Original source · versioned page text
RFI traffic updated 2016
Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.
Table 3-3: Existing and 2028 Road Link Assessment with and without Development
Existing
Future 2028 Future 2028
2014 Existing Future 2028 Future 2028 Change in
Volume to Volume to
Estimated Estimated Volume Volume – Volume – Volume to
Capacity Capacity
Road Link Capacity Through to Without Site With Site Capacity
Ratio – Ratio – With
(vph) Traffic Peak Capacity Development Development Ratio in
Without Site Site
Volume Ratio (vph) (vph) 2028
Development Development
(vph)
Elm Street 950 252 0.27 408 0.43 428 0.45 +0.02
(Cooroy (464) (0.49) (752) (0.79) (788) (0.83) (+0.04)
Connection Road)
–northbound after
Pearsons Road
Elm Street 950 658 0.69 1,065 1.12 1,101 1.16 +0.04
(Cooroy (478) (0.50) (774) (0.82) (794) (0.84) (+0.02)
Connection Road)
– southbound
before Pearsons
Road
Elm Street 950 284 0.30 459 0.48 496 0.52 +0.04
(Cooroy (495) (0.52) (801) (0.84) (885) (0.93) +0.09
Connection Road)
–northbound
before Pearsons
Road
Elm Street 950 718 0.76 1,162 1.22 1,246 1.31 +0.09
(Cooroy (495) (0.52) (801) (0.84) (838) (0.88) +0.04
Connection Road)
– southbound after
Pearsons Road
Elm Street 950 427 0.45 691 0.73 728 0.77 +0.04
(Cooroy (467) (0.49) (756) (0.80) (840) (0.88) (+0.08)
Connection Road)
– northbound after
Diamond Street
Elm Street 950 828 0.87 1,340 1.41 1,424 1.50 +0.09
(Cooroy (638) (0.67) (1,031) (1.09) (1,068) (1.12) (+0.03)
Connection Road)
– southbound
before Diamond
Street
Pearsons Road – 300 37 0.12 60 0.20 84 0.28 +0.08
eastbound before (38) (0.13) (62) (+0.21) (117) (0.39) (+0.18)
Trading Post Road
Pearsons Road – 300 65 0.22 105 0.35 160 0.53 +0.18
westbound after (28) (0.09) (45) (0.15) (69) (0.23) (+0.08)
Trading Post Road
Note: AM peak values are not in brackets, PM peak values are in brackets
3.4 REFUSE COLLECTION
Within the retirement community, the proposed network of internal roadways are considered to provide appropriate
access for refuse collection services. The roads within the site are all 6.0m wide carriageways minimum. The standard
width of a Refuse Collection Vehicle (RCV) is 2.5m. Therefore it is considered that the internal road network provides an
adequate level of access for a refuse vehicle. Refuse collection is anticipated to occur infrequently, eg: once a week.
B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.