Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

RFI traffic updated 2016

Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Cooroy Retirement Community
      Traffic Impact Assessment
             Prepared by Calibre Consulting
           Prepared for Palm Lakes Resorts

                            February 2016


                              B14158.ER02
Log in to download the original file

RFI traffic updated 2016.pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 48 pages

Page 2

COMMERCIAL IN CONFIDENCE
All intellectual property rights, including copyright, in        Calibre Consulting
designs developed and documents created by Calibre               Ground Floor, 545 Queen Street
Consulting (Qld) Pty Ltd remain the property of this             BRISBANE QLD 4000
company. Any use made of such design or document
without the prior written approval of Calibre Consulting
(Qld) Pty Ltd will constitute an infringement of the rights of   Ph: (07) 3895 3444
the company which reserves all legal rights and remedies         © 2016
in respect of any such infringement.

The information, including any intellectual property,
contained in this proposal is confidential and proprietary to
the Company. It may only be used by the person to whom
it is provided for the stated purpose for which it is provided
and must not be imparted to any third person without the
prior written approval of the Company. The Company
reserves all legal rights and remedies in relation to any
infringement of its rights in respect of its confidential
information.




DOCUMENT CONTROL
B14158.ER02
 Issue    Date                Issue Details                            Author     Checked    Approved
 A        08-02-2016          Final                                    AK         AK / JvP   JvP (RPEQ 7280)
 B        09-02-2016          Final - minor update to yield            AK         AK/ JvP    JvP (RPEQ 7280)

Page 3

TABLE OF CONTENTS
1      INTRODUCTION ............................................................................................................... 1
       1.1       SUBJECT SITE AND CURRENT SITE DEVELOPMENT ...................................... 1
       1.2       Proposed Site Activity ............................................................................................. 3
2      EXISTING ROAD NETWORK ........................................................................................... 4
       2.1       Site Access ............................................................................................................. 4
       2.2       Traffic Data.............................................................................................................. 4
       2.3       Existing Road Network Conditions .......................................................................... 4
3      TRANSPORT NETWORK ASSESSMENT ...................................................................... 11
       3.1       Traffic Generation ................................................................................................. 11
       3.2       Intersection Assessment ....................................................................................... 12
                 3.2.1    Elm Street (Cooroy Connection Road) / Pearsons Road intersection ..... 12
                 3.2.2    Elm Street (Cooroy Connection Road) / Lamonts Road Intersection ...... 15
                 3.2.3    Elm Street / Diamond Street Intersection ................................................ 16
       3.3       Link Assessment ................................................................................................... 16
       3.4       Refuse Collection .................................................................................................. 17
       3.5       On-Site Car Parking .............................................................................................. 18
       3.6       Aged Care Facility Car Park Entrance Location.................................................... 18
       3.7       SDAP Code Compliance ....................................................................................... 18
4      SUSTAINABLE TRANSPORT NETWORKS ................................................................... 19
       4.1       Pedestrian and Cyclist System ............................................................................. 19
       4.2       Public Transport Provision .................................................................................... 19
5      SUMMARY AND CONCLUSIONS .................................................................................. 21



TABLES

Table 1-1: Proposed Site Activity .............................................................................................. 3
Table 3-1: AM and PM Period Weekday Trip Generation Rates ............................................ 11
Table 3-2: Elm Street (Cooroy Connection Road) / Pearsons Road intersection SIDRA
             assessment outcomes for 2028 Design Year – priority control (give-way sign)
             with and without development ............................................................................ 14
Table 3-3: Existing and 2028 Road Link Assessment with and without Development ............ 17



FIGURES

Figure 1-1: Indicative Site Location (Image: Google Earth) ....................................................... 2
Figure 2-1: Site Locality (Source: Google Maps) ....................................................................... 5
Figure 2-2: Elm Street (Cooroy Connection Road) looking north, note site visible to the
              right (Image: Google Maps) .................................................................................. 6
Figure 2-3: Elm Street (Cooroy Connection Road) looking south, photo taken south of
              Pearsons Road (Image: Google Maps) ................................................................ 6
Figure 2-4: Pearsons Road looking west, site visible on the right (Image: Google Maps) ........ 7
Figure 2-5: Trading Post Road looking north, site visible on the left (Image: Google Maps) ..... 7
Figure 2-6: Trading Post Road looking north-west (note the unsealed turnaround and
              private property access to the right of the photo) (Source: Nearmap) ................. 8
Figure 2-7: Lamonts Road, intersection with Elm Street visible in the background (Image:
              Google Maps) ....................................................................................................... 8
Figure 2-8: Intersection of Elm Street and Diamond Street, aerial view (Source: Google
              Maps) ................................................................................................................... 9
Figure 2-9: Bruce Highway – Elm Street Off-Ramp and Bruce Highway Overpass, aerial
              view (Source: Google Maps) .............................................................................. 10

Page 4

Figure 3-1: Elm Street (Cooroy Connection Road) / Pearsons Road intersection, 2028 AM
              and PM Peak Hour, total volumes including Development Traffic ..................... 12
Figure 3-2: Warrant for Turn Treatments at Elm Street / Pearsons Road Intersection ............ 13
Figure 3-3: Road Functional Layout Plan for Elm Street / Pearsons Road (DA Ref:
              132007.2398.02) ................................................................................................ 14
Figure 3-4: Road Functional Layout Plan for Elm Street / Lamonts Road (DA Ref:
              132007.2398.02) ................................................................................................ 15
Figure 4.1: Translink Public Bus Service 631 shown on the left, Cooroy Township shown
              on the right (Source: Translink) .......................................................................... 19
Figure 4.2: Translink Public Bus Service 632 shown on the left, Cooroy Township shown
              on the right (Source: Translink) .......................................................................... 20



APPENDICES

APPENDIX A               INDICATIVE SITE LAYOUT PLAN
APPENDIX B               TRAFFIC SURVEY DATA
APPENDIX C               SIDRA ASSESSMENT RESULTS
APPENDIX D               VEHICLE TURN PATHS
APPENDIX E               STATE DEVELOPMENT ASSESSMENT PROVISIONS (SDAP)
                         REPORTING

Page 5

1         INTRODUCTION
Calibre Consulting have prepared the following report on behalf of Palm Lakes Resort for the proposed development of a
retirement community at Cooroy, located within the Noosa Shire Council jurisdiction. This report is an update to reporting
previously undertaken at the site (Calibre Consulting Traffic Impact Assessment Report B14158ER01) to account for
additional developable area.

The proposed development area has road frontages alongside Elm Street (Cooroy Connection Road), Pearsons Road,
Trading Post Road and Lamonts Road.

The revised yield now proposes 220 Independent Living Units and 120 aged care beds, as compared to the previous
yield of 164 Independent Living Units and 120 aged care beds.

Key items arising from the previous development applications for the site include the following:

       The provision of upgrade works to Elm Street (Cooroy Connection Road) / Pearsons Road intersection to
        incorporate a Channelised Right Turn (CHR) on a two lane rural road in accordance with Main Roads Technical
        Manuals, Policies and relevant Guidelines.
       The provision of upgrade works to the Elm Street (Cooroy Connection Road) / Lamonts Road intersection to
        incorporate a Channelised Right Turn (CHR) on a two lane rural road in accordance with Main Roads Technical
        Manuals, Policies and relevant Guidelines.
       The provision of sealed pavement at Lamonts Road from Elm Street to 10m beyond the access to the
        development site in accordance with Council design standards and guidelines.
       Provision of a bus stop along Elm Street situated south of the Elm Street / Pearsons Road intersection.
This updated Traffic Impact Assessment report provides information on the expected traffic generated by the revised
development yield and also outlines the assessment of the adjoining traffic network and road intersections. The report
also provides an assessment of the car parking and internal arrangements of the proposed development. These analyses
are consistent with the followings codes and standards:

       Sunshine Coast Regional Council’s Transport and Parking Code
       Queensland Department of Transport and Main Roads’ Road Planning and Design Manual (RPDM)
       Guidelines for Assessment of Road Impacts of Development (GARID, 2006).
Throughout this report the developable area is referred to as ‘the site’ which is located within the parcel of land described
as Lot 1 on RP215922, Lot 2 on RP165418 and Lot 4 on RP215922 (approximately 13.94 hectares in total).

1.1       SUBJECT SITE AND CURRENT SITE DEVELOPMENT
The location of the site is approximately 1.5km north of the town centre of Cooroy. Refer to the site location illustrated in
Figure 1-1. An illustration of the proposed ultimate layout of the retirement community is included in Appendix A.

The developable area is currently mostly vacant land mainly used for grazing that is predominantly occupied by
vegetation, with the exception of a single residential dwelling that is located adjacent to the existing Lamonts Road
frontage. The site area has several road frontages along Elm Street (Cooroy Connection Road) for approximately 600m,
along Pearsons Road for approximately 250m, along Trading Post Road for approximately 180m and at Lamonts Road
for approximately 35m. Access to the site is proposed to occur at the lower order roads, at Lamonts Road, Trading Post
Road and Pearsons Road.

The surrounding property to the north and west of the site is currently bushland with scattered rural residential properties.
Further to the north of the site along Lamonts Road, there are is a private heli-aviation company site. To the west of Elm
Street (Cooroy Connection Road) in the vicinity of the site there is the North Coast Railway Line corridor. The
surrounding property to the south and east of the proposed site are a mix of rural and low density residential allotments.



B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                       COOROY RETIREMENT COMMUNITY                |1

Page 6

Approximately 1km further south of the site along the western side of Elm Street, there is the Cooroy State School for
primary school children.


                                                   Indicative Site Location

  North

         ↑ Pomona (North)                                                                            → Noosa




                                                                     ↓ Bruce Highway (South)
                                Figure 1-1: Indicative Site Location (Image: Google Earth)




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                    COOROY RETIREMENT COMMUNITY            |2

Page 7

1.2       PROPOSED SITE ACTIVITY
The proposed development is a retirement community consisting of aged care apartments, independent living units (ILU),
and shared community centres. Total proposed uses within the site are shown in Table 2-1 with the proposed site layout
shown in Appendix A.

Table 1-1: Proposed Site Activity

 Proposed Site Activity                        Town Planning Definition       Extent

Aged Care Facility                            Residential care facility      120 beds
Independent Living Units (ILUs)               Resort complex                 220 lots
Community Facilities
Clubhouse                                     Indoor sport and recreation    2,100m2 GFA
Bowling Greens                                Outdoor sport and recreation   1,800m2 GFA
Tennis Court                                  Outdoor sport and recreation   800m2 GFA
Men’s Shed / Workshop                         Indoor sport and recreation    280m2 GFA




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                  COOROY RETIREMENT COMMUNITY              |3

Page 8

2         EXISTING ROAD NETWORK
2.1       SITE ACCESS
The local access streets that currently provide access to the site are Trading Post Road, the main access, and Lamonts
Road, the secondary access. The development is proposed to be serviced by three accesses at Lamonts Road, Trading
Post Road and Pearsons Road. The accesses at Lamonts Road and Trading Post Road are proposed to provide entry to
the retirement resort Independent Living Units (ILUs) and community facilities. The Pearsons Road entry is proposed to
provide access to the 120 bed Aged Care Facility and associated car park only. There is no internal roadway connectivity
proposed between the 120 bed Aged Care Facility and the balance of the retirement resort.

Vehicles travelling to the site will likely utilise Elm Street (Cooroy Connection Road) and then either Lamonts Road or
Pearsons Road.

Other roads in the vicinity of the site are Diamond Street (which becomes Tewantin Road (Cooroy-Noosa Road)) located
further to the south which provides a link to Noosa and coastal areas to the east. Tewantin Road (Cooroy-Noosa Road) is
accessed via the Elm Street / Diamond Street intersection, as Diamond Street becomes Tewantin Road (Cooroy Noosa
Road) further east. The Bruce Highway situated to the west of the site is a major road corridor providing a north-south
connection to regional destinations such as Gympie to the north, and Eumundi, Nambour, Maroochydore and Brisbane to
the south. Bruce Highway is accessed either via Myall Street to the south (permitting, or via Elm Street (Cooroy
Connection Road) to the north via the township of Pomona.

2.2       TRAFFIC DATA
For the purpose of this traffic impact assessment, the future year traffic volumes were derived from previous traffic survey
data as well as traffic count data obtained from Transport and Main Roads, refer Appendix B. A growth rate of 3.5% per
annum, compounded annually was adopted to determine future traffic volumes from current data. This is considered to
be a conservative assumption.

The opening year, or completion of the works, is anticipated to be towards the end of 2018. The design horizon year is
2028, that is 10 years from the base year of 2018.

2.3       EXISTING ROAD NETWORK CONDITIONS
The existing roadway network in the immediate vicinity of the site is comprised of the arterial roads Elm Street (Cooroy
Connection Road) and Tewantin Road (Cooroy-Noosa Road). Both of these routes are within the jurisdiction of the
Queensland Department of Transport and Main Roads. Elm Street (Cooroy Connection Road) fronts the western
boundary of the site. Tewantin Road (Cooroy-Noosa Road) begins as Diamond Street, at the intersection with Elm Street
approximately 1.5km south of the site. Refer Figure 2-1.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                     COOROY RETIREMENT COMMUNITY                 |4

Page 9

                                                                                            North

                                                       Trading
                                                      Post Road
                   Lamonts Road




            Elm Street (Cooroy
            Connection Road)
                                                                    Pearsons Road




                                                                  Diamond
                                                                   Street




                                    Figure 2-1: Site Locality (Source: Google Maps)
Elm Street (Cooroy Connection Road) is a two-way arterial that is sealed single lane carriageway along its length.
Adjacent to the site boundary, Elm Street has a posted speed environment of 100km/h, however the section of Elm Street
south of Pearsons Road has a posted speed environment of 60km/h. Further south of Pearsons Road along Elm Street
there is a school zone with warning signage and speed reductions applicable during school periods. Along its route, Elm
Street is generally 7m in width. The approximate traffic volume along the route is 9,875vpd (TMR, 2013). Elm Street is
mainly used as an access corridor to other local streets in the area, however south of Pearsons Road there are property
accesses directly fronting Elm Street. Along the Elm Street site frontage there are no formal footpaths or cycle ways,
street lighting, or kerb and channel. Further along Elm Street south of the intersection with Pearsons Road towards the
existing school zone, there are footpaths, on-street cycle pathways, street lighting and kerb and channel. Refer Figure
2-2 and Figure 2-3.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                  COOROY RETIREMENT COMMUNITY               |5

Page 10

Figure 2-2: Elm Street (Cooroy Connection Road) looking north, note site visible to the right (Image: Google Maps)




  Figure 2-3: Elm Street (Cooroy Connection Road) looking south, photo taken south of Pearsons Road (Image: Google
                                                        Maps)
The local roads in the vicinity of the site are Pearsons Road, Trading Post Road and Lamonts Road.

Pearsons Road is a sealed two-way single lane carriageway with no line marking along its length. The posted speed
environment of Pearsons Road is 50km/h, consistent with its classification as a local access street. There are formal
pedestrian pathways located on the southern side of Pearsons Road along its entire length and on the northern side
between Trading Post Road and Kensington Drive to the east. There is generally good street lighting and formed kerb
and channel along the length of Pearsons Road. Refer Figure 2-4.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                   COOROY RETIREMENT COMMUNITY            |6

Page 11

                Figure 2-4: Pearsons Road looking west, site visible on the right (Image: Google Maps)
Trading Post Road is a two-way sealed single lane carriageway with kerb and channel along its length. The posted speed
environment of Trading Post Road is 50km/h, consistent with its classification as a local access street. There are
pedestrian pathways located on the northern side of Trading Post Road along its entire length. Trading Post Road is a
no-through route that terminates at a gravel turnaround. Refer Figure 2-5 and Figure 2-6.




               Figure 2-5: Trading Post Road looking north, site visible on the left (Image: Google Maps)




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                   COOROY RETIREMENT COMMUNITY             |7

Page 12

 Figure 2-6: Trading Post Road looking north-west (note the unsealed turnaround and private property access to the right
                                            of the photo) (Source: Nearmap)
Lamonts Road is currently an unsealed no-through road that provides access to several residential properties and the
heli-aviation company. The posted speed environment of Lamonts Road is 50km/h, consistent with its classification as a
local access street. Do note that the posted speed of the existing Elm Street / Lamonts Road intersection is 100km/h.
Refer Figure 2-7.




         Figure 2-7: Lamonts Road, intersection with Elm Street visible in the background (Image: Google Maps)




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                   COOROY RETIREMENT COMMUNITY               |8

Page 13

Further south of the site along Elm Street (Cooroy Connection Road) there is the Elm Street / Diamond Street
intersection which provides connectivity to the town centre of Cooroy via Elm Street to the south, access to the eastern
coastal areas including Noosa via Diamond Street to the east. Note that Diamond Street becomes Tewantin Road
(Cooroy-Noosa Road) further to the east. The intersection is priority controlled (stop sign) with priority along the north-
south Elm Street intersection approaches. There is a channelised right turn lane from the southern approach, an auxiliary
left turn lane on the northern approach, and a high angle left turn slip lane from the eastern approach. Within the vicinity
of the intersection Diamond Street is a two-way single lane sealed carriageway. Refer Figure 2-8.




              Figure 2-8: Intersection of Elm Street and Diamond Street, aerial view (Source: Google Maps)
It is important to note that this intersection also provides access to the Cooroy train station commuter car park. The
access to the commuter car park is priority controlled (stop sign) located to the west of the intersection.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                      COOROY RETIREMENT COMMUNITY                |9

Page 14

  Figure 2-9: Bruce Highway – Elm Street Off-Ramp and Bruce Highway Overpass, aerial view (Source: Google Maps)

To the west of the township of Cooroy, the Bruce Highway provides a major north-south link to destinations such as
Gympie, Nambour and Brisbane. Refer Bruce Highway (North) off-ramp at Elm Street, and the Elm Street underpass in
Figure 2.9. The Bruce Highway (North) is currently accessed via Pomona, although it is understood that works are
currently underway by the Queensland Government to provide an interchange at the northern end of Elm Street to
provide both access and egress to the northbound and southbound directions along the Bruce Highway. The new
interchange is due to be opened later this year in 2016, before the development base year of 2018. This northern
connection to the Bruce Highway is not anticipated to affect the site traffic directionality of development vehicle trips.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                      COOROY RETIREMENT COMMUNITY              | 10

Page 15

3           TRANSPORT NETWORK ASSESSMENT
The traffic and transport impact of the proposed development will be considered in this section. For the purposes of the
assessment, it is anticipated that the proposed development will likely be fully developed by the end of year 2018. The 10
year post-construction design horizon will therefore be 2028.

3.1         TRAFFIC GENERATION
The trip generation rate and development traffic for each of the site uses is shown in Table 3-1.
The trip generation rates have been based on the RTA Guide to Traffic Generating Developments. The trip generation
rate for ‘Housing for aged and disabled persons’ is 1 – 2 daily vehicle trips per dwelling, or 0.1 – 0.2 evening peak hour
vehicle trips per dwelling. The guidelines indicate that the trip generation rates of resident funded facilities are generally
greater than subsidised facilities as indicated by the higher end of the range. Therefore a rate of 0.2 evening peak hour
vehicle trips per dwelling has been adopted for the 120 bed aged care facility within the site. A higher trip generation rate
has been applied to the ILUs within the site that is consistent with the RTA Guidelines in relation to medium density
residential flat buildings for smaller units and flats (up to two bedrooms), that is up to 0.5 weekday peak hour vehicle trips
per dwelling. The trip generation rates for the retirement community do not assume a level of self-containment (within the
site), although it is highly probable that some trips will be social visits or recreational trips internal to the retirement
community. Do note that the following assessment is conservative in this regard.

The community facilities within the site are intended for use by the residents and their visitors only. Therefore all trips
associated with the community facilities at the site are internal trips only.

Table 3-1: AM and PM Period Weekday Trip Generation Rates

    Proposed Site Activity             Number of Units/Beds      Final AM Period Trips               Final PM Period Trips

Aged Care Facility                    120 beds                  = 0.2 * 120                        = 0.2 * 120
                                                                =24vph                             =24vph
Independent Living Units (ILUs) 220 units                       = 0.5 * 220                        = 0.5 * 220
                                                                = 110vph                           = 110vph
Total                                 340 units/beds            134vph                             134vph

1
    RTA or Roads and Traffic Authority NSW, “Guide to Traffic Generating Developments” (2002).



Note that there are three proposed accesses to the site, with development traffic proposed to access the site as follows:

         Person Road access: proposed access for the 120 bed facility only
         Trading Post Road: proposed access for approximately 50% of all trips associated with the ILUs
         Lamonts Road: proposed access for approximately 50% of all trips associated with the ILUs


The directionality of trips in/out of the site is as follows:

         In/out split of 30/70 during the AM peak hour, with the reverse during the PM peak hour
         Total 79vph total two-way development traffic at the Elm Street (Cooroy Connection Road) / Pearsons Road
          intersection. During the morning peak hour, 24vph travel towards the site, and 55vph travel away from the site.
          The reverse is true during the evening peak hour.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                        COOROY RETIREMENT COMMUNITY             | 11

Page 16

       Total 55vph total two-way development traffic at Elm Street (Cooroy Connection Road) / Lamont Road. During
        the morning peak hour, 17vph travel towards the site, and 38vph travel away from the site. The reverse is true
        during the evening peak hour.
       At Elm Street (Cooroy Connection Road), it is anticipated that 90% of the 134vph total two-way development
        traffic travels south towards the town centre of Cooroy, and the remaining 10% travels north.
       The existing properties along Lamonts Road include several (less than 5) rural residential properties and the
        heli-aviation company. It is anticipated that the existing traffic volumes along Lamonts Road is approximately
        20vph in both the AM and PM peaks. Therefore during the current morning peak hour, it is anticipated that
        around 4vph travel towards Lamonts Road, and 16vph travel away from Lamonts Road. The reverse is
        anticipated to be true during the evening peak hour.
       At the Elm Street (Cooroy Connection Road) / Diamond Street intersection the existing directional split of traffic
        as per TMR intersection count (2013) has been adopted for the following assessment. That is, from the northern
        approach 30% of the outgoing development traffic is anticipated to travel east along Diamond Street towards
        Noosa and Tewantin, and 70% of the outgoing development traffic is anticipated to travel south towards the
        Cooroy town centre and destinations accessed via the Bruce Highway such as Nambour and Brisbane, 15% of
        the incoming development traffic is anticipated to originate from the east from Diamond Street and 85% of the
        traffic is anticipated to originate from the south at Elm Street.


Please do note that it is anticipated that up to 10% of all trips may occur by PT or active mode shares however the
following assessment is conservative in allowing for 100% car mode share.

3.2       INTERSECTION ASSESSMENT
The future year (2028) traffic volumes for the intersections within the vicinity of the site have been adjusted to include the
anticipated peak hour development traffic volumes. Each intersection is discussed below.

3.2.1     ELM STREET (COOROY CONNECTION ROAD) / PEARSONS ROAD
          INTERSECTION

The anticipated future year traffic volumes, including the development traffic, are presented below in Figure 3-1.

      AM Peak                                                    PM Peak
       Hour




Figure 3-1: Elm Street (Cooroy Connection Road) / Pearsons Road intersection, 2028 AM and PM Peak Hour, total
volumes including Development Traffic


B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                       COOROY RETIREMENT COMMUNITY             | 12

Page 17

The intersection under base year 2018 traffic volumes without the development traffic volumes satisfies the TMR
warrants for channelised right turn treatment lane from the southern approach. Refer Figure 3-2 TMR warrants, showing
in grey the 2018 traffic volumes without the development. In the future design horizon year 2028 in the fully developed
scenario, the TMR warrants for channelised right turn lane from the southern approach, as well as the short auxiliary left
turn lane from the northern approach are satisfied, refer Figure 3-2.




                            Peak Hour Turn Movement                          Major Road Traffic
                                From Major Road                              Volume Parameter
            2018 Base Year Without Development
                    QR = 39 vph max during AM Peak Hour          QM = 1041 vpd total two-way AM Peak Hour
                    QR = 41 vph max during PM Peak Hour          QM = 1076 vpd total two-way PM Peak Hour
                    QL = 3 vph max during AM Peak Hour           QM = 752 vpd total two-way AM Peak Hour
                    QL = 3 vph max during PM Peak Hour           QM = 546 vpd total two-way PM Peak Hour
            2028 Design Horizon Year With Development
                    QR = 77 vph max during AM Peak Hour          QM = 1520 vph total two-way AM Peak Hour
                    QR = 108 vph max during PM Peak Hour         QM = 1572 vph total two-way PM Peak Hour
                    QL = 6 vph max during AM Peak Hour           QM = 1095 vph total one-way AM Peak Hour
                    QL = 10 vph max during PM Peak Hour          QM = 785 vph total one-way PM Peak Hour
Figure 3-2: Warrant for Turn Treatments at Elm Street / Pearsons Road Intersection
(Source: DTMR Roads Planning and Design Manual, Chapter 13, Figure 13.23)

It is understood that as part of the previous development conditions for the site, that a commitment stands to upgrade the
Elm Street / Pearsons Road intersection to include a channelised right turn treatment at the southern approach and a
short auxiliary left turn lane from the northern approach. Please refer to Council’s Development Works Approval No.
132007.2398.02. Please also refer to Figure 3-3 showing the functional road layout plan by Calibre Consulting Drawing
15-001261-RF02.


B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                     COOROY RETIREMENT COMMUNITY           | 13

Page 18

Figure 3-3: Road Functional Layout Plan for Elm Street / Pearsons Road (DA Ref: 132007.2398.02)



The proposed intersection configuration as shown in Figure 3-3 was assessed in SIDRA for the future design horizon
year 2028. In accordance with GARID, the SIDRA results are reported for the scenario without the development (no
intersection upgrade) and with the development (with intersection upgrade). The SIDRA results are summarised below.

Table 3-2: Elm Street (Cooroy Connection Road) / Pearsons Road intersection SIDRA assessment outcomes for 2028
Design Year – priority control (give-way sign) with and without development


                                         Degree of     Level of          95th Percentile          Delay
 Scenario                                Saturation    Service (LOS)     Queue Length (m)         (s)

2028 AM Peak Hour – without                  0.55             B                   29                      4
development traffic
2028 AM Peak Hour – with development         0.82            D                    31                      49
traffic & intersection upgrade
2028 PM Peak Hour – without                  0.44             A                   47                      4
development traffic
2028 PM Peak Hour – with development         0.40             B                    7                      21
traffic & intersection upgrade



B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                 COOROY RETIREMENT COMMUNITY            | 14

Page 19

The SIDRA results show that the intersection configuration with the development will continue to operate adequately in
future year 2028 at worst DOS 0.82 being for the Pearsons Road intersection approach during the 2028 AM peak hour
with the development. For the Elm Street intersection approaches during the 2028 AM and PM peak hours, the worst
DOS is 0.56 with the development, which indicates that there is reserve capacity at the major approaches. The SIDRA
modelling results show that all of the traffic operations output parameters are within the bounds of what are considered to
be satisfactory operational conditions for the 10 year development horizon scenario.

The detailed design of all intersection turn treatments are to be undertaken in accordance with the relevant design
standards and guidelines.

3.2.2     ELM STREET (COOROY CONNECTION ROAD) / LAMONTS ROAD INTERSECTION

The anticipated development traffic movements at this intersection is up to 55vph total in each peak hour period
throughout the assessment period. The total background traffic anticipated in the base year 2018 at the intersection is in
the order of 1,492vph in the AM Peak and 1,546vph in the PM peak. The development traffic as a proportion of the total
background traffic movements at the intersection in the base year 2018 is less than 5%, being 3.7% in the AM peak and
3.6% in the PM peak. In the design year 2028, the proportion of the development traffic is 2.6% in the AM peak and 2.5%
in the PM peak. This is well below the general 5% threshold that triggers more detailed assessments. Notwithstanding, it
is understood that a commitment exists to upgrade the intersection configuration to re-align the Lamonts Road approach.
The proposed intersection works also include the provision of a right turn lane and left turn lane treatments. Please refer
to Council’s Development Works Approval No. 132007.2398.02 and the functional road layout plan by Calibre Consulting
Drawing 15-001261-RF01 shown in Figure 3-4.




Figure 3-4: Road Functional Layout Plan for Elm Street / Lamonts Road (DA Ref: 132007.2398.02)


B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                     COOROY RETIREMENT COMMUNITY            | 15

Page 20

Based on the small proportion of development traffic at the intersection (less than 5%) and the proposed intersection
configuration, there are no mitigation measures proposed at this intersection location.


3.2.3     ELM STREET / DIAMOND STREET INTERSECTION

The anticipated development traffic movements at this intersection consists of 121vph total during peak periods
throughout the assessment period. The total background traffic anticipated in the design horizon year 2028 at the
intersection is in the order of 3,211vph in the AM Peak and 3,010vph in the PM peak. In the design year of 2018 the
development traffic as a proportion of the background traffic is 5.7% which declines during the assessment period to the
design horizon year 2028. In the design horizon year 2028, the development traffic as a proportion of the background
traffic is 3.8% in the AM peak and 4.0% in the PM peak. This is ultimately below the 5% threshold that triggers more
detailed assessments.

Based on the low proportion of the development traffic (less than 5% in the ultimate design year 2028) at the intersection,
it is anticipated that the development will not significantly impact on the performance of this intersection. As such, there
are no mitigation measures required at the intersection.



3.3       LINK ASSESSMENT
The key road corridor for the proposed development site is Elm Street (Cooroy Connection Road) that runs along the site
frontage. This route is single lane carriageway within the development area of interest. The location of the route within the
local road hierarchy is an arterial route. Arterial routes consisting of single lane carriageway can typically accommodate
an “amenity” volume of 950 vehicles per hour per lane. Further south of the site at Diamond Street eventually becomes
the Cooroy – Noosa Road arterial link to the east. Similar to Elm Street, this arterial road is single lane carriageway and
can typically accommodate an “amenity” volume of 950 vehicles per hour per lane.

The local roads Lamonts Road and Trading Post Road within the vicinity of the site are no-through routes. Since these
routes currently provide property access to local residents only, and are lowly trafficked (anticipated <200vpd) Lamonts
Road and Trading Post Road have not been included in the following road link assessment. However do note that
Lamonts Road is currently unsealed along its entire length, and provides access to several residential dwellings
(estimated to be less than 5) as well as the heli-aviation company. Austroads Guidelines indicate that unsealed road links
may accommodate up to 150vpd. It is anticipated that the background traffic volumes along Lamonts Road currently
exceed this threshold. The development traffic along Lamonts Road may vary up to 410vpd along the western extent of
the route.

The existing 2014 estimated through traffic volumes and the future 2028 traffic volumes have been obtained from traffic
counts as well as traffic survey data obtained from the Department of Transport and Main Roads.

The road link assessment in Table 3-3 indicates that the road corridors surround the site are generally operating with
reserve capacity at the link level. However, the capacity of the major arterial route Elm Street in the southbound direction
is constrained from Pearsons Road south to Diamond Street.

The development traffic is anticipated to have minimal impact on the practical capacity of the existing major road
corridors during peak periods.

The proportion of heavy vehicles accessing the site is negligible with only about 2 service vehicles per day expected.

The road corridors in the vicinity of the proposed development site are anticipated to provide good emergency vehicle
access surrounding the proposed site. There are many passing opportunities for private vehicles to allow for emergency
vehicle priority, as all of the streets and roads surrounding the site are two-lane or their width allows for stopping
opportunities.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                      COOROY RETIREMENT COMMUNITY            | 16

Page 21

Table 3-3: Existing and 2028 Road Link Assessment with and without Development
                                   Existing
                                                                          Future 2028                  Future 2028
                                    2014        Existing   Future 2028                   Future 2028                  Change in
                                                                           Volume to                    Volume to
                     Estimated    Estimated     Volume      Volume –                      Volume –                    Volume to
                                                                           Capacity                     Capacity
      Road Link      Capacity      Through         to      Without Site                   With Site                   Capacity
                                                                            Ratio –                    Ratio – With
                       (vph)     Traffic Peak   Capacity   Development                   Development                   Ratio in
                                                                          Without Site                     Site
                                   Volume        Ratio        (vph)                         (vph)                       2028
                                                                          Development                  Development
                                    (vph)
Elm Street             950          252          0.27          408           0.43           428           0.45         +0.02
(Cooroy                            (464)        (0.49)        (752)         (0.79)         (788)         (0.83)       (+0.04)
Connection Road)
–northbound after
Pearsons Road
Elm Street             950          658          0.69        1,065           1.12          1,101          1.16         +0.04
(Cooroy                            (478)        (0.50)       (774)          (0.82)         (794)         (0.84)       (+0.02)
Connection Road)
– southbound
before Pearsons
Road
Elm Street             950          284          0.30          459           0.48           496           0.52         +0.04
(Cooroy                            (495)        (0.52)        (801)         (0.84)         (885)         (0.93)        +0.09
Connection Road)
–northbound
before Pearsons
Road
Elm Street             950          718          0.76        1,162           1.22          1,246          1.31         +0.09
(Cooroy                            (495)        (0.52)       (801)          (0.84)         (838)         (0.88)        +0.04
Connection Road)
– southbound after
Pearsons Road
Elm Street             950          427          0.45          691           0.73           728           0.77         +0.04
(Cooroy                            (467)        (0.49)        (756)         (0.80)         (840)         (0.88)       (+0.08)
Connection Road)
– northbound after
Diamond Street
Elm Street             950          828          0.87         1,340          1.41           1,424         1.50         +0.09
(Cooroy                            (638)        (0.67)       (1,031)        (1.09)         (1,068)       (1.12)       (+0.03)
Connection Road)
– southbound
before Diamond
Street
Pearsons Road –        300           37          0.12          60             0.20           84           0.28         +0.08
eastbound before                    (38)        (0.13)        (62)          (+0.21)        (117)         (0.39)       (+0.18)
Trading Post Road
Pearsons Road –        300           65          0.22         105            0.35           160           0.53         +0.18
westbound after                     (28)        (0.09)        (45)          (0.15)          (69)         (0.23)       (+0.08)
Trading Post Road


Note: AM peak values are not in brackets, PM peak values are in brackets

3.4        REFUSE COLLECTION
Within the retirement community, the proposed network of internal roadways are considered to provide appropriate
access for refuse collection services. The roads within the site are all 6.0m wide carriageways minimum. The standard
width of a Refuse Collection Vehicle (RCV) is 2.5m. Therefore it is considered that the internal road network provides an
adequate level of access for a refuse vehicle. Refuse collection is anticipated to occur infrequently, eg: once a week.


B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                           COOROY RETIREMENT COMMUNITY              | 17

Page 22

Within the aged care facility, refuse collection is proposed to take place at the loading/service area, refer layout plan in
Appendix A. It is considered that the location of the internal access roadways are suitable to accommodate an RCV,
refer vehicular access and egress movements and turning paths shown in Appendix D. The vehicle turning templates
confirm that functional access arrangements to all service areas has been provided within the site

It is considered that the proposed road network and road elements provide adequate access for refuse collection
vehicles.

3.5       ON-SITE CAR PARKING
On-site resident and visitor car parking is accommodated by the proposed design. An allowance of 1 resident vehicle is
to be garaged within each allotment. The site also provides 55 visitor car parking spaces scattered across the retirement
community (ILUs) development, which is equivalent to 1 visitor space per 4 ILU allotments as per previous development
conditions for the site. The visitor car parking spaces are conveniently located within easy walking distance to all units.
The amount of visitor parking as per RTA Guidelines (Section 5.4.2 for medium density residential flat buildings)
recommends 1 visitor car parking space per each five units. The provision of on-site visitor car parking within the
retirement community is greater than the than the suggested provision in the RTA Guidelines. Similar developments have
in the past demonstrated that visitor numbers are typically low, since most visitors attending the site pick up residents
rather than remaining on the site for long periods. The number of visitor car parks for the ILUs is hence considered to be
sufficient given the nature of the development.

The aged care facility has a designated car park consisting of visitor and staff parking. Provision has been made for 24
visitor parks (at a rate of 1 visitor space per 5 aged care units) with the balance of car parks provided for employee
parking. The provision and location of the car parking spaces are considered to provide good amenity at the site. The
number of car parks for the Aged Care Facility is considered to be appropriate for the nature of the development.

3.6 AGED CARE FACILITY CAR PARK ENTRANCE LOCATION
 A brief review of the proposed aged care facility car park entrance has been undertaken. Whilst this car park is subject to
detail design, it is noted that the proposed layout is as follows:

   It is proposed that the aged care facility car park access be a left-in/left-out configuration with separate crossovers for
    entry movements and exit movements.
   The entrance driveway is situated at a distance greater than 20m from the intersection of Elm Street (Cooroy
    Connection Road) and Pearsons Road
   The nearest local road intersection is Carruthers Crescent. The proposed driveway exit driveway is located greater
    than 10m from this local road intersection.
   The exit and entry crossovers are located minimum 3m from adjacent private driveways.
   The majority of the traffic movements associated with the site access will be either left turns into the access and
    carpark area or right turn movements out of the site as there are very limited destinations further east along
    Pearsons Road. Given the estimated relatively low traffic volumes it is recommended that a standard crossover be
    provided. In addition, no other road infrastructure is required, that is as either short right turn lanes in or left turn
    lanes in to the site.

3.7       SDAP CODE COMPLIANCE
Reporting on the relevant State Development Assessment Provisions (SDAP) is included in Appendix E. The proposed
development achieves the requirements of applicable State regulations and guidelines. There are no anticipated impacts
arising from the proposed development on the management and operation of the adjoining state-controlled road corridor.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                        COOROY RETIREMENT COMMUNITY              | 18

Page 23

4         SUSTAINABLE TRANSPORT NETWORKS
4.1       PEDESTRIAN AND CYCLIST SYSTEM
On Elm Street, pedestrian pathways are located on the eastern side between Diamond Street and Pearsons Road and
on the western side between Diamond Street and the entrance to Cooroy State School, adjacent to Sapphire Street.
There are pedestrian pathways located on the south of Pearsons Road along its entire length and on the northern side
between Trading Post Road and Kensington Drive. There are pedestrian pathways located on the northern side of
Trading Post Road along its entire length. Lamonts Road has no existing pedestrian pathways.

As per previous development application advice, it is understood that additional pathways are proposed on the western
side of Elm Street between Pearsons Road and the proposed additional bus stop location. On the northern side of
Pearsons Road a pathway along the site frontage with two pedestrian accesses into the development are proposed. It is
suggested that a pathway be installed on the southern side of Trading Post Road along the site frontage to connect with
the existing pathway around the cul-de-sac.

There are no designated bikeways surrounding the study area, however it is likely that the surrounding road network
could be utilised by cyclists. The road shoulders on Elm Street between Diamond Street and Pearsons Street are of
varying width and quality. The proposed development is anticipated to have negligible impact on the local cyclist traffic.

4.2       PUBLIC TRANSPORT PROVISION
There are several rail and bus options available in the Cooroy region that provide travel choice for residents within the
community.

Translink information indicates that there are existing bus stops through the Cooroy township along Maple Street,
Diamond Street and Tewantin Road (Cooroy-Noosa Road). The nearest bus stop to the proposed site is located
approximately 1.1km south along Elm Street adjacent to the Diamond Street intersection (bus stop ID 301598). This bus
stop services route 631 that provides connectivity between Noosa, Tewantin, Cooroy, Eumundi, Yandina and Nambour
South, as well as route 632 that provides connectivity to Pomona and Cooran further north. Refer Figure 4.1 and Figure
4.2. The bus routes operate with a frequency of one bus every hour.




 Figure 4.1: Translink Public Bus Service 631 shown on the left, Cooroy Township shown on the right (Source: Translink)




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                      COOROY RETIREMENT COMMUNITY              | 19

Page 24

 Figure 4.2: Translink Public Bus Service 632 shown on the left, Cooroy Township shown on the right (Source: Translink)
The Cooroy railway station is the nearest rail service providing connectivity to Brisbane and the Sunshine Coast, located
approximately 1.5km south of the site along Elm Street. The Cooroy railway station provides approximately 100 car parks
within the commuter car park. There are approximately four trains per day servicing the Cooroy railway station.

It is understood that a commitment exists to install an indented bus stop alongside the southbound lane of Elm Street,
south of Pearsons Road. The proposed configuration is shown in Calibre Consulting Drawing 15-001261-RF02 (refer
Figure 3-3) and also refer to Council’s Development Works Approval No. 132007.2398.02.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                    COOROY RETIREMENT COMMUNITY            | 20

Page 25

5         SUMMARY AND CONCLUSIONS
Based on the assessment of the network it is concluded that the majority of the road links and intersection arrangements
as proposed will be able to accommodate the anticipated traffic volumes to at least the design year of 2028. The forecast
demand estimates are based on the ultimate development scenario as outlined above.

The key finding of this traffic impact assessment is that the proposed intersection treatments and infrastructure is
sufficient to support the proposed development. There are no adverse impacts anticipated as a result of the development
traffic generated by the expanded developable site area. Based on the analysis there are no further mitigation measures
proposed.

The current level of design detail available for this DA phase shows that the proposed development layout is compliant
with the relevant State Planning Codes.

The detailed design of all upgrade works including intersection turn treatments and road treatments are to be undertaken
in accordance with the relevant design standards and guidelines.




B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                   COOROY RETIREMENT COMMUNITY             | 21

Page 26

             CALIBRE CONSULTING




APPENDICES


[OCR of page images]
APPENDICES

 

Page 27

                                                                              CALIBRE CONSULTING




APPENDIX A INDICATIVE SITE LAYOUT PLAN




B14158.ER02-0 | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS   COOROY RETIREMENT COMMUNITY   | 23

Page 28

                                                                                               193       192        191       190        189        188                       187
214   213    211   210   209   208    207     199     198   197     196     195        194

                                                                                                                                                                              186                               DETENTION

                                                                                                                                                                              185
                   206          201                                         177        178     179       180        181       182        183        184
            212                         200    174          175     176                                                                                                                        160
                                                                                                                                                                              161
                   205          202

                                                            171     170     169        168     167       166        165       164        163        162
                                              173
                                203

                                              172                                                                                                                        157        158        159
                                204

                                              146           147     148     149        150     151       152          153     154        155        156
                                                                                                                                                                                                                                                                                                           7m EASEMENT
                                              145
                                                            131     130     129        128     127       126          125     124        123        122
                                              144


                                              143




                                                                                                                                                                                                                                                                                                                                                   T
                                                                                                                                                                                                                                                                                                                                                   EN
                                                                                                                                                                                DETENTION
                                                                                                                                   120           121




                                                                                                                                                                                                                                                                                                                                              SEM
                                                                                                   132
                                              142                 141




                                                                                                                                                                                                                                                                                                                                              EA
                                                                                             133
                                                                          140                                               119




                                                                                                                                                                                                                                                                                                                                          8m
                                                                                      134                                                 105
                                                139                                                                 118
                                                                            135                                                    106
                                                      138                                                  117
                                                                                                                            107
                                                                                                   116                                                        104
                                                            137                                                       108
                                                                                             115                                                    103
                                                                                                              109                                                        90
                                                                                                                                                                                                                                                                                              220
                                                                   136                                                                     102
                                                                                                     110                                                        91                                                                                                                                  219
                                                                          114




                                                                                                                                                                                                                                                                                                                                 T
                                                                                                                                    101




                                                                                                                                                                                                                                                                                                                            EN
                                                                                                                                                      92                                                                                                                                                       218
                                                                                                                                                                                         89




                                                                                                                                                                                                                                                                                                                         SEM
                                                                                113                                          100                                                                                                                                                       215
                                                                                                                                               93




                                                                                                                                                                                                                                                                                                                         EA
                                                                                      112                                                                                      88                                                                                                             216
                                                                                                                      99                                                                             74




                                                                                                                                                                                                                                                                                                                        6m
                                                                                                                                     94
                                                                                             111                                                                         87                                                                                                                          217
                                                                                                                                                                                          75
                                                                                                                              95
                                                                                                   98                                                           86
                                                                                                                                                                                    76
                                                                                                                                                                                                                     73                                   DETENTION
                                                                                                                                                         85
                                                                                                         97                                                               77
                                                                                                                                               84                                                              72
                                                                                                                 96                                                                                                            58                                                                                       BIN STORAGE AREA
                                                                                                                                                                 78
                                                                                                                                                                                                     71                                                                  1
                                                                                                                       83                                 79                                                             59
                                                                                                                                                                                           70                                                                                     2
                                                                                                                              82                                                                                60
                                                                                                                                                                                                                                                57
                                                                                                                                                                                    69                                                                                                  3
                                                                                                                                    81                                                                61
                                                                                                                                                                          68                                                          56                      42
                                                                                                                                                                                               62                                                                                              4
                                                                                                                                           80                                                                                  55
                                                                                                                                                                                                                                                    43                                              5
                                                                                                                                                    67                               63
                                                                                                                                                                                                                         54
                                                                                                                                                                                                                                          44                                                               6
                                                                                                                                                           66                                                       53                                                       41

                                                                                                                                                                                                          52                    45                                                                                  7
                                                                                                                                                                    65                                                                                             40
                                                                                                                                                                                                                                                                                       27
                                                                                                                                                                                                                          46                                                                                                 8
                                                                                                                                                                          64                                                                              39
                                                                                                                                                                                                                    47                                                        28
                                                                                                                                                                                                                                                                                                                                     9
                                                                                                                                                                                51                                                                  38
                                                                                                                                                                                                                                                                    29
                                                                                                                                                                                                                                                                                                    26                                   10
                                                                                                                                                                                          50                                              37
                                                                                                                                                                                                                                     36                       30
                                                                                                                                                                                                                                                                                              25
                                                                                                                                                                                                49                                                                                                             11
                                                                                                                                                                                                                                                     31
                                                                                                                                                                                                                                                                                       24
                                                                                                                                                                                                          48                                                                                         12
                                                                                                                                                                                                                                               32
                                                                                                                                                                                                                                                                              23
                                                                                                                                                                                                                35                                                                             13
                                                                                                                                                                                                                                                                        22
                                                                                                                                                                                                                         34                                                              14
                                                                                                                                                                                                                                                               21
                                                                                                                                                                                                                               33                                                 15

                                                                                                                                                                                                                                                                         16
                                                                                                                                                                                                                                      20
                                                                                                                                                                                GATEHOUSE
                                                                                                                                                                                                                                                19

                                                                                                                                                                                                                                                         18

                                                                                                                                                                                                                                                               17




                                                                                                                                                                                                                                                0m                                      50m                                  100m                       150m   200m


                                                                                                                                                                                                                                                                                                    SCALE 1:2500 (AT A3)


                                                                                                                                                         OVERALL SITE PLAN


[OCR of page images]
 

 

| 214 | 213 211

 

 

 

 

 

 

 

 

 

 

 

 

212

 

ce
1
|

 

 

 

 

 

 

 

 

 

 

 

 

a™~
x 3
5 i
=
S 42m NX
LANDSCAPE
TREATMENT << 20a | 17?
aN 146
145
12m
LANDSCAPE 144
TREATMENT
143,

 

 

 

139

LANDSCAPE:
‘TREATMENT

 
 
  
 

 

WITHIN

ROOF OVERHANG

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SETBACK

18,000mm_MINIMUM

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

DETENTION

 

 

TREATMENT

‘COURT

\carernens CARAVAN, CARAVAN

| PARKING
Ht

   

WASHDOWN

   
    
    
  

BIN STORAGE AREA

2m
LANDSCAPE
‘TREATMENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

é 8
¢| < = GATEHOUSE
& RESIDENCE & So = wane
qe Max. Cover 65.0% Total Ss 2 TREATMENT
2 - 2 oe PEDESTRIAN M
ENTRY a waa ——"S\
FARE RATED WALL 60/60/60
+—Garage to Boundary — 2m
TREATHENT
(02 SITING CONSTRAINTS
(OTT GENERIC SITE AREA - 254.0 Sqm
PROPOSED RESORT DEVELOPMENT—AREA 121,378sqm
TOTAL DWELLINGS = 220
MIN VISITOR SPACES = 55
MIN LOT SIZE = 230sqm
PRIVATE OPEN SPACE MIN/LOT = 20sqm
PRIVATE OPEN SPACE MIN WIDTH = 3m
MAX SITE COVER = 65%
MIN 450mm EAVES, EXEPT TO GARAGES BUILT TO ZERO LOT LINE
MAX SINGLE STOREY NOT GREATER THAN 6m IN HEIGHT
MIN 12° ROOF PITCH
MIN SETBACK TO PUBLIC ROAD 6m
(EXCLUDING COVERED OUTDOOR AREA)
MIN PROPERTY BOUNDARY SETBACK = 3m
CAR PARKING LOCATIONS MAY ALTER IN FINAL LAYOUT.
NOTE: GARAGE MAY BE BUILT TO ZERO LOT LINE
PROPOSED AGED CARE DEVELOPMENT—AREA 20,245sqm
TOTAL BEDS = 120
CAR PARKING LOCATIONS MAY ALTER IN FINAL LAYOUT.
0 50m 100m 150m 200m
SCALE 1:2500 (AT A3)
© coprricht DRAWING REFERENCE No, HOUSE TYPE 7 VARIATION DEVELOPMENT NAME DRAWN
suureemeetersrs | co-g00-2014 |S SE Fc coor |) || Foam
BEHALF OF PALM LAKE GROUP. lest
aN oe, CEN Na nn os Fe — PATE |PRWN Oe 7 RP2IS9Ce —_rv"Nseet Ne “ »
SOUTHPORT CENTRAL TOWER 3
LAWSON ST SOUTHPORT QLD 4215 E ae pee, ol & LOT 1 & 2 RP165416> Ol
PO BOX 10479 SOUTHPORT BC QLD 4215 F LAYOUT osvosi EJ | STREET |TRADING POST RD ABN TT 915 457 981 ACN 006 277 098
PH: 07 5552 1300 FAX: 07 5552 1399 LAWSON ST SOUTHPORT OLD 4215
Email: [email protected] GY Ane Suan [i671o7s] EJ |SUBURB |COOROY 0 2 PO BOK 0479 SOUTHPORT BELO 415
H] save savs|_ey [econe [4563 | state[OLD soci neGpaite cin a

 

 

 

 

 

 

 

 

 

 

 

S Website: www.PalmLakeResort.com.au

Y

Page 29

                                 CALIBRE CONSULTING




APPENDIX B TRAFFIC SURVEY DATA


[OCR of page images]
CALIBRE CONSULTING

APPENDIX B_ TRAFFIC SURVEY DATA

Page 30

                                                                                                     Traffic Analysis and Reporting System
                                                                                                     Intersection Analysis Report                                                                                   TARS
                                                                     Region 207 - North Coast        Road Section 145 - Cooroy Connection Road
16-Nov-2014 13:13                                                                   Intersection 95 - Rd142/Rd145 1.96km (Id95)                                                                            Page 1 of 2 (2 of 3)
                                                                                      Wednesday 09-Feb-2011 06:00 - 18:00

                                                                                                                  Summary



         Rd Section 145   Site 21832                                                 N                                                            Road
             Leg 1     0 degrees                                                                                                  Leg   Angle     Section     Site    TDist   Site Description
                                                                                                                                    1         0   145        21832    1.980   Rd 145-Int Rd 142 S/B
                                                                                                                                    2        90   142        21833    0.000   Rd 142-Int Rd 145 W/B
                                 3,479 (5.3% HV)
                                 1,742 (5.7% HV)



                                                                                                                                    3       180   145        21834    1.980   Rd 145-Int Rd 142 N/B
           (5.6% HV)
           3839




                                                                                                                            Leg    Period     Left Turn     Through   Right Turn    U Turn   Pedestrians
                                                                                                                             1      Total       1742          3479


                                                                       Rd Section 142
                                                                                                                                              5.7% HV       5.3% HV
                                                       4575               Leg 2                                                   AM Peak        218           529
                                                       (6.3% HV)                                                                              2.8% HV       4.3% HV
                                                                                                                                  PM Peak        154           421
                                                                                                                                              4.5% HV       6.7% HV
                                                                                    90 degrees



                                                                                                                             2     Total        3208                      1010
                                                                                                                                              7.9% HV                   7.0% HV
                                                                                        Site 21833




                                                                                                                                  AM Peak        397                       62
                                                   1,010 (7.0% HV)                                                                            7.1% HV                   4.8% HV
                                                                                                                                  PM Peak        327                       71
                                                   3,208 (7.9% HV)                                                                            8.9% HV                   8.5% HV
                                                                                                                             3     Total                      2829        2833
                                                                                                                                                            5.1% HV     6.7% HV
                                                                                                                                  AM Peak                      323         260
                                                                                                                                                            6.2% HV     6.5% HV
                                                                                                                                  PM Peak                      350         354
                                                                                                                                                            6.6% HV     7.1% HV
             2,829 (5.1% HV)
             2,833 (6.7% HV)




                               (6.6% HV)
                               6687




         Rd Section 145   Site 21834
           Leg 3      180 degrees

Page 31

                                                                                        Traffic Analysis and Reporting System
                                                                                        Intersection Analysis Report                                                                                                        TARS
                                                           Region 207 - North Coast        Road Section 145 - Cooroy Connection Road
16-Nov-2014 13:13                                                         Intersection 95 - Rd142/Rd145 1.96km (Id95)                                                                                              Page 2 of 2 (3 of 3)
                                                                            Wednesday 09-Feb-2011 06:00 - 18:00




                                                        Leg 1                                                  Leg 2                                           Leg 3
                           Time     Left    Through     Right   U-Turn   Pedestrians    Left    Through   Right    U-Turn   Pedestrians   Left   Through    Right    U-Turn   Pedestrians   Total Traffic 1/4 hr
                     06:00-0615      19          37                                      34                   5                                        8       23                           126
                     06:15-0630      27          40                                      46                   6                                       15       18                           152
                     06:30-0645      38          43                                      56                   9                                       25       38                           209
                     06:45-0700      38          44                                      51                  15                                       21       28                           197
                     07:00-0715      31          62                                      54                  13                                       21       42                           223
                     07:15-0730      41          77                                      87                  12                                       33       35                           285
                     07:30-0745      72          90                                      61                   8                                       38       54                           323
                     07:45-0800      55          99                                      88                  13                                       52       49                           356
                     08:00-0815      56         123                                      99                  18                                       61       70                           427
                     08:15-0830      40         143                                     122                  18                                      108       64                           495
                     08:30-0845      69         140                                     106                  11                                       94       76                           496
                     08:45-0900      53         123                                      70                  15                                       60       50                           371
                     09:00-0915      32         102                                      56                  20                                       49       55                           314
                     09:15-0930      42          95                                      65                  12                                       43       62                           319
                     09:30-0945      35          68                                      55                  14                                       58       53                           283
                     09:45-1000      29          72                                      61                  19                                       48       58                           287
                     10:00-1015      45          70                                      67                  18                                       46       56                           302
                     10:15-1030      38          65                                      65                  19                                       50       47                           284
                     10:30-1045      37          48                                      61                  15                                       49       65                           275
                     10:45-1100      39          52                                      52                  17                                       57       64                           281
                     11:00-1115      32          59                                      61                  23                                       45       47                           267
                     11:15-1130      27          58                                      63                  20                                       49       64                           281
                     11:30-1145      43          55                                      56                  11                                       37       49                           251
                     11:45-1200      35          63                                      70                  18                                       41       62                           289
                     12:00-1215      34          45                                      73                  26                                       41       67                           286
                     12:15-1230       28          54                                      67                 27                                        62      57                           295
                     12:30-1245       25          64                                      56                 23                                        51      70                           289
                     12:45-1300       20          63                                      61                 32                                        67      51                           294
                     13:00-1315       41          55                                      60                 14                                        56      60                           286
                     13:15-1330       28          65                                      67                 19                                        51      51                           281
                     13:30-1345       43          39                                      42                 24                                        54      47                           249
                     13:45-1400       21          51                                      62                 26                                        56      55                           271
                     14:00-1415       23          52                                      62                 30                                        61      62                           290
                     14:15-1430       35          47                                      62                 30                                        61      58                           293
                     14:30-1445       32          89                                      68                 34                                        80      56                           359
                     14:45-1500       39        109                                       83                 15                                        88      76                           410
                     15:00-1515       34        161                                       83                 20                                        83      92                           473
                     15:15-1530       39          76                                      80                 14                                        88      94                           391
                     15:30-1545       42          75                                      81                 22                                        91      92                           403
                     15:45-1600       39          81                                      82                 23                                        67      66                           358
                     16:00-1615       33          84                                      73                 51                                        76      69                           386
                     16:15-1630       34          65                                      78                 39                                        84      75                           375
                     16:30-1645       34          73                                      58                 38                                        72      70                           345
                     16:45-1700       31          77                                      71                 16                                        96      82                           373
                     17:00-1715       36          53                                      53                 26                                      115       75                           358
                     17:15-1730       26          65                                      64                 49                                        71      68                           343
                     17:30-1745       27          62                                      60                 33                                        92      61                           335
                     17:45-1800       25          46                                      56                 30                                        58      50                           265
                           Total   1742        3479                                    3208               1010                                      2829    2833
                    %Truck/Bus       5.5         4.8                                     6.9                6.9                                       4.7     5.7
                    %Articulated       .2          .5                                    1.1                  .1                                       .4     1.0
                    %RoadTrain         .0          .0                                      .0                 .0                                       .0       .0
                       AM Peak      218         529                                     397                  62                                      323     260
                       PM Peak      154         421                                     327                  71                                      350     354




                                                                         Blank cells indicate the non-collection of corresponding counts.


[OCR of page images]
 

Ke 2) Queensland Traffic Analysis and Reporting System

 

GES Government Intersection Analysis Report
— Region 207 - North Coast Road Section 145 - Cooroy Connection Road
16-Nov-2014 13:13 Intersection 95 - Rd142/Rd145 1.96km (Id95) Page 2 of 2 (3 of 3)

Wednesday 09-Feb-2011 06:00 - 18:00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Leg 1 Leg 2 Leg 3
Time | Left | Through | Right | U-Turn | Pedestrians U-Turn | Pedestrians || Left | Through | Right | U-Turn | Pedestrians || Total Traffic 1/4 hr
06:00-0615, 19 37 8 23 126
06:15-0630, 27 40 15 18 152
06:30-0645, 38 43 25 38 209
06:45-0700 38 44 al 28 197
07:00-0715, 31 62 al 42 223
07:15-0730 41 7 33 35. 285,
07:30-0745, 72 90 38 54 323
07:45-0800 55 99 52 49 356
08:00-0815, 56 123 61 70 427
08:15-0830, 40 143 108 64 495,
08:30-0845, 69 140 94 76 496
08:45-0900 53 123 60 50 371
09:00-0915 32 102 49 55 314
09:15-0930 42 95 43 62 319
09:30-0945 35. 68 58 53 283,
09:45-1000, 29 72 48 58 287
10:00-1015, 45 70 46 56 302
10:15-1030, 38 65 50 47 284
10:30-1045, 37 48 49 65 275
10:45-1100, 39 52 57 64 281
11:00-1115, 32 59 45 47 267
11:15-1130, 27 58 49 64 281
11:30-1145, 43 55 37 49 251
11:45-1200, 35. 63 41 62 289
12:00-1215, 34 45 41 67 286
12:15-1230, 28 54 62 57 295,
12:30-1245, 25 64 51 70 289
12:45-1300, 20 63 67 51 294
13:00-1315, 41 55 56 60 286
13:15-1330, 28 65 51 51 281
13:30-1345, 43 39 54 47 249
13:45-1400, 21 51 56 55 271
14:00-1415, 23 52 61 62 290
14:15-1430, 35, 47 61 58 293
14:30-1445, 32 89 80 56 359°
14:45-1500, 39 109 88 76 410
15:00-1515, 34 161 83 92 473
15:15-1530, 39 76 88 94 391
15:30-1545, 42 75 o1 92 403,
15:45-1600, 39 81 67 66 358
16:00-1615, 33, 84 76 69 386
16:15-1630, 34 65 84 75 375
16:30-1645, 34 73 72 70 345,
16:45-1700, 31 77 96 82 373
17:00-1715, 36 53 115 75 358
17:15-1730, 26 65 71 68 343
17:30-1745, 27 62 92 61 335,
17:45-1800, 25 46 58 50 265
Total | 1742 3479 2829 | 2833
%Truck/Bus 5.5 48 47 5.7
%Articulated 2 5 4 1.0
‘%RoadTrain 0 0 O 0
AM Peak 218 529 323 260
PM Peak 154 421 350 (354

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blank cells indicate the non-collection of corresponding counts.

Page 32

                                          1
 Background traffic
 volume of 20vph
 peak volume                                       2
                                                   14
 assumed for Lamonts
 Road, as indicated
                                    3




Updated data from TMR
used in this location




     2007 AM Peak Traffic Volumes Adapted From Traffic Data Sourced From McCormick Rankin Cagney
     (July 2008)

Page 33

                                         2
 Background traffic
 volume of 20vph
 peak volume                                       1
                                                   3
 assumed for Lamonts
 Road, as indicated                 14




Updated data from TMR
used in this location




      2007 PM Peak Traffic Volumes Adapted From Traffic Data Sourced From McCormick Rankin Cagney
      (July 2008)

Page 34

                                      CALIBRE CONSULTING




APPENDIX C SIDRA ASSESSMENT RESULTS


[OCR of page images]
CALIBRE CONSULTING

APPENDIX C SIDRA ASSESSMENT RESULTS

Page 35

LANE SUMMARY
    Site: Elm Street / Pearson Road AM Peak 2028 without dev
New Site
Giveway / Yield (Two-Way)



 Lane Use and Performance
              Demand Flows                 Deg.   Lane     Average     Level of     95% Back of Queue          Lane      Lane Cap. Prob.
                  Total HV        Cap.     Satn    Util.    Delay      Service         Veh        Dist         Config   Length Adj. Block.
                 veh/h   %       veh/h      v/c     %          sec                                  m                       m   %       %
 South: Elm Street
 Lane 1              460   0.0    1560    0.295     100         9.6     LOS A            4.2         29.4       Full      500   0.0    0.0
 Approach            460   0.0            0.295                 9.6         NA           4.2         29.4

 East: Pearson Road
 Lane 1              105   0.0     366    0.287     100        17.8     LOS B            1.0          7.2       Full      500   0.0    0.0
 Approach            105   0.0            0.287                17.8     LOS B            1.0          7.2

 North: Elm Street
 Lane 1           1065     0.0    1950    0.546     100         0.1     LOS A            0.0          0.0       Full      500   0.0    0.0
 Approach         1065     0.0            0.546                 0.1         NA           0.0          0.0

 Intersection     1630     0.0            0.546                 4.0         NA           4.2         29.4


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: Brown Consulting | Processed: Monday, 15 December 2014 5:03:03 PM
Project: H:\B14\150-199\B14158.R\Technical\Elm St - Pearson Rd 2028 AM & PM - without & with dev_ver28.01.16.sip6

Page 36

LANE SUMMARY
    Site: Elm Street / Pearson Road PM Peak 2028 without dev
New Site
Giveway / Yield (Two-Way)



 Lane Use and Performance
              Demand Flows                 Deg.   Lane     Average     Level of     95% Back of Queue          Lane      Lane Cap. Prob.
                  Total HV        Cap.     Satn    Util.    Delay      Service         Veh        Dist         Config   Length Adj. Block.
                 veh/h   %       veh/h      v/c     %          sec                                  m                       m   %       %
 South: Elm Street
 Lane 1              801   0.0    1834    0.437     100         6.5     LOS A            6.8         47.3       Full      500   0.0    0.0
 Approach            801   0.0            0.437                 6.5         NA           6.8         47.3

 East: Pearson Road
 Lane 1               45   0.0     441    0.102     100        14.1     LOS A            0.3          2.3       Full      500   0.0    0.0
 Approach             45   0.0            0.102                14.1     LOS A            0.3          2.3

 North: Elm Street
 Lane 1              774   0.0    1949    0.397     100         0.1     LOS A            0.0          0.0       Full      500   0.0    0.0
 Approach            774   0.0            0.397                 0.1         NA           0.0          0.0

 Intersection     1620     0.0            0.437                 3.7         NA           6.8         47.3


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: Brown Consulting | Processed: Monday, 15 December 2014 5:03:04 PM
Project: H:\B14\150-199\B14158.R\Technical\Elm St - Pearson Rd 2028 AM & PM - without & with dev_ver28.01.16.sip6

Page 37

LANE SUMMARY
    Site: Elm Street / Pearson Road AM Peak 2028 with dev - functional layout

Giveway / Yield (Two-Way)



 Lane Use and Performance
              Demand Flows                 Deg.   Lane     Average     Level of     95% Back of Queue          Lane      Lane Cap. Prob.
                  Total HV        Cap.     Satn    Util.    Delay      Service         Veh        Dist         Config   Length Adj. Block.
                 veh/h   %       veh/h      v/c     %          sec                                  m                       m   %       %
 South: Elm Street
 Lane 1              419   0.0    1970    0.213     100         0.0     LOS A            0.0          0.0       Full      500   0.0    0.0
 Lane 2               77   0.0     397    0.194     100        14.8     LOS B            0.7          4.9      Short       60   0.0    NA
 Approach            496   0.0            0.213                 2.3         NA           0.7          4.9

 East: Pearson Road
 Lane 1              161   0.0     196    0.822     100        48.9     LOS D            4.4         30.8       Full      500   0.0    0.0
 Approach            161   0.0            0.822                48.9     LOS D            4.4         30.8

 North: Elm Street
 Lane 1                6   0.0    1828    0.003     100         5.5     LOS A            0.0          0.0      Short       15   0.0    NA
 Lane 2           1095     0.0    1970    0.556     100         0.1     LOS A            0.0          0.0       Full      500   0.0    0.0
 Approach         1101     0.0            0.556                 0.1         NA           0.0          0.0

 Intersection     1758     0.0            0.822                 5.2         NA           4.4         30.8


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: CALIBRE CONSULTING (QLD) PTY LTD | Processed: Friday, 29 January 2016 11:26:23 AM
Project: H:\B14\150-199\B14158.R\Technical\Elm St - Pearson Rd 2028 AM & PM - without & with dev_ver28.01.16.sip6

Page 38

LANE SUMMARY
    Site: Elm Street / Pearson Road PM Peak 2028 with dev - functional layout
New Site
Giveway / Yield (Two-Way)



 Lane Use and Performance
              Demand Flows                 Deg.   Lane     Average     Level of     95% Back of Queue          Lane      Lane Cap. Prob.
                  Total HV        Cap.     Satn    Util.    Delay      Service         Veh        Dist         Config   Length Adj. Block.
                 veh/h   %       veh/h      v/c     %          sec                                  m                       m   %       %
 South: Elm Street
 Lane 1              778   0.0    1950    0.399     100         0.1     LOS A            0.0          0.0       Full      500   0.0    0.0
 Lane 2              108   0.0     722    0.150     100         9.8     LOS A            0.6          4.2      Short       60   0.0    NA
 Approach            886   0.0            0.399                 1.2         NA           0.6          4.2

 East: Pearson Road
 Lane 1               69   0.0     235    0.293     100        21.1     LOS B            1.0          6.9       Full      500   0.0    0.0
 Approach             69   0.0            0.293                21.1     LOS B            1.0          6.9

 North: Elm Street
 Lane 1               10   0.0    1857    0.005     100         5.5     LOS A            0.0          0.0      Short       15   0.0    NA
 Lane 2              785   0.0    1950    0.403     100         0.1     LOS A            0.0          0.0       Full      500   0.0    0.0
 Approach            795   0.0            0.403                 0.1         NA           0.0          0.0

 Intersection     1750     0.0            0.403                 1.5         NA           1.0          6.9


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: CALIBRE CONSULTING (QLD) PTY LTD | Processed: Friday, 29 January 2016 3:35:01 PM
Project: H:\B14\150-199\B14158.R\Technical\Elm St - Pearson Rd 2028 AM & PM - without & with dev_ver28.01.16.sip6

Page 39

                                CALIBRE CONSULTING




APPENDIX D VEHICLE TURN PATHS


[OCR of page images]
CALIBRE CONSULTING

APPENDIX D VEHICLE TURN PATHS

Page 40

           -
         CC___

        BBQ AREA
                   DECK




 __
CC___


[OCR of page images]
 

 

1.60 m

 

STEERING LOCK ANGLE = 29.3 deg,
ACHIEVED STEERING ANGLE:

30 deg, SWEEP ANGLE: 18.5 deg.
60 deg. SWEEP ANGLE: 25.2 deg,
90 deg. SWEEP ANGLE: 27.7 deg,
120 deg. SWEEP ANGLE: 28.7 deg.
150 deg. SWEEP ANGLE: 29.1 deg.

3.10 m 180 deg. SWEEP ANGLE: 29.2 deg.

}
|
|
|

 

 

 

Sunshine Coast WRV
Custom

ou ou tou

 

LE, 15-0026t-102.duq_DATE: 09-12-2015 TIME: 0805
iret’: X_{5-001061_TITLE X_15-O01261_BASE X_15-001261_CONTS X_15-0O1261_CUTFLLHATCH USR: Samantha Thorpe

   
    
   
    
  
   
  
 
  

 

 

Sunshine Coast WRV

eters
width £2.50
Track 12/50

Lock to Lock Time :6.0
Steering Angle 229.3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REF NO. 132007.2398.02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD

 

PALM LAKE RESORT

 

CONSULTING

Diss Cater Ueber heiwy Sngpon SumbneCoat — Lc4004

 

 

aes ee — 38 Neybourne Street, Crelmer QLD 4068 PALM LAKE WORKS PTY LTD Cc a E SITE LAYOUT

MB 1500 1 5 0 10 20 M1 Mob: 0412 744 223 E: [email protected] — a’ TURN TEMPLATES

HG Drawn cuecn| '1207 »% PROJECT Wo, [ APPROVED 19 TRADING POST ROAD il Clr Consuiting (QLD) Pty Lid $.C.C. REFUSE VEHICLE

fr 15-001261 paren me COOROY calibre areal aa Sots fae re ooeLsKil4 |
s|F ="

 

 

Page 41

                                                 CALIBRE CONSULTING




APPENDIX E   STATE DEVELOPMENT ASSESSMENT PROVISIONS (SDAP)
             REPORTING


[OCR of page images]
CALIBRE CONSULTING

APPENDIX E STATE DEVELOPMENT ASSESSMENT PROVISIONS (SDAP)
REPORTING

Page 42

                                                                                                                                                      Response column key:
                                                                                                                                                           Achieved
19.1     Access to state-controlled roads state code                                                                                                      P/S Performance solution
                                                                                                                                                          N/A Not applicable
Table 19.1.1: All development
Performance outcomes                       Acceptable outcomes                                                 Response   Comment
Location of the direct vehicular access to the state-controlled road
PO1 Any road access location to the        AO1.1 Any road access location to the state-controlled              N/A        There is currently no road access to the state-controlled
state-controlled road from adjacent land   road complies with a decision under section 62 of the TIA.                     road network from the site.
does not compromise the safety and         OR
efficiency of the state-controlled road.
                                           AO1.2 Development does not propose a new or                         
                                           temporary road access location, or a change to the use or
                                           operation of an existing permitted road access location to
                                           a state-controlled road.
                                           OR

                                           AO1.3 Any proposed road access location for the                     
                                           development is provided from a lower order road where
                                           an alternative to the state-controlled road exists.
                                           OR all of the following acceptable outcomes apply

                                           AO1.4 Any new or temporary road access location, or a               N/A
                                           change to the use or operation of an existing permitted
                                           road access location, demonstrates that the development:
                                           (1) does not exceed the acceptable level of service of a
                                               state-controlled road
                                           (2) meets the sight distance requirements outlined in
                                               Volume 3, parts 3, 4, 4A, 4B and 4C of the Road
                                               planning and design manual, 2nd edition, Department
                                               of Transport and Main Roads, 2013
                                           (3) does not exceed the acceptable operation of an
                                               intersection with a state-controlled road, including the
                                               degree of saturation, delay, queuing lengths and
                                               intersection layout
                                           (4) is not located within and/or adjacent to an existing or
                                               planned intersection in accordance with Volume 3,
                                               parts 4, 4A, 4B and 4C of the Road planning and
                                               design manual, 2nd edition, Department of Transport
                                               and Main Roads, 2013
                                           (5) does not conflict with another property’s road access
                                               location and operation.



State development assessment provisions                    Module 19 — State transport network functionality                            19.1 Access to state-controlled roads state code
23 November 2015 V1.7                                                                                                                                                            Page 1 of 4

Page 43

Performance outcomes                         Acceptable outcomes                                                       Response   Comment
                                             Editor’s note: To demonstrate compliance with this acceptable
                                             outcome, it is recommended a traffic impact assessment be
                                             developed in accordance with Chapters 1, 4, 6, 7, 8 and 9 of the
                                             Guidelines for assessment of road impacts of development
                                             (GARID), Department of Main Roads, 2006, and the
                                             requirements of Volume 3, parts 4, 4A, 4B and 4C of the Road
                                             planning and design manual, 2nd edition, Department of
                                             Transport and Main Roads, 2013, SIDRA analysis or traffic
                                             modelling.
                                             AND

                                             AO1.5 Development does not propose a new road access                      N/A
                                             location to a limited access road.
                                             Editor’s note: Limited access roads are declared by the chief
                                             executive under section 54 of the TIA. Details can be accessed
                                             by contacting the appropriate DTMR regional office.
Number of road accesses to the state-controlled road
PO2 The number of road accesses to the       AO2.1 Development does not increase the number of                         
state-controlled road maintains the safety   road accesses to the state-controlled road.
and efficiency of the state-controlled
road.                                        AND

                                             AO2.2 Where multiple road accesses to the premises                                  There is currently no direct road access to the state-
                                             exist, access is rationalised to reduce the overall number                           controlled road network from the site.
                                             of road accesses to the state-controlled road.

                                             AND

                                             AO2.3 Shared or combined road accesses are provided                       N/A
                                             for adjoining land having similar uses to rationalise the
                                             overall number of direct accesses to the state-controlled
                                             road.

                                             Editor’s note: Shared road accesses may require easements to
                                             provide a legal point of access for adjacent lots. If this is required,
                                             then the applicant must register reciprocal access easements on
                                             the titles of any lots for the shared access.

Design vehicle and traffic volume
PO3 The design of any road access            AO3.1 Any road access meets the minimum standards                         
maintains the safety and efficiency of the   associated with the design vehicle.
state-controlled road.                       Editor’s note: The design vehicle to be considered is the same as
                                             the design vehicle set under the relevant local government


State development assessment provisions                        Module 19 — State transport network functionality                                19.1 Access to state-controlled roads state code
23 November 2015 V1.7                                                                                                                                                                    Page 2 of 4

Page 44

Performance outcomes                         Acceptable outcomes                                                  Response   Comment
                                             planning scheme.
                                             AND
                                             AO3.2 Any road access is designed to accommodate the                 
                                             forecast volume of vehicle movements in the peak periods
                                             of operation or conducting the proposed use of the
                                             premises.
                                             AND
                                                                                                                  
                                             AO3.3 Any road access is designed to accommodate 10
                                             year traffic growth past completion of the final stage of
                                             development in accordance with GARID.
                                             AND
                                                                                                                  
                                             AO3.4 Any road access in an urban location is designed
                                             in accordance with the relevant local government
                                             standards or IPWEAQ R-050, R-051, R-052 and R-053
                                             drawings.
                                             AND
                                                                                                                  
                                             AO3.5 Any road access not in an urban location is
                                             designed in accordance with Volume 3, parts 3, 4 and 4A
                                             of the Road planning and design manual, 2nd edition,
                                             Department of Transport and Main Roads, 2013.

Internal and external manoeuvring associated with direct vehicular access to the state-controlled road
PO4 Turning movements for vehicles           AO4.1 The road access provides for left in and left out              N/A        There is currently no direct road access to the state-
entering and exiting the premises via the    turning movements only.                                                         controlled road network from the site.
road access maintain the safety and
efficiency of the state-controlled road.     AND

                                             AO4.2 Internal manoeuvring areas on the premises are                           Internal manoeuvring areas are designed so that all vehicles
                                             designed so the design vehicle can enter and leave the                          can enter and leave the site in a forward gear at all times.
                                             premises in a forward gear at all times.                                        Please refer to Traffic Impact Assessment.
                                             Editor’s note: The design vehicle to be considered is the same as
                                             the design vehicle set under the relevant local government
                                             planning scheme.
PO5 On-site circulation is suitably          AO5.1 Provision of on-site vehicular manoeuvring space                         There is existing on-site circulation that is suitably designed
designed to accommodate the design           is provided to ensure the flow of traffic on the state-                         to accommodate the anticipated development traffic. There
vehicle associated with the proposed         controlled road is not compromised by an overflow of                            is no queueing or adverse impact arising on the external
land use, in order to ensure that there is   traffic queuing to access the site in accordance with                           road network. Please refer to the Traffic Impact
no impact on the safety and efficiency of    AS2890 – Parking facilities.                                                    Assessment.
the state-controlled road.                   AND




State development assessment provisions                       Module 19 — State transport network functionality                             19.1 Access to state-controlled roads state code
23 November 2015 V1.7                                                                                                                                                                Page 3 of 4

Page 45

Performance outcomes                         Acceptable outcomes                                                Response   Comment
                                         AO5.2 Mitigation measures are provided to ensure that                            As above, there are no mitigation measures required.
                                         the flow of traffic on the state-controlled road is not
                                         disturbed by traffic queuing to access the site.
Vehicular access to local roads within 100 metres of an intersection with a state-controlled road
PO6 Development having road access to        AO6.1 The road access location to the local road is                          Refer to the Traffic Impact Assessment.
a local road within 100 metres of an         located as far as possible from where the road intersects
intersection with a state-controlled road    with the state-controlled road and accommodates existing
maintains the safety and efficiency of the   operations and planned upgrades to the intersection or
state-controlled road.                       state-controlled road.

                                             AND

                                             AO6.2 The road access to the local road network is in              
                                             accordance with Volume 3, parts 3, 4 and 4A of the Road
                                             planning and design manual, 2nd edition, Department of
                                             Transport and Main Roads, 2013, and is based on the
                                             volume of traffic and speed design of both the local road
                                             and intersecting state-controlled road for a period of 10
                                             years past completion of the final stage of development.

                                             AND

                                             AO6.3 Vehicular access to the local road and internal              
                                             vehicle circulation is designed to remove or minimise the
                                             potential for vehicles entering the site to queue in the
                                             intersection with the state-controlled road or along the
                                             state-controlled road itself.




State development assessment provisions                     Module 19 — State transport network functionality                            19.1 Access to state-controlled roads state code
23 November 2015 V1.7                                                                                                                                                             Page 4 of 4

Page 46

                                                                                                                                                              Response column key:
                                                                                                                                                                   Achieved
19.2      Transport infrastructure and network design state code                                                                                                  P/S Performance solution
                                                                                                                                                                  N/A Not applicable
Table 19.2.1: All development
Performance outcomes                              Acceptable outcomes                                                 Response   Comment
All state transport infrastructure – except state-controlled roads
PO1 Development does not compromise               No acceptable outcome is prescribed.                                          There is no impact to the state transport infrastructure or
the safe and efficient management or                                                                                             transport networks. Please refer to the Traffic Impact
operation of state transport infrastructure                                                                                      Assessment.
or transport networks.
Editor’s note: To demonstrate compliance with
this performance outcome, it is recommended
that a traffic impact assessment be prepared.
A traffic impact assessment should identify
any upgrade works required to mitigate
impacts on the safety and operational integrity
of the state transport corridor.
PO2 Development does not compromise               AO2.1 The layout and design of the proposed                                   The proposed development does not impact on the delivery
planned upgrades to state transport               development accommodates planned upgrades to state                             of state transport infrastructure.
infrastructure or the development of              transport infrastructure.
future state transport infrastructure in          AND
future state transport corridors.
Editor’s note: Written advice from DTMR           AO2.2 The layout and design of the development                                The proposed development does not impact on the delivery
advising that there are no planned upgrades of
                                                  accommodates the delivery of state transport                                   of state transport infrastructure or future state transport
state transport infrastructure or future state
transport corridors that will be compromised      infrastructure in future state transport corridors.                            corridors.
by the development will assist in addressing      Editor’s note: To demonstrate compliance with this acceptable
this performance outcome.                         outcome, it is recommended that a traffic impact assessment be
                                                  prepared.

PO3 Development does not adversely                AO3.1 Development does not require a new railway                    
impact on the safety of a railway                 crossing.
crossing.                                         OR

                                                  AO3.2 A new railway crossing is grade separated.                    N/A
                                                  OR

                                                  AO3.3 Impacts to level crossing safety are mitigated.               N/A
                                                  Editor’s note: To demonstrate compliance with this acceptable
                                                  outcome, it is recommended that a traffic impact assessment be
                                                  prepared. An impact on a level crossing may require an
                                                  Australian Level Crossing Assessment Model (ALCAM)
                                                  assessment to be undertaken. Section 2.2 – Railway crossing


State development assessment provisions                           Module 19 — State transport network functionality                   19.2 Transport infrastructure and network design state code
23 November 2015 V1.7                                                                                                                                                                    Page 1 of 3

Page 47

Performance outcomes                              Acceptable outcomes                                                 Response   Comment
                                                  safety of the Guide to Development in a Transport Environment:
                                                  Rail, Department of Transport and Main Roads, 2015, provides
                                                  guidance on how to comply with this acceptable outcome.
                                                  AND

                                                  AO3.4 Upgrades to a level crossing are designed and                 N/A
                                                  constructed in accordance with AS1742.7 – Manual of
                                                  uniform traffic control devices, Part 7: Railway crossings
                                                  and applicable rail manager standard drawings.
                                                  AND


                                                  AO3.5 Access points achieve sufficient clearance from a             N/A
                                                  level crossing in accordance with AS1742.7 – Manual of
                                                  uniform traffic control devices, Part 7: Railway crossings
                                                  by providing a minimum clearance of 5 metres from the
                                                  edge running rail (outer rail) plus the length of the largest
                                                  vehicle anticipated on-site.
                                                  AND


                                                  AO3.6 On-site vehicle circulation is designed to give               
                                                  priority to entering vehicles at all times.
State-controlled roads
PO4 Development does not compromise               No acceptable outcome is prescribed.                                          Refer to the Traffic Impact Assessment.
the safe and efficient management or
operation of state-controlled roads.
Editor’s note: A traffic impact assessment will
assist in addressing this performance
outcome.
PO5 Development does not compromise               AO5.1 The layout and design of the development                      
planned upgrades of the state-controlled          accommodates planned upgrades of the state-controlled
road network or delivery of future state-         road.
controlled roads.                                 AND
Editor’s note: Written advice from DTMR that
there are no planned upgrades of state-
controlled roads or future state-controlled       AO5.2 The layout and design of the development                      
roads which will be compromised by the            accommodates the delivery of future state-controlled
development will assist in addressing this
performance outcome.
                                                  roads.
                                                  Editor’s note: To demonstrate compliance with this acceptable
                                                  outcome, it is recommended that a traffic impact assessment be




State development assessment provisions                           Module 19 — State transport network functionality                   19.2 Transport infrastructure and network design state code
23 November 2015 V1.7                                                                                                                                                                    Page 2 of 3

Page 48

Performance outcomes                       Acceptable outcomes                                                Response   Comment
                                           prepared.

PO6 Upgrade works on, or associated        AO6.1 Upgrade works for the development are consistent             
with, the state-controlled road network    with the requirements of the Road planning and design
are undertaken in accordance with          manual, 2nd edition, Department of Transport and Main
applicable standards.                      Roads, 2013.
                                           AND


                                           AO6.2 The design and staging of upgrade works on or                
                                           associated with the state-controlled road network are
                                           consistent with planned upgrades.

PO7 Development does not impose            AO7.1 New lower order roads do not connect directly to a           
traffic loadings on the state-controlled   state-controlled road.
road network which could be                AND
accommodated on the local road
network.
                                           AO7.2 The layout and design of the development directs             
                                           traffic generated by the development to use lower order
                                           roads.




State development assessment provisions                   Module 19 — State transport network functionality                 19.2 Transport infrastructure and network design state code
23 November 2015 V1.7                                                                                                                                                          Page 3 of 3

Page 49

    CALIBRE CONSULTING




www.calibreconsulting.co


[OCR of page images]
Se

(er||le)f

CONSULTING

www.calibreconsulting.co

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.