3
Refer to Plan, Detail & Plant Schedule 5 LD4
EXTENT OF WORKS
Refer to Plans & General Notes
U 05
U 05
Access
Mulched Maintenance
2m
3m
UNDARY
PROPERTY BO
Existing Grass Turf Swale To Be Returfed
Reinstate any Levels & Surface
Treatment Where Construction
Drainage Easement Buffer. Damage Occurs
Rerfer To Plant Schedule 5
Client Project NORTH TITLE: JOB No.: S22011135
anembo consultants
FILE: 220120
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LP3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS 0 1 2 3 4 5
LANDSCAPE SHEET 7 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used SCALE 1:200 @ A3
A 20.01.22 COUNCIL SUBMISSION CK TH CONSTRUCTION & S ALE 1:100 A1 Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 SETOUT PLAN S ALE 1:200 A3