Amended Noosa Project Restoration Plan V12_5

Attached to the e-mail OPW22/0029 - SRA application correspondence - Referral agency response – with conditions.

of 75

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Figure 6.5: Location of proposed load out facility located at the end of Hilton Esplanade, Noosaville

The site will be managed by the project’s contracted construction company that is experienced with
this work, having previously been contracted to the Department of Primary Industries in NSW to
undertake a similar intertidal shellfish restoration project.

The operational parameters for the site are presented in Table 6.2.

Table 6.2 Operational parameters

  Parameter           Proposal

  Timeframe:          February – April 2022 subject to permits

  Duration of use:    40 days including mobilisation, demobilisation and potential stand down days

  Management:         Contracted commercial construction company

  Site area:          Exclusive use of 540m2 of road reserve (350m2 at high tide) at the end of
                      Hilton Esplanade (Figure 6.5b)

                      Load out area A = 300m2 area (150m2 at high tide)

                      Load out area B = 200m2 area

                      Load out area connection = 40m2

                      Area A is primarily for rock and equipment loading/unloading operations in
                      association with the barge.

                      Area B is primarily for rock and equipment storage.

                      The load out area connection creates a safe fenced corridor for the movement
                      of the Posi-track loader between Areas A and B.

  Nature of uses:     Movement of up to 7 commercial trucks per day to the site to delivery
                      porphyry rock.

                      Storage of up to 90m3 of rock (150mm to 500mm diameter) per day

                      Loading of rock and dried oyster shell onto the barge using an excavator +
                      Posi-track

                      Storage of loading ramps, vehicle and heavy equipment

                      No chemicals, fuels or liquids will be stored at the site.

  Frequency of        12 hour/day operational. 6am to 6pm including site management.
  use:
                      Expected up to 7 truck movements per day along Hilton Esplanade to deliver
                      rock to the load out site per day.

                      Barge will ferry rock to restoration sites as needed from the load out facility
                      with expected 2- 5 loadings per day subject to tides.


                                                                                                        58
Log in to download the original file

Amended Noosa Project Restoration Plan V12_5.pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.