Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Landscape plan

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                      1 A M hem
                                                                                                                                                                                                                                                                                                                                                                                          WARNING                               LEGEND




                                                                                                                                                                             T
                                                                                               Turf To istur ed Areas                                                                                                                                 6S    pin
                                                                                                                                                                                                                                                                                                                                                                              THE LOCATION OF EXISTING & PROPOSED
                                                                                                                                                                    1        O       if                                                                                                                                                                                   TELSTRA, ELECTRICITY, SEWERAGE, STORMWATER
                                                                                                                                                                                                                                                                                                                                                                            & WATER ARE SHOWN SCHEMATICALLY ON THE                       TURF




                                                                                                                                                                    T
                                                                                                                                                           8 A A pra                                                                                                                                                                                                       DRAWINGS. PRIOR TO & DURING CONSTRUCTION                      Refer to Plans, Notes & Planting Schedule
                                                                                                                     1 TRI lau




                                                                                                                                                      SE
                                                                                                                                                                                                                                                                                                                                                                               OBTAIN THE LOCATION OF ALL SERVICES
                                                                                                                                                                                                                 TE            TE                                  9 A A pra                                                                                                                 LOT 1
                                                                                                                                                                                                                                                                                                                                                                              (UNDERGROUND & OVERHEAD) FROM THE
                                                                                                                                                                                                                                                                                                                                                                                RESPONSIBLE AUTHORITY & DESIGNER
                                                                                                                                                                                                                                                                                                                                                                                            3054m2




                                                                                                                                                           T
                                                                                                                                                                                                                                                                                                                                                                               RESPONSIBLE FOR THE SERVICE SHOWN.                        ARTIFICIAL TURF
                                                                                                                                                                                                                 Staff                                                                                                                                                                                                                   Refer to Plans, General Notes & Finishes Schedule
                                                                                                                                                                                                               Recreation
                                                                                                                                                                                                                 Area




                                                                                                                                                  T
                                                  TAYLOR COURT                                                                               1    O        if                                                                                Tim er Ed e                                                                                                                                                                                 DECORATIVE GRAVEL 50mm
                                                                                                                                                                                                                                                                                                                                                                                                                                         Refer to Plans, General Notes, Finishes Schedule &
                                                                                                                                             6S       pin
                                                                                                                                                                                                                                                                                                                                                                                                                                         Detail




                                                                                                                                           T
                                                                                                                                                                                                                                    Artificial Turf
                                                                                                                                                                                                                                                                                                                                                                                                                                         TIMBER EDGE
                                                                                                                                                                                                                                                                                                                                                                                                                                    TE   Refer to Plans, General Notes, Finishes Schedule &
                                                                                                                                                                                                                                                                                                                                                                                                                                         Detail




                                                                                                                                       T
                                                                                                                                                                                                                                                                                                        PR
                                                                                                                                                                                                                                              U 01                                                           O
                                                                                                                                                                                                                                                                                                              PE
                                                                                                                                                                                                                                                                                                                                                                                                                                         TREES
                                                                                                                                                                                                                                                                                                                                                                                                                                         Refer to Plan, Detail, Notes, Plant Schedule 1 & 2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   2&4




                                                                                                                                 T
                                                                                                                                                                                                       DP
                                                                                                                                                                                                                                                                                                                   RT                                                                                                                    & Finishes Schedule
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   LD4
                                                                                                     Entry     ate y Others                                                                                                                                                                                          Y
                                                                                                                                                                                                                                                                                                                         BO
                                                                                                                                                                                                                                                                                                                               UN                                                                                                        BIO BASIN MEDIA PLANTING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 LOT 2




                                                                                                                            T
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     3
                                                                                                                                                                                                                                                                                                                                 DA                                                                                                      Refer to Plan, Detail, Notes, Plant Schedule 3
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    LD4
                                                                                                                                                                                                                                                                                                                                         RY                                                                                              & Finishes Schedule    3136m2




                                                                                                                 T
                                                                                                                                                                                                                                                                                                                                                                                                                                         BIO BASIN BATTER PLANTING
                                                                                                                                                                                                                                                                                                                                                                                                                                         Refer to Plan, Detail, Notes, Plant Schedule 4              3
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    LD4
                                                                                                                                                                                                                                                                                                                                                                                                                                         & Finishes Schedule
                                                                                                 T        Si na e                                                            ence By Architect
                                                                                         T
                                                                                                          8 LIR us                                                                                                                                                                                                                                                                                                                       DRAINAGE EASEMENT BUFFER                                    3
                                                                                 T                                                                                                                                                                                                                                                                                                                                                       Refer to Plan, Detail & Plant Schedule 5                   LD4




                                                                                                                            //
                                                                    T
                                                                        Existin      oncrete                                                                                                9 MET lit
                                                        T
                                                                                                                                                                                                                                                                         U 01                                             U 02                                                                                                           EXTENT OF WORKS
T
                                    T                                                                                                                                                                                                                                                                                                                                                                                                    Refer to Plans & General Notes
                    T
                                                                                                                                                                                          1 TIB als
                                                                                                     22 S      pin                                                                        13 TRA as
                                                                                                                                 //




                                                                                                  12 A A pra
                                 Existin Utilities Infrastructure
                                                                                                                                                                                 1        O     if
              //                         //
                                                                                                                                                                                              Bin Stora e
                                                                                                                                      //




                                                                                                     33 TUL io
                                                   //




                                                                                     1 A M hem
                                                                                                                                                                    1 A M hem
                                                                                                                       //
                        EMENT




                                                                   14 MET lit                        //
                                                  //




                                         1    O    if                                                                                                 1         O       if
                                                                            //                                                                                                                                                                                  oncrete ri e ay                                                                                    U 02
                     GE EAS




                                                                                                                                                      Bin Stora e
                                                            //


                                                                                                                                  5 TRA as
                   DRAINA




                                                                                                   8 TRA as
                                                                                                1 A M hem
                                                                                               PWD

                                                                                               Bin Stora e
                                 NDARY




        10 LIR us                                                                                                                                                                                                           U 11
                                                                                                                                                                                                                                                                                                                                                                              DP                                     U 03
                                     U




         5S         pin
                              RTY BO




                                                                                                                                                                                                                                                                                                                                              1S         pin

                                                                                                                                                                                                                                                                                                                               50mm ecorati e
                                                                                                                                                                                                                                                                                                                                   hite ra el
                            PROPE




                                                                 U 10
                                                                                                                                                                                              U 11
                                                                                                                                                                                                                                                                                                                                                                                                                                         U 03
                                                                                                                                                                                                                                                                         U 12
                                                                                                                                                                                                                                                                                                                 Refer To Architects
                                                                                                                                                                                                                                                                                                                       ra in s

                                                                                                                                                                                                                                                                                                                               U 12                                                                                                          DP                                              U 04
                                                                                                                                                                                                                                                                                                                                                                                                                       1S       pin

                                                                                                                      1S         pin                                                                                                                                                                                                                                                                      50mm ecorati e
                                                                                                                                                                                                       U 12                                                                                                                                                                                                   hite ra el
                                                                                                                      50mm ecorati e
                                                                                                                         ITE ra el

    Client                                                                                       Project                                                                                                                                                                                                                                 NORTH                                         TITLE:                JOB No.: S22011135
                                                                                                                                                                                                                                                                                                                                                                                                                                                        anembo consultants
                                                                                                                                                                                                                                                                                                                                                                                                             FILE:     220120
    Maroolingar PL ATF 20 UT                                                                     Lot 4 Taylor Court, Cooroy                                                                                                                                                                                                                                                                                  DWG. No.    LP1
                                                                                                                                                                                                                                                                                                                                                                                                                                                        Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                                                                        Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Project Management


    This document is the copyright of anembo consultants & shall
                                                                                                 LANDSCAPE OPERATIONAL WORKS                                                                                                                                                                                                                  0      1       2       3    4        5
                                                                                                                                                                                                                                                                                                                                                                                       LANDSCAPE             SHEET     5 OF 7                           anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                                                        Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Moffat Beach   QLD 4551
    not be copied without written approval, nor shall it be used                                                                                                                                                                                                                                                                               SCALE 1:200 @ A3
                                                                                                                                                                                                                                                                                     A     20.01.22 COUNCIL SUBMISSION    CK        TH                                                 CONSTRUCTION &        S ALE 1:100       A1                       Ph: 07 5437 0000
    except for the development and the site specified. Scale
    can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                                                                 email: [email protected]                www.anembo.com
                                                                                                                                                                                               ISSUE    DATE     DESCRIPTION   DRWN CKD ISSUE     DATE     DESCRIPTION    DRWN CKD ISSUE   DATE       DESCRIPTION        DRWN CKD        APPROVED:   T Hindley ALIA 713                SETOUT PLAN           S ALE 1:200       A3
Log in to download the original file

Landscape plan.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.