Council archive · source document
Request to apply Superseded Planning Scheme Report - Detached House SPS25 0003 & SPS25 0003.01 (As Published) · SPS25/0003
1. PROPOSAL
The applicant seeks Council’s agreement to a superseded planning scheme request for a Dwelling
House to enable the lodgement of a Code assessable development application for:
• Material Change of Use – Dwelling House (limited to the subject matter of the required
acceptable outcomes that were not complied with or were not capable of being complied with
under sub-section 5.3.3 (2) of the Noosa Plan 2020 Amendment 2 – 25 September 2020);
• Operational Works – Earthworks, under the Noosa Plan 2020 (Amendment 2 – 25 September
2020).
The Noosa Plan 2020 (Amendment 2 – 26 September 2025) changed the Table of the Assessment
for a Dwelling House in the Medium Density Residential Zone to Impact Inconsistent where the
site is greater than 500m2.
While no significant changes have been made to the assessment benchmarks for Operational
Works – Earthworks for ease of assessment, the applicant seeks to include operational works in
the superseded planning scheme request.
The applicant has submitted an Assessment of Compensation Report for 92 Hilton Terrace
Noosaville, prepared by Herron Todd White, in support of the request.
Figure 1 – Site Locality
Page 2 of 8
Document Set ID: 24660290
Version: 5, Version Date: 10/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to apply Superseded Planning Scheme Report - Detached House SPS25 0003 & SPS25 0003.01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.