                                      12 October 2020
                            General Committee Agenda
                                Item 10 - Attachment 1




Investigation into complaints about the
introduction of new flight paths in
Sunshine Coast (April 2020)
Log in to download the original file

2020-10-12 GC Agenda - Item 9 - Attachment 1 - Aircraft Noise Ombudsman Report - Investigation(PDF, 689KB).pdf · 705 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 33 sections

Section 2

This page is intentionally blank

This page is intentionally blank

Section 3

Table of Contents
      1     Executive Summary ................................................................................................. 1
            Introduction .............................................................................................................. 1
            Community engagement .......................................................................................... 1
            Conclusions ............................................................................................................. 2
            Recommendations ................................................................................................... 2
      2     Introduction .............................................................................................................. 4
            Methodology ............................................................................................................ 4
      3     Consultation by Airservices – legislation, policy and procedural documents ............ 5
            Legislation and legislative instruments ..................................................................... 5
            Airservices’ public policies ....................................................................................... 6
            Airservices’ internal procedures ............................................................................... 7
      4     The development of flight paths at Sunshine Coast ................................................. 9
            Background ............................................................................................................. 9
            Airservices’ flight path design work ........................................................................ 10
            Targeted Environment Impact Assessment (TEIA) ................................................ 10
      5     Community Consultation ........................................................................................ 12
            Joint Stakeholder Communication and Engagement Plan...................................... 12
            Airservices’ Stakeholder Engagement Plan ........................................................... 12
      6     Preparation for consultation ................................................................................... 15
            Newspaper advertisements ................................................................................... 15
            Letters to schools and other sensitive sites ............................................................ 16
            Contact with known community groups .................................................................. 16
            Emails to existing contacts within complaints database ......................................... 16
            Mailout ................................................................................................................... 16
            Airservices web-based information about its consultation ...................................... 17
      7     Consultation in practice ......................................................................................... 18
            Website information ............................................................................................... 18
            Face-to-face consultation sessions ........................................................................ 19
            Summaries of feedback ......................................................................................... 21
            Stakeholder Round Table ...................................................................................... 22
            Airservices’ proposed final design.......................................................................... 23
            The ‘Engage Airservices’ platform ......................................................................... 23
            Further representations ......................................................................................... 25
      8     Complaints about the process................................................................................ 26
      9     Conclusions ........................................................................................................... 27
      10 Recommendations ................................................................................................. 30


Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)                        Page i

Section 4

1 Executive Summary
Introduction
From 22 April to the end of July 2019, the Aircraft Noise Ombudsman (ANO)
received 299 complaints regarding the proposed flight paths to support a new runway
at Sunshine Coast Airport in May 2020.
The proposed new runway was the subject of an environmental impact statement
(EIS) and associated community consultation conducted in 2014/15 by Sunshine
Coast Council. At that time, Airservices Australia (Airservices) agreed with the
concept flight paths, developed by a private consultant and included in the EIS, but
took no part in the community consultation.
In April 2018, Airservices commenced detailed design work on the new flight paths,
seeking to maintain alignment with the EIS, except where it identified variations that
could reduce noise impacts in some communities to the north-west. Airservices
engaged a consultant to conduct a Targeted Environmental Impact Assessment
(TEIA) of its proposed flight path design. The TEIA recommended implementation of
a community engagement plan that covered all areas predicted to experience future
aircraft noise and gave residents an opportunity to raise concerns.

Community engagement
Airservices determined that it achieved this recommendation through reliance on the
broader community update program being undertaken by the Sunshine Coast Airport
Expansion Project along with its own targeted consultation only with those areas
where its proposed flight paths varied from the concept flight paths in the EIS. There
was no assessment by Airservices of the adequacy of the EIS community
consultations in 2014/15 nor any consideration of population churn or other factors
that may have changed in the community since the earlier consultation.
Airservices’ consultation occurred during a six week period in March/April 2019.
Airservices took responsibility for consultation in areas where the proposed flight
paths deviated from those proposed in the 2014/15 EIS (the target area) and
provided technical support for Sunshine Coast Council which was responsible for a
community update program with the other affected areas (the general area).
The community engagement did not go smoothly, with community awareness of the
flight path proposals and consultation sessions heavily reliant on community
members using their social media and own letterbox drops to reach interested
individuals. Airservices’ early notice of the consultation period had suggested that the
community in all affected areas would be consulted. Some two weeks into the
consultation period, it became more specific that it was only consulting communities
in the target area. This division of responsibilities between Airservices and the
Sunshine Coast Council caused general public confusion about who was responsible
for what. Airservices underestimated the extent of public interest and had to schedule
multiple consultation sessions in groups limited to 50, due to the size of the venues it
had hired. Complaints to the ANO reported no notice or lack of timely notice of
meetings, inconsistent responses between Airservices and Sunshine Coast Council
representatives and lack of clarity about who had responsibility for decisions.



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 1

Section 5

Airservices collated and analysed the feedback received from all areas of the
community about the flight path designs, and undertook some additional briefings
and community updates with affected communities in the general areas after the
feedback period closed. Complaints by residents to Airservices about the process
were not responded to until well after the closure of the consultation period.
Airservices acknowledges that responses to complaints were not completed in a
timely manner, and advised the ANO that community submissions were first
analysed for feedback that could help shape the final flight path designs to ensure
that insights were provided to the flight path design team in a timely manner. When it
finally responded to complaints made about the process, Airservices described its
consultations as “successful”, which served to further anger complainants to the
ANO.

Conclusions
Airservices has a responsibility to engage with the community on the environmental
impact of aircraft operations. Although it did not evaluate or assess the community
engagement process under the EIS in 2014/15, Airservices relied on it to decide that
it had no responsibility to consult any further with residents in the general area in
2019. These areas would be captured by a community update program being
undertaken by the Sunshine Coast Airport Expansion Project. The consultation
process itself was not well communicated and caused public confusion about the
relative responsibilities of Airservices and the Sunshine Coast Council. This persisted
throughout the consultation period and after.
While Airservices was drawn into considering submissions from the general area by
the sheer volume of response, it became clear to those making submissions that they
had little chance of influencing the outcome. The predictable result was the
community outrage expressed in the complaints to the ANO.

Recommendations
Where Airservices proposes flight paths required by an airport (or other third party)
development, it needs to be involved early in the planning process and to clearly
specify its role and the terms on which its responsibility to engage with the
community on changes to aircraft operations will be managed.

                                    Airservices should develop a framework for third party
                                    proposed changes that:
                                    (a) provides robust and dependable governance
                                        arrangements to manage its early and ongoing
                                        engagement with third parties
                                    (b) establishes clear lines of accountability and documents
                                        these arrangements as they evolve
                                    (c) ensures an effective consultative process, which includes
                                        monitoring the adequacy of any third party consultations
                                        being relied on.
At the Sunshine Coast, Airservices can use its post-implementation review process
to re-engage with communities and consider community-suggested alternatives to
the flight paths that will be introduced in support of the new runway.


Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 2

Section 6

                                    Airservices should, as soon as practicable, design an
                                    effective post-implementation review (PIR) process for the
                                    Sunshine Coast flight path designs, that does not perpetuate
                                    design constraints requiring alignment with EIS concepts,
                                    and which encompasses:
                                    (a) consideration of identified community-suggested
                                        alternatives
                                    (b) a community engagement process that provides for
                                        genuine opportunities for community contributions to
                                        influence decisions
                                    (c) application of the latest version of Airservices’ National
                                        Operating Standard (NOS) Environmental Management
                                        of Changes to Aircraft Operations (AA-NOS-ENV-2.100).




Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 3

Section 7

2 Introduction
2.1       On 22 April 2019, the ANO received the first complaint from a Sunshine Coast
          resident about Airservices’ community engagement and provision of
          information in connection with proposed flight path changes at Sunshine Coast
          Airport consequent to the planned new runway. Over the next 30 days, the
          ANO received a total of 274 complaints about issues associated with the
          proposed changes and the consultation process undertaken by Airservices. In
          total the ANO received 299 complaints to the end of July 2019.

2.2       On 30 May 2019, the ANO decided to commence a multiple complaints
          investigation into flight path changes at Sunshine Coast and advised the
          Airservices Board accordingly.

Methodology

2.3       In developing this report, the ANO:

               considered each of the complaints received and any subsequent
                information, insights and observations provided by complainants
               reviewed all of the material Airservices made available to the community
               requested specific information and answers to questions arising from
                complaints or from the ANO’s review of Airservices’ material and carefully
                considered the information and answers provided in response
               conducted independent research and monitored discussions of the issues
                in the media and on some social media platforms
               met with affected residents, councillors and various staff of Airservices,
                and observed a Stakeholder Round Table.




Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 4

Section 8

3 Consultation by Airservices – legislation, policy and
  procedural documents
Legislation and legislative instruments

3.1       One of the functions of Airservices under section 8 (1)(d) of the Air Services
          Act 1995 (Cth) is “carrying out activities to protect the environment from the
          effects [and associated effects] of the operation of” aircraft.

3.2       Section 9 makes it clear that, in carrying out its activities, Airservices must
          regard safety “as the most important consideration” and, subject to safety,
          “must perform its functions in a manner that ensures that, as far as
          practicable, the environment is protected from the effects [and associated
          affects] of the operation and use of aircraft.”

3.3       Section 10 entitled “AA must consult and co-operate” requires Airservices to
          consult, in the performance of its functions, with a number of relevant
          government and industry bodies. Persons affected by aircraft operations are
          not specified although “consumer and other relevant bodies” are.

3.4       Section 16 empowers the Minister to give written directions to Airservices, with
          which it “must comply”. Ministerial Direction M37/99 requires Airservices to
          carry out the following activities:

                  … (ii) Provide advice, information and data on environmental aspects of air traffic
                  management including aircraft movements, aircraft noise, aircraft engine emissions and
                  aircraft operations.

                  (iii) Initiate and participate in discussions, consultations, studies and research with the
                  aviation industry and the community in relation to environmental aspects of air traffic
                  management.

                  …(vi) Provide advice and information on aircraft environment related matters to, and
                  participate in, airport consultative committees at those Australian airports that have such
                  a committee.

                  …(xii) Provide advice, information, guidance and assistance at locations outside
                  controlled airspace on environmental aspects of aircraft operations, movements and
                  procedures to the Department, the aviation industry and the community.

3.5       Under section 17 of the Air Services Act 1995, the Minister issued a notice to
          Airservices known as the Statement of Expectations for Airservices Australia
          for the Period 22 May 2017 to 30 June 2019, which included:

                  4. Stakeholder Engagement
                  I expect that in performing its functions Airservices will:

                  (a) undertake effective and ongoing engagement with the community, industry and
                  Government on the development and implementation of significant changes by
                  Airservices to air traffic and ARFFS;

                  (b) engage constructively in processes where it can provide information, assistance or
                  advice for policy formulation, implementation and regulation undertaken by Government
                  agencies, both within and outside my portfolio;



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 5

Section 9

                  (c) contribute to a coordinated approach to airport planning including appropriate
                  participation in, and providing information to, planning coordination forums, community
                  aviation consultation groups, and the National Airports Safeguarding Advisory Group;

          and the Expectations for the period 15 July 2019 to 30 June 2021 were:

                  4. Stakeholder Engagement
                  I expect Airservices will continue to:

                  a) undertake effective and productive engagement with the community and industry
                  based on mutual understanding and respect.

                  b) communicate clearly and regularly with my Department and CASA, industry and the
                  community on the development and implementation of significant changes to air
                  navigation and ARFFS.

                  c) proactively provide information, assistance and advice to Government agencies for
                  policy formulation, implementation activities and regulation purposes.

                  d) contribute in the coordinated approach to airport planning including appropriate
                  participation in planning coordination forums, community aviation consultation groups,
                  and the National Airports Safeguarding Advisory Group.

Airservices’ public policies

3.6       Airservices Commitment to Aircraft Noise Management1 states that:

                  Safety is our number one priority, but we recognise that aircraft noise, a by-product of a
                  growing economy, is the most significant cause of adverse community reaction to
                  increased aviation operators. Our long-term goal is to minimise, and where possible
                  reduce, the impact of aircraft noise. This includes collaboration and consultation with
                  the community and aviation industry on proposed air traffic changes as well as working
                  with them to explore and employ smarter operating solutions.

                  We recognise the importance of proactive community engagement and public
                  participation when managing noise related issues.

                  To ensure this we will:
                   provide clear, timely and accessible information to the community on current aircraft
                    noise, future aircraft noise and aircraft operations
                   engage openly and constructively with the community, and consult in a timely
                    manner on aircraft noise and changes to the air traffic management (ATM) system
                    that impacts the community
                   actively investigate changes which deliver improved noise outcomes, including
                    review of ATM procedures
                   ensure transparency in our processes and actions which impact the community
3.7       Airservices’ Communications and Consultation Protocol2, says:

                  We are committed to providing information to stakeholders and the community on
                  significant changes that may affect them, and to incorporating stakeholder feedback into
                  our planning, decision-making and implementation processes.




1 Airservices Australia, Airservices Commitment to Aircraft Noise Management, November 2013, p. 5-6

2 Airservices Australia, Communications and Consultation Protocol, 4 July 2016, p.3-6



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 6

Section 10

                  …

                  Airservices is committed to open and timely communication and consultation. We
                  engage with the community in relation to a range of issues:

                   services (air traffic control and aviation rescue and fire fighting)
                   flight path changes, particularly if residents are newly overflown
                   airspace design
                   our infrastructure projects
                   managing and responding to safety and environmental issues.
                  According to the level of change and likely impact, different forms of communication and
                  consultation activities can be used. Airservices seeks to provide the community and
                  stakeholders with the opportunity to learn and understand how a change may impact
                  them, why it is necessary and to provide an opportunity for feedback, where practicable.

                  We commit to:
                   listening to the community and stakeholders
                   acknowledging and considering feedback (noting that some changes are required for
                    safety considerations)
                   communicating decisions and the reasons for them.

Airservices’ internal procedures

3.8       Airservices’ National Operating Standard (NOS) Environmental Management
          of Changes to Aircraft Operations (AA-NOS-ENV-2.100)3 specified that:

                  All proposed changes to Airservices’ air traffic management practices that may affect
                  aircraft operations shall:
                  1. Be assessed for environmental impact prior to implementation;

                  2. Undergo stakeholder engagement planning [SEP] and stakeholder consultation prior
                  to implementation where potential community or environmental impacts are identified;

                  3. Be reassessed prior to implementation, if the proposal has already been impact
                  assessed in accordance with this NOS and:
                    a. has subsequently been modified or;

                    b. over 18 months has elapsed since the initial assessment process;

                  4. Be undertaken in accordance with this National Operating Standard (NOS) and
                  subordinate procedures;

                  5. Seek to achieve a noise outcome which balances the needs of the community and
                  aviation industry stakeholders.

3.9       The NOS also stated:

                7. Community consultation under the SEP shall:



3 Airservices Australia, Environmental Management of Changes to Aircraft Operations (AA-NOS-ENV-2.100)

(NOS), Version 13: Effective 7 August 2018, p. 5
Note: Unless otherwise specified, in this report reference to the NOS means Version 13 of the NOS.

Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 7

Section 11

                      a. Be targeted to all areas potentially affected by the change;

                      b. Provide justification for the change, explicitly describing how any potentially
                         negative impacts are balanced by benefits, and on what basis the chosen
                         approach is optimal compared to viable alternatives;

                      c. Describe timeframes for implementation, specific proposed flight paths, and likely
                         noise levels and associated impacts;

                      d. Consider the social, economic and cultural context of the communities being
                         consulted to ensure genuine engagement and accessibility of information.

                8. The community shall receive all relevant information relating to a change proposal
                   within a reasonable timeframe, to provide them with the opportunity to effectively give
                   feedback prior to implementation.4




4 ibid, p. 16



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 8

Section 12

4 The development of flight paths at Sunshine Coast
Background

4.1       Sunshine Coast Airport, which is owned by Sunshine Coast Council and
          operated by Palisade Investment Partners, planned to implement a new
          runway in May 2020 as part of its Sunshine Coast Airport Expansion Project
          (SCAEP)5.

4.2       On 31 January 2011, the project was referred by the Sunshine Coast Council
          to the Commonwealth Minister for the Environment as part of the approval
          process. Separately, on 6 September 2011, Airservices and the Civil Aviation
          Safety Authority (CASA) advised the Minister that the project would require the
          development of new flight paths and requested advice on the requirements
          and criteria for an environmental assessment.

4.3       On 21 May 2012, a delegate of the Minister for the Environment decided that
          the proposal, including airspace management, would be assessed by an
          environmental impact statement (EIS) conducted by the Sunshine Coast
          Council.

4.4       The EIS and the community consultation was based on concept flight path
          designs developed by a private sector designer. The designer’s Airspace
          Design Concepts Report6 of September 2012 noted that:

                  Four consultation meetings were held with Airservices Brisbane Centre staff from June
                  to August 2012 to further assess the suitability… and agree on the basic flight path
                  corridors…7

4.5       In providing its agreement in a letter from Airservices’ Aviation Relations
          Manager to Sunshine Coast Airports’ Planning and Major Projects Manager on
          23 October 2012, Airservices advised that:

                  Airservices recognises that ongoing community engagement associated with the
                  introduction of these projected flight corridors will be required and advise that
                  Airservices is willing to provide relevant support for this engagement where appropriate.

4.6       The Sunshine Coast Council conducted public consultation on its EIS from 29
          September 2014 to 13 November 2014. On 18 February 2015, additional
          information for the EIS was requested by the Queensland Coordinator-General
          and as a result a further public consultation process was carried out from 2
          November 2015 to 30 November 2015. Airservices had no involvement in
          either consultation process.




5 See: https://www.sunshinecoast.qld.gov.au/Council/Planning-and-Projects/Major-Regional-Projects/Sunshine-

Coast-Airport-Expansion-Project
6 Leading Edge Aviation Planning Professionals (L.E.A.P.P), Sunshine Coast Airport Airspace Design Concepts

Report, issued 28 September 2012
7 ibid, p. 1



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 9

Section 13

4.7       On the basis of the EIS and additional information provided by the Sunshine
          Coast Council, the Minister for Environment approved the project on 18 July
          2016. A delegate for the Minister for Environment advised Airservices in a
          letter dated 28 June 2016 that:

                  The EIS indicates that whilst some dwellings may be newly exposed or experience an
                  increase of aircraft noise, on balance there will be an overall reduction of dwellings
                  experiencing varying degrees of aircraft noise. On this basis, the Civil Aviation Safety
                  Authority and or Airservices Australia should give the relevant authorisation(s) should
                  they be engaged to do so or as they are required to do so.

                  In giving any authorisation, consideration should be given as to whether the
                  authorisation would result in changes to the Australian Noise Exposure Concept
                  (ANEC) or the Australian Noise Exposure Forecast (ANEF) contours (as applicable),
                  and or to the N70 contours compared to those presented in the EIS.

                  In particular, there should not be a significant increase in the extent and distribution of
                  the ANEC / ANEF contours in so much as it would potentially impact the health, safety,
                  welfare or quality of life of people and communities. There should also not be a
                  significant increase in the extent and distribution of N70 contours in so much as it would
                  potentially impact the health, safety, welfare or quality of life of people and communities.
                  This is to ensure that people and communities in the vicinity of the airport are not
                  exposed to aircraft noise patterns that are significantly different to those presented and
                  consulted on during the assessment process.

Airservices’ flight path design work

4.8       Airservices proposed to introduce flight paths for the new runway at Sunshine
          Coast Airport, known as Runway 13/31, planned to be operational in 2020.
          Airservices began its flight path design work in late 2017 when approached by
          the Sunshine Coast Council. Detailed design work commenced in April 2018.

4.9       In determining the flight paths, Airservices set out to align its designs as
          closely as possible to the concept flight paths defined in the EIS. While
          seeking to align with the concept flight paths, Airservices did identify some
          variations that it considered would deliver environmental benefits.

Targeted Environment Impact Assessment (TEIA)

4.10 Airservices engaged GHD, a professional services firm, to undertake a
     Targeted Environmental Impact Assessment (TEIA V1)8, in accordance with
     Airservices’ own methodology as described in its NOS9. This assessed
     Airservices’ proposed flight path design, which it would take to the community
     and other stakeholders for consultation and which would inform Airservices’
     Stakeholder Engagement Plan (SEP).

4.11 The Executive Summary in GHD’s TEIA concluded that:
                  The findings of this targeted EIA are considered generally consistent with the findings of
                  the EIS as would be expected given the similarity of the proposed flight paths. Minor
                  discrepancies between the results documented in the targeted EIA and the EIS were


8 GHD, Airservices Australia Proposed change to flight paths at Sunshine Coast Airport Targeted environmental

impact assessment March 2019, Version 1: Effective 25 February 2019 (TEIA V1)
9 Airservices Australia, NOS, op. cit



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 10

Section 14

                  considered to be mainly attributable to updated model inputs to better reflect current
                  airport operating conditions.

                  In consideration of the limited environmental impact predicted against AA-NOS-ENV-
                  2.100, in combination with the general consistency with findings of the EIS, it is not
                  considered likely for the proposed change to result in a significant increase in impact to
                  the health, safety, welfare or quality of life of people and communities. It is therefore
                  considered that the proposed change does not warrant further referral under the
                  Environment Protection and Biodiversity Conservation Act 1999.

                  It is nonetheless recommended that a community engagement plan be implemented
                  that encompasses the areas predicted to experience aircraft noise and informs
                  residents of the proposed change and provides an opportunity to raise concerns. 10




10 GHD, TEIA V1, op. cit



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 11

Section 15

5 Community Consultation
Joint Stakeholder Communication and Engagement Plan

5.1       In the case of the Sunshine Coast, leaving aside the EIS processes in
          2014/15, community engagement about the proposed airspace and flight path
          changes was undertaken jointly by Airservices, Sunshine Coast Airport and
          Sunshine Coast Council.

5.2       The arrangements for the period of public engagement (20 March to 30 April
          2019) were documented in a joint Stakeholder Communication and
          Engagement Plan (SCEP)11.

5.3       The SCEP noted in its introduction that:

                  Airservices must meet a regulatory obligation to show evidence that affected
                  communities were engaged with how the designs would impact them.12

          and defined Airservices’ engagement responsibility as:

                  Release of updated information:
                   Flight paths
                   Airspace design
                   Impact on communities (what will I see and hear?)13

Airservices’ Stakeholder Engagement Plan

5.4       Separately, and as required by its NOS14, Airservices had prepared its own
          internal Stakeholder Engagement Plan (SEP)15. Version 1.0 of the SEP was
          approved on 17 March 2019 by the Acting Executive General Manager, Air
          Navigation Services, with the following caveat, among others:
                  The SEP also provides limited social, economic and cultural context of the communities
                  being consulted to ensure genuine engagement and accessibility of information,
                  however this will be addressed in future versions and other planning products. 16




11 SCAEP Stakeholder Engagement Working Group (SEWG) (comprising Sunshine Coast Council Airport

Expansion Project Team (SCC), Airservices Australia and Sunshine Coast Airport (SCA) Pty Ltd), Airspace change
and flight path design for Sunshine Coast Airport RWY 13/31 Stakeholder Communication and Engagement Plan
20 March – 30 April 2019 (SCEP), Version 5: WEDNESDAY 13/3/19 4.30pm
12 ibid, p. 3

13 ibid, p. 12

14 Airservices Australia, NOS, op. cit

15 Airservices Australia, Stakeholder Engagement Plan, Sunshine Coast Airport Airspace Changes, Runway 13/31

(SEP), Version 1.0: Effective 17 March 2019 (SEP V1)
16 ibid, p. 1



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 12

Section 16

5.5       Version 2.0 of Airservices’ SEP17 was approved effective 25 March 2019, five
          days into the six week community engagement consultation period. It was
          largely unchanged from Version 1.0 and included a detailed Suburb Analysis.

5.6       The SEP’s Executive Summary said:

                  Airservices will undertake consultation with impacted communities and industry
                  stakeholders to inform the final airspace and flight path design. 18

          and stated its scope as follows:

                  The scope of this Stakeholder Engagement Plan (SEP) is limited to stakeholder
                  consultation activities required for the reconfiguration of airspace and flight path
                  changes as they differ from what is depicted in the EIS to what Airservices is proposing
                  at the Sunshine Coast Airport to support the operation of RWY 13/31.19

5.7       Airservices described its consultation approach in the SEP as follows:
                  SCC and SCA are facilitating engagement activities aimed to inform and update the
                  community on the development and implementation of Runway 13/31.

                  Airservices will undertake specific engagement and consultation activities with
                  communities effected (sic) by the proposed changes to flight paths that differ from those
                  depicted in the EIS.

5.8       In effect, Airservices’ consultation would be targeted to those areas which
          were not considered under the EIS, with those communities that would be
          affected by the flight paths that remained consistent with the EIS to be
          captured by the SCC and SCA community update program.

5.9       The community update program is described in the Stakeholder
          Communication and Engagement Plan (SCEP)20 as to be “run co-jointly
          between the three principal parties: Airservices Australia, Sunshine Coast
          Council and Sunshine Coast Airport Pty Ltd”21. Its aim is described as:
                  To deliver a jointly managed stakeholder engagement project to advise government,
                  industry and communities of the airspace change and flight path designs for the new
                  runway at the Sunshine Coast Airport 22

5.10 Airservices’ SEP made no assessment of the adequacy of the EIS
     consultations by Sunshine Coast in 2014/15 as a basis for this consultative
     approach. There was no analysis of the potentially changed composition of the
     community or the impact that the passage of so many years might have on
     community awareness of, comfort with or acceptance of the changes.


17 Airservices Australia, Stakeholder Engagement Plan, Sunshine Coast Airport Airspace Changes, Runway 13/31

(SEP), Version 2.0: Effective 25 March 2019 (SEP V2)
Note: Unless otherwise specified, in this report reference to the SEP means Version 2.0 of the SEP.
18 ibid, p. 4

19 ibid, p. 5

20 SCAEP Stakeholder Engagement Working Group (SEWG), op. cit

21 ibid, p. 11

22 ibid, p.3



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 13

Section 17

5.11 Noosa Council advised the ANO that the Noosa population had changed
     significantly in the preceding five years:

                  Council has tracked our population turnover for at least twenty years using two different
                  information sources – ABS census statistics and electoral rolls. Both have produced
                  statistically consistent results in terms of our population churn in Noosa - approximately
                  10% per year. This means that for every four years, there is approximately 40%
                  population churn rising to 50% every five years.

5.12 The SEP included a map and specified its targeted consultation area in detail:

                  Airservices will provide on-site community specific consultation with communities to the
                  north-west of the airport, where the proposed design varies from the original design
                  concept. This consultation will be in addition to supporting the Sunshine Coast Council
                  led engagements.

                  Communities to the north-west where increased overflights associated with proposed
                  flight paths compared to the EIS include Cooroy Mountain, Cooran, Pomona, Doonan,
                  Pinbarren, Traveston, Cootharaba and Verrierdale. 23




23 ibid, p. 9



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 14

Section 18

6 Preparation for consultation
Newspaper advertisements

6.1       A week into the consultation period, Airservices placed a public notice in six
          local papers:
               Sunshine Coast Daily (27 March 2019)
               Buderim Chronicle (28 March 2019)
               Caloundra Weekly (28 March 2019)
               Nambour Weekly (28 March 2019)
               Coolum Advertiser (28 March 2019)
               Coolum North Shore News (29 March 2019).
6.2       These notices were placed in the classifieds section of the papers in all but
          one instance. This placement is unlikely to have come to many readers’
          attention.

6.3       The newspapers selected serve audiences in locations largely outside the
          area Airservices was intending to target with its consultations. Those
          newspapers that best served the target area were the Noosa News, Noosa
          Today, Cooroy Rag and the Eumundi Green, none of which were used by
          Airservices to advertise its consultation. The Sunshine Coast Council
          advertised the drop-in consultation sessions and information kiosks it was
          running in areas outside the target areas in these publications, excepting in
          the Cooroy Rag.

6.4       One complainant, who resides in the target area, complained after the
          consultation period closed:

                  Back in March-April during the consultation period, the general public were not even
                  aware of the of the Targeted Area’s existence. Ideally in the future, this map [the map
                  included in subsequent Airservices reports showing the consultation areas] should be
                  included in meeting notices, in letterbox drops and all newspapers serving the Target
                  Area, so people might at least be aware of all the changes proposed and how they
                  differ from earlier designs. [emphasis in original]

                  The Cooroy Rag is the only newspaper based within ASA’s circled Target Area.

                  I have searched March-April back-editions of both Noosa Today and Cooroy Rag for all
                  advertisements placed in these papers, by ASA and Sunshine Coast Council (SCC).
                  There were no advertisements in these local newspapers before ASA’s community
                  consultation meetings in Cooroy, Pomona or Cooran.

6.5       This complainant also pointed out that:

                  The SCC did place a notice in Noosa Today on 14 March in advance of 5 coastal
                  meetings from Noosaville to Maroochydore, only for venues outside the circled target
                  area. Cooroibah, Tinbeerwah and other residents in the eastern hinterland, may have
                  chosen to attend the nearby Noosaville meeting. Therefore, they would have been
                  aware of the changes in sufficient time to allow them to make submissions. However, to
                  the west, notices in advance of any meetings inside the hinterland Target Area never
                  appeared. Consequently, most hinterlanders could quite rightly assume no
                  notices for meetings in the area, meant no changes in the area. [emphasis in
                  original]


Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 15

Section 19

6.6       The only advertisement placed by SCC in the Cooroy Rag appeared on 24
          April 2019, on page 31 of the paper, when just one week of the consultation
          period remained and after all on-site consultations sessions had been
          completed. It made no reference to the new flight paths being over particular
          suburbs, or that these were any different to those proposed in the concept
          designs included in the EIS.

Letters to schools and other sensitive sites

6.7       The SEP listed a number of schools, hospitals and care facilities, which would
          receive communication from Airservices about the proposed airspace change.
          Most of these sites were outside the areas targeted by Airservices for
          consultation, but were mostly those identified in the TEIA as being within
          certain noise contours before opening and/or after opening scenarios.

Contact with known community groups

6.8       Airservices relied on the SCAEP contacting community groups and arranging
          a briefing session to be held during the consultation period. Despite a long list
          of invitees, only three community groups (Residents for Responsible
          Development, Mudjimba Residents Association, Twin Waters West and
          Surrounds) attended the session held at the Maroochy RSL, Maroochydore.
          Invitations were sent by email to community group email addresses at 4.30pm
          on the Friday before the scheduled briefing at 2-4pm on Wednesday 20
          March.

Emails to existing contacts within complaints database

6.9       Airservices contacted those individuals with an email address who had been
          registered in its complaints database; i.e. those who had submitted a
          complaint in relation to Sunshine Coast Airport in the period 1 January 2016 to
          20 March 2019. Emails were sent to 183 individuals. Only five individuals
          within the suburbs Airservices was targeting with its consultation were
          contacted.

Mailout

6.10 The SCAEP undertook a mail-out to approximately 45,000 households on 13
     March 2019 advising of the consultation period and the upcoming consultation
     sessions that were led by Sunshine Coast Council. Many complainants
     reported not receiving this ‘To the Householder’ letter at all or received it too
     late to make arrangements to attend the scheduled sessions.

6.11 A resident from within the target area advised:

                  We were not aware of any proposed flight path changes, consultation meetings, or the
                  “6-week” submission period. Like many other households in Noosa Shire, we found out
                  about the changes, long after submissions had closed.
                   No notices from ASA or Sunshine Coast Council/Airport arrived in our letterbox.
                   A post on Facebook by Noosa Shire Council is insufficient, not everyone uses
                    Facebook.
                   Strangely, no notices or advertisements appeared in our local newspapers, Noosa
                    News, Cooroy Rag or Noosa Today, which cover the target area

Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 16

Section 20

Airservices web-based information about its consultation

6.12 On 13 March 2019, a week before the consultation process, Airservices
     posted the first of its relevant notices on its website which included:

                  Sunshine Coast Council, Sunshine Coast Airport and Airservices are committed to open
                  and timely communication and engagement with all stakeholders who may be affected
                  by the changes associated with the new airspace architecture required for RWY 13/31.

                  From late March 2019, Sunshine Coast communities will be invited to participate in a six
                  week engagement program on the proposed flight paths and airspace changes.

                  This follows previous community consultation conducted by the Sunshine Coast Airport
                  in 2014 for the Environmental Impact Statement (EIS) required for the Sunshine Coast
                  Airport Expansion Project.




Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 17

Section 21

7 Consultation in practice
Website information

7.1       Airservices used its website as a mechanism for communicating publicly about
          its proposed flight path changes. This was an effective tool for
          communications, which was updated regularly and provided a range of
          relevant information and resources, including general and community specific
          Fact Sheets and Frequently Asked Questions during the consultation period.

7.2       The 20 March update included a copy of the Fact Sheet titled “Sunshine Coast
          Airport Proposed Airspace Change Runway 13-31”, which identified that:

                  In 2014, Sunshine Coast Council consulted with the community on early design
                  concepts, which included an Environmental Impact Statement approved by the State
                  Government. To support operation of Runway 13/31 in 2020, Airservices proposed
                  design has been modelled on the flight path design concept in the Environmental
                  Impact Statement.

                  To improve environmental impacts, Airservices proposed flight path design variations
                  from the design concept.

        However, there was no reference in any material at this time that the
        consultation was limited to only these variations or clear advice that the new
        flight path design was necessarily constrained by the flight path design concept
        in the EIS. Indeed, the fact sheet said:
                  Airservices Australia is proposing airspace changes at Sunshine Coast Airport to
                  support the operation of a new runway, known as Runway 13/31, which will be
                  operational in 2020.

                  These proposed designs use modern technology and aircraft capability to be as safe
                  and efficient as possible. Wherever possible, changes to the flight paths that would
                  deliver safety enhancements have been identified and these have been balanced with
                  minimising the effects of aircraft noise on the community, as far as practical.

                  Airservices is seeking feedback on the proposed flight path design to be considered as
                  part of the final airspace design.

7.3       On 4 April, Airservices released a “Frequently Asked Questions” document
          which it committed to updating:

                  …as we progress consultation on the proposed airspace and flight path changes to
                  support operation of Runway 13/31 at the Sunshine Coast Airport

7.4       On 8 April, Airservices announced on its website the commencement of its
          series of four consultation drop-in sessions and at the same time was specific
          about the limited scope of the consultation. Almost mid-way through the
          consultation period, this announcement was the first public indication that
          Airservices’ consultation would be limited to the target area:
                  Airservices has designed proposed airspace and flight paths to support operation of the
                  new runway and these are modelled on the flight path design concept in the
                  Environmental Impact Statement. These designs include variations to improve
                  environmental impacts. Airservices is consulting on the variations to the flight paths
                  from the approved Environmental Impact Statement.

Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 18

Section 22

                  Airservices role is to consult with communities where the flight paths differ from the
                  flight paths in the Environmental Impact Statement, [emphasis added] and take
                  feedback on these variations.

7.5       Airservices continued to use its website after the consultation period closed to
          update the public. This included the feedback reports, how it used the
          feedback in determining a final design, the updated TEIA for the final design
          and useful representations of timelines and the potential impacts of the final
          design.

Face-to-face consultation sessions

7.6       Airservices scheduled four on-site community drop-in sessions in locations
          identified as relevant to communities within its target area. It also made staff
          (including senior flight path designers and senior air traffic controllers)
          available to provide technical support to consultations undertaken by the
          SCAEP team that had the stated purpose of updating the community about
          general progress of the expansion project, including the proposed airspace
          and flight paths.

7.7       Complaints to the ANO were critical of the conduct of the sessions, referring to
          issues including:

               No notification or a lack of timely notification about the sessions
               Inconsistency in response and information provided by Airservices and
                SCA/SCC staff
               Lack of access to technical noise specialists
               Lack of clarity about who had responsibility for decisions
               The ‘drop in’ session format meant it was difficult to obtain information
               Airservices representatives appeared unprepared for the number of
                attendees and the level of concern being expressed.
7.8       For example, a Yandina Creek resident said:

                  …residents in [my street] were not supplied with information regarding the proposed
                  changes or information specific to this area. It was only after specific enquiries of the
                  relevant authorities that such information was made available in the past week [writing
                  on 29 April]. This is unacceptably close to the dead line for submission of objections.

7.9       Complainants raised concerns about a lack of access to technical noise
          specialists. For example:

                  A common question at the community consultation sessions was, ’What about the
                  noise?’ and ‘How loud will it be?’ Representatives from both ASA and SCC did not have
                  the knowledge to adequately explain N60, N70, associated dB(A) levels, ANEC and
                  ANEF contours and the potential impacts on residents beneath the flight paths.

7.10 Complainants advised that these sessions did not help them access the
     necessary information:
                  Attendees felt that questions were not fully answered in a meaningful manner to assist
                  them with their decision making.


Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 19

Section 23

                  A response heard frequently to questions about flight path routes resulting noise
                  impacts was ‘It’s in all the EIS’. The EIS alone is a document of nearly 3000 pages.
                  Telling residents to go back and have a look through the EIS to find answers to their
                  questions or to verify what they were being told seems an inadequate response from
                  both council and ASA representatives. This is supported by media coverage of the
                  outrage after each meeting. In some cases, the consultant turned their back on the
                  attendee and walked away. This poorly run process for gaining quality information has
                  totally failed.

7.11 Complainants raised a lack of clarity around responsibilities at these sessions.
     There was concern about who could decide the flight paths and to what extent
     Airservices or the Sunshine Coast Council had the final say. One complainant
     reported:

                  At the Verrierdale ‘Drop In’ Airservices Australia stated they take the recommendation
                  from the Sunshine Coast Council on the flight paths and yet the Division 9 Councillor
                  stated it was an Airservices Australia decision. Others also received the same
                  information from Airservices and the Councillor, with one person trying to even have the
                  Councillor meet with Airservices.

7.12 Complainants also raised a lack of clarity about who could decide to extend
     the consultation period with Airservices staff unclear if it was their decision to
     make. One complainant reported that:

                  ASA told residents at the Coolum meeting that they should include a request for an
                  extension in their feedback and it would be considered. At the Verrierdale meeting the
                  following week ASA told residents that they would have to seek an extension from SCC.

                  It is our understanding that ASA is an independent Federal body and should therefore
                  be the decision maker in this scenario, however comments from SCC would suggest
                  otherwise. The question of authority and to whom residents should apply for an
                  extension of the community consultation period is still unresolved with 2 working days
                  left before feedback closes.

7.13 It appears that Airservices underestimated the level of public interest, but
     made a serious effort to allow for the later sessions to manage the larger
     numbers of interested residents arriving at venues designed for smaller
     groups. This included the measures added to Airservices’ website on 10 April:

                  We will be inviting small groups of up to 50 through each venue at one time, which may
                  take up to 30-40 minutes.

                  This will enable us to provide information and take feedback on the proposed flight path
                  designs.

                  At times, there may be a waiting period and we appreciate your patience.

                  If you would prefer to not wait, you can access information and Fact Sheets under the
                  resources tab below, or submit your feedback:

                   Online via https://feedback.emsbk.com/asa
                   By mail to: Feedback c/o Noise Complaints and Information Service, PO Box 211
                    Mascot NSW 1460
7.14 The consultation period concluded on 30 April 2019. Airservices reports that it
     received positive comments and feedback about the value of the on-site
     sessions


Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 20

Section 24

Summaries of feedback

7.15 On 1 May, Airservices updated its website to advise that:

                  We have received a significant number of submissions and responses, and will be
                  consolidating them for consideration in the final design.

                  A Summary of Feedback will be released on Airservices website in due course.

7.16 On 10 May Airservices further advised that:

                  Due to the high number of submissions and correspondence received, we are unable to
                  respond individually.

7.17 On 7 June 2019, Airservices published the following update on its website:

                  In response to our community consultation activities, conducted between 20 March and
                  30 April 2019, we received a considerable amount of feedback, both from the areas
                  where we consulted on the proposed flight path variations (‘consultation areas’), and
                  from the broader Sunshine Coast community, where the flight path designs are
                  consistent with the concept flight paths in the approved EIS.
                  As a result, we have decided to release summaries of this feedback, and our
                  consideration of the feedback in the context of the final design development, in three (3)
                  stages:

                   Summary of Feedback – Part One (Consultation Areas): Summarises the
                    feedback received from the communities in the specific areas where we consulted
                    on proposed flight path variations, and provides an analysis of the themes within this
                    feedback (released 7 June 2019).
                   Summary of Feedback – Part Two: Summarises the general feedback received
                    from communities in the broader Sunshine Coast area, including an analysis of the
                    themes within this feedback (release date by end of June 2019).
                   Consideration of Feedback: A summary report on how we have considered the
                    feedback provided by the Sunshine Coast communities in shaping the final flight
                    path designs (release date in early July 2019).


7.18 On the same date, it released Summary of Feedback – Part One (Consultation
     Areas)24. This report described the target area as encompassing a larger
     region that had been identified in the SEP, and included the following suburbs:

           Black Mountain                                Cooroy Mountain                               Pomona
           Cooroy                                        Pinbarren                                     Tewantin
           Lake Macdonald                                Ringtail Creek                                Tinbeerwah
           Ridgewood                                     Cooroibah
           Cooran                                        Doonan




24 Airservices Australia, Summary of Feedback Part 1: Sunshine Coast Proposed Airspace and Flight Path

Changes, 7 June 2019, p. 2

Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)          Page 21

Section 25

7.19 This report also included presentations of the feedback statistics which led to
     some confusion and concern being expressed by complainants. For example,
     Airservices treated one submission that raised five different complaints – e.g.
     flight paths, noise, emissions, environment and process – as five “resident
     submissions”. Of these five “resident submissions”, noise was counted as one
     of the five, or 20% of “resident submissions”.

7.20 Using this method, the report stated that noise accounted for 24% of “resident
     submissions”. However, 475 of the 917 people making submissions, or 51.8%,
     raised noise as a concern. After complaints were received about this,
     Airservices produced an updated version25 which essentially maintained the
     original analysis.

7.21 The Summary of Feedback – Part Two26 was released on 28 June 2019,
     summarising feedback from residents in the non-targeted or general areas.
     The report noted 2,915 unique submissions were received. Using the same
     analysis methodology as in Part One, it reported 35% raised flight paths, 17%
     noise and 13% concerns about the community consultation associated with
     the previous EIS.

7.22 While there were concerns raised about the way Airservices presented the
     feedback, as outlined above, it must be recognised that this was a new and
     developing process. It is clear that Airservices received a significant number of
     submissions and faced a challenging task to absorb and synthesise the
     substantial amount of feedback.

Stakeholder Round Table

7.23 On 5 July 2019, a Stakeholder Round Table was held, consisting of
     stakeholders from Sunshine Coast Council, Noosa Shire Council, Sunshine
     Coast Airport, Flight Path Forum Inc. and State and Federal Members of
     Parliament. Airservices reported that the purpose of the Round Table, among
     others was to:

                  Explore and discuss the Consideration of Feedback Report which includes the Final
                  Design prior to public release

7.24 The agenda for the Sunshine Coast Council Special Meeting of November
     201927, described the Stakeholder Round Table meeting as follows:

                  The purpose of the meeting was to provide a better understanding of the regulatory,
                  technical, operational and community feedback resulting from the Airspace Community
                  stakeholder engagement associated with the delivery of the new Runway.

7.25 The then ANO attended the Round Table session as an observer and noted:


25 Airservices Australia, Summary of Feedback Part 1: Sunshine Coast Proposed Airspace and Flight Path

Changes (updated), 28 June 2019
26 Airservices Australia, Summary of Feedback Part 1: Sunshine Coast Proposed Airspace and Flight Path

Changes, 28 June 2019
27 Sunshine Coast Council, Agenda Special Meeting (Region Shaping Projects), 14 November 2019, p. 10:

https://d1j8a4bqwzee3.cloudfront.net/~/media/Corporate/Documents/Meetings/November%202019/Minutes%20Sig
ned%20141119%20OM.pdf

Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 22

Section 26

               There was a significant media presence before the session
               The bulk of the session was devoted to presentations by Sunshine Coast
                Council and then by Airservices. Comparatively little time was left for
                questions or statements by community representatives or other
                participants
               While questions by community representatives and others were heard and
                responded to by Sunshine Coast Council and Airservices, it could not be
                said there was any substantial “discussion” nor any progress made to
                address the concerns of the community or to resolve outstanding issues
               No final design or Consideration of Feedback Report was available and so
                no final design nor any record of Airservices’ consideration of the feedback
                received could be addressed or discussed.

Airservices’ proposed final design

7.26      Airservices published its Proposed Final Design and Consideration of
          Feedback report on 16 July 2019, finalising its proposed flight path and
          airspace designs for implementation at the Sunshine Coast.

7.27      Alternatives proposed by communities during the consultation period were
          considered by Airservices. However, most were ruled out on the grounds that:
                  Alternative flight path designs submitted that were outside the approved EIS concept
                  flight paths were not able to be progressed at this time28

7.28 However, Airservices did consider nine alternative designs for potential
     inclusion on a “register of possible alternatives for further consideration”. Of
     these nine alternative designs, Airservices determined that one would be
     placed on a Noise Improvement Register for further consideration in the future.

The ‘Engage Airservices’ platform

7.29 At the same time that Airservices published its Proposed Final Design and
     Consideration of Feedback report, it launched its ‘Engage Airservices’
     platform. This was a genuine initiative by Airservices to add an interactive tool
     to its engagement activities, as the functionality became available and in
     response to what it heard through its community engagement. Airservices
     advised:

                  During our Sunshine Coast consultation, we received community feedback that you
                  would like an interactive platform and more resources to assist you in understanding the
                  flight path changes. Our new Sunshine Coast engagement platform includes:

                   an interactive map for the Sunshine Coast with the proposed final flight path designs
                   Community Specific Fact Sheets
                   Runway Operations infographic poster set, and
                   FAQs.



28 Airservices Australia, Proposed Final Design and Consideration of Feedback – July 2019, 16 July 2019, p. 27



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 23

Section 27

                  Information on the ‘Engage Airservices’ platform can be accessed without registering,
                  however if you would like to submit a query or complaint, or put a comment on the
                  interactive map, you will need to register.

                  …

                  Queries

                  If you have queries about the Sunshine Coast Proposed Final Design and
                  Consideration of Feedback, you can submit them via ‘Engage Airservices’.

                  There is also a form to submit complaints related to community engagement.

                  Please note as consultation on this proposed flight path change is closed we are no
                  longer accepting feedback on the proposed final design.

7.30 While the ‘Engage Airservices’ platform allowed ten days for people to submit
     queries and complaints through this portal, Airservices had closed the
     consultation period and was not receiving feedback on the final design.

7.31 Airservices advised on its website that:

                  During the 10 day query period, we received a total of 2,400 visits to our Engage
                  Airservices engagement platform. We also had 119 queries and complaints submitted
                  and our documents were downloaded 1,670 times.

7.32 The ANO received complaints from some community members expressing
     frustration that so little could be varied. Such concerns can be summarised as
     follows:

               What was the point of consulting when basically nothing has changed and
                all suggested alternatives would be dismissed?
               Airservices is just going along despite the community’s will and are just
                doing the bidding of the SCC
               No consideration given to any flight paths outside the EIS.
7.33 In recognition that the tool has the potential for improving information provision
     in support of community engagements in future, one individual posted on the
     Airservices interactive map within the Engage Airservices platform:
                  It would have been even better if I had this information, or at least been alerted to it,
                  when the original EIS was done, as clearly this was when the decision making took
                  place in relation to the route the flight paths would take

7.34 The platform had a moderation process which removed eight comments
     posted by individuals on the basis that they “contained profanities” (1),
     “identified a staff member by name” (1) or “were defamatory” (6). Some
     individuals complained to the ANO that they “were not allowed” to repost after
     receiving the advice that their post had been deemed defamatory. Airservices
     advised that individuals had to repost within the query period and only two did
     so. One complainant also took issue with the fact that this was the only direct
     communication he received from Airservices during the consultation process:
                  …they don't have time to respond to all the submission complaints about their flight path
                  placements but they have time to let me know I am being censored it appears

Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 24

Section 28

7.35 The ANO also received complaints from some who used the interactive map
     that they had asked questions in their post but never received a response:

                  ASA invited residents to participate in an interactive map allowing them to place a ‘pin’
                  on their property position. Their interactive map also allowed for comments and
                  questions and was set up about six months ago. To date there has been no response to
                  mine nor any of the other hundreds of participants comments or questions put to them
                  on this interactive map.

          Airservices advised that:

                  Where it was clear that an individual had posed a question or raised a complaint
                  Airservices responded to that individual by email.

Further representations

7.36 Airservices submitted its Airspace Change Proposal, based on its final design
     to CASA on 29 July 2019, but representations continued to be made by
     affected residents. Airservices conducted numerous briefings and technical
     workshops with community groups to assist the community with opportunities
     to ask questions to gain an understanding of what would be implemented.

7.37 Discussions in August 2019 between Airservices’ technical specialists, the
     Buddina community representatives and their Member of Parliament raised
     alternative flight paths that would reduce the noise impacts on the community.
     Airservices determined, however, that there was not time to fully consider
     them until after the runway opening, but acknowledged it was worthy of further
     consideration and potentially registering on its ‘Noise Improvements Register’.

7.38 Together with the one proposed alternative determined by the Proposed Final
     Design and Consideration of Feedback report, Airservices committed to future
     consideration of two alternative flight paths.




Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 25

Section 29

8 Complaints about the process
8.1       At a briefing on 1 May 2019 with senior Airservices officers, the ANO was
          advised that Airservices did not intend to respond to the complaints it had
          received and continued to receive, but had decided to treat all complaints
          received as ‘feedback’.

8.2       The ANO continued to receive many complaints from community members
          that their inquiries and complaints had not been responded to by Airservices.
          On 13 June 2019, after Airservices had published its Summary of Feedback –
          Part One report, Airservices confirmed its processes had given priority to
          reviewing and analysing submissions. It advised:

                  We prioritised producing feedback reports because they will provide a chance for all
                  participants to get a sense of a broader range of ideas and concerns that were raised
                  during the consultation process and an understanding of how this feedback was
                  considered in the final flight path design. Given we are working to the runway
                  development project schedule, and the volume of feedback is significant this is
                  considered the most practical alternative to responding to each submission received
                  during the consultation.

8.3       In August Airservices advised the ANO that it intended to analyse all
          communications from the community to identify complaints and respond to
          them. Airservices advised that this analysis identified something in the order of
          1000 submissions that included complaints and that responses would be sent
          to all complainants identified. From late August through to late September (five
          or more months after complaints were lodged) Airservices sent letters to these
          complainants, acknowledging the complaint, reiterating the consultation
          process, including referral to previously published documents, and recognising
          that:

                  we will not be able to please everyone in this process and there will remain some
                  community members who are not satisfied with the outcome of the proposed flight path
                  designs.

8.4       Complainants expressed disappointment at this response, for example:

                  ASA’s response did acknowledge SCC’s letterbox drops may not have reached all
                  households. ASA’s response also inferred that they are aware of the botched
                  notification process, quote, “We understand that you may not have been aware of, or
                  received late notification regarding, Airservices consultation drop-in sessions.”

                  ASA efforts in this entire process have been woeful and they are hiding behind the
                  pretext of aircraft safety and operations, and bending to the will of the Sunshine Coast
                  Council and airlines whim are only interested in money with little concern or
                  consideration for the impact on residents and the environment whom live in the flight
                  path areas and will be most affected.

                  I must admit I feel completely despondent and that no one in government is listening.




Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 26

Section 30

9 Conclusions
9.1       Airservices has an obligation to inform, consult and constructively engage with
          communities potentially affected by proposed flight paths before they are
          implemented. Airservices asserts that it can rely upon consultation undertaken
          by others in an EIS process to meet this obligation. Airservices must, however,
          turn its mind to whether such a consultation was adequate. In this case,
          Airservices took no part in the consultations that occurred as part of the EIS
          conducted in 2014/15 by the Sunshine Coast Council and did not conduct its
          own assessment of that process. It told the ANO that it accepted the approvals
          of the Queensland Coordinator General and the Commonwealth Minister for
          the Environment to be sufficient evidence that an appropriate process had
          taken place.

9.2       Airservices aligned its flight path designs with those in the EIS but also
          proposed variations to reduce overflight of some north-west and north-east
          communities. However, it was not open to further variations in other areas as
          proposed by the community, which could potentially deliver improved
          environmental outcomes. Airservices took the position, as described in its
          Proposed Final Design and Consideration of Feedback Report29:

                  Alternative flight path designs submitted that were outside the approved EIS concept
                  flight paths were not able to be progressed at this time.

9.3       While there had been a consultation process and approvals on the basis of the
          EIS, it was apparent from the EIS documentation that the flight paths it
          contained were concepts and potentially subject to change over time:

                  The changes proposed in this chapter represent the flight paths and airspace currently
                  envisaged by SCA to be adopted for operations on the proposed runway. However,
                  these concepts are preliminary and future developments in aircraft technology and
                  navigation systems, as well as development of the Brisbane basin air traffic
                  management network could result in changes to the proposed airspace. 30

9.4       Airservices’ internal procedure (NOS)31 requires the re-assessment of the
          environmental impact of proposed flight paths if more than 18 months has
          passed since its last assessment. GHD’s TEIA ensured this requirement was
          met. However, the point made in the NOS is that a lot can change over 18
          months, let alone over 4 to 5 years and this applies equally to planning the
          stakeholder engagements as it does to considering the environmental impacts
          associated with a change. The level of population churn in the areas affected
          would have been one relevant consideration.




29 ibid, p. 27

30 Sunshine Coast Council, Sunshine Coast Airport Expansion Project – Environmental Impact Statement, 18

September 2014, p. D2-169
31 Airservices Australia, NOS, op. cit. - see paragraph 2.7 above



Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 27

Section 31

9.5       The consultative process carried out by Airservices in 2019, however, was
          conceived on the basis that the EIS consultations in 2014/15 largely satisfied
          its obligations and no further consultation by it was required with those people
          potentially affected by aircraft noise in the areas covered by the previous
          Sunshine Coast Council processes (the general area). Airservices determined
          to directly consult only those potentially affected in areas where it had made
          modifications to the 2014/15 concept flight path design (the target area).
          “Consultation” with those affected in the general area, described by
          Airservices as a community update program, and in Airservices’ SEP as
          “activities aimed to inform and update the community on the development and
          implementation of Runway 13/31”32, would be the responsibility of the
          Sunshine Coast Council, with Airservices providing support.

9.6       This apparent division of responsibilities, produced confusion as the process
          continued. Airservices and the Sunshine Coast Council each placed separate
          public notices about upcoming consultation activities and complaints show
          inconsistent information provided at community consultation sessions by
          representatives of the two parties. Airservices did not anticipate the extent of
          public interest and did take steps to respond to the changing circumstances. It
          also considered the feedback received from general as well as the target
          areas. However, Airservices’ decision to only consider varying its final design
          from its proposed design where suggested alternatives were aligned to the
          EIS concept paths meant that “consultation” with those in the general area
          was effectively consultation in name only. The complaints to the ANO
          demonstrate that public anger continued to grow through the process and
          remained after the consultation period had closed.

9.7       Standards of best practice consultation for major infrastructure projects require
          that those consulted have at least some potential to influence the outcome and
          contribute to the final position. The International Association for Public
          Participation (IAP2)’s Quality Assurance Standard for Community and
          Stakeholder Engagement33 adopts the IAP2’s Core Values for public
          participation, state that public participation:

                   is based on the belief that those who are affected by a decision have a right to be
                    involved in the decision-making process
                   includes the promise that the public’s contribution will influence the decision
                   promotes sustainable decisions by recognising and communicating the needs and
                    interests of all participants, including decision makers
                   seeks out and facilitates the participation of those potentially affected by or
                    interested in a decision
                   seeks input from participants in designing how they participate
                   provides participants with the information they need to participate in a meaningful
                    way
                   communicates to participants how their input affected the decision.



32 Airservices Australia, SEP, op. cit, p.6

33 International Association for Public Participation, Quality Assurance Standard for Community and Stakeholder

Engagement, 2015, p. 10

Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 28

Section 32

9.8       There was never any realistic prospect that residents in the general area,
          despite the chance to provide their feedback, had any significant opportunity to
          influence the proposed flight paths. This quickly became apparent to them
          during the process and was the fundamental basis of the complaints to the
          ANO.

9.9       Airservices’ evaluation of the feedback, in separate reports for the general and
          target area, was that the consultation was “successful” based on the number
          of activities and volume of response. This in itself gave rise to further
          complaints. Complaints to Airservices about the consultation process were put
          to one side and eventually responded to well after the end of the consultation
          period.




Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 29

Section 33

10 Recommendations
10.1 When Airservices becomes involved in changed flight path design as a result
     of another party’s project, such as for a proposed runway, its obligation to
     consult with the community about the environmental effects of aircraft
     operations remain. Although this obligation may be discharged in cooperation
     with others, the lack of effective coordination between Airservices and
     Sunshine Coast Council in this case, makes it clear that any future
     assessment of and consultation on environmental impact by Airservices
     involving another party will require more careful consideration and, if joint
     assessment is to occur, much more careful planning, commitment and
     attention from those involved as well as effective governance mechanisms to
     ensure that relative responsibilities are adequately discharged. To avoid
     similar challenges in the future, Airservices needs to engage early in the
     planning stages of third party-initiated projects and maintain an ongoing
     interest as the projects progress.

                                    Airservices should develop a framework for third party
                                    proposed changes that:
                                    (a) provides robust and dependable governance
                                        arrangements to manage its early and ongoing
                                        engagement with third parties
                                    (b) establishes clear lines of accountability and documents
                                        these arrangements as they evolve
                                    (c) ensures an effective consultative process, which includes
                                        monitoring the adequacy of any third party consultations
                                        being relied on.
10.2 In considering the wide range of submissions it received and accepting further
     representations after the consultation period closed, Airservices acknowledged
     that there were some community-suggested alternatives that may offer better
     noise outcomes and are worthy of further investigation. In the short timeframe
     it had to finalise its designs for CASA approval ahead of the scheduled
     implementation date, these could not be properly assessed. However,
     Airservices committed to further considering these options as part of its Post
     Implementation Review process.

                                    Airservices should, as soon as practicable, design an
                                    effective post-implementation review (PIR) process for the
                                    Sunshine Coast flight path designs, that does not perpetuate
                                    design constraints requiring alignment with EIS concepts,
                                    and which encompasses:
                                    (a) consideration of identified community-suggested
                                        alternatives
                                    (b) a community engagement process that provides for
                                        genuine opportunities for community contributions to
                                        influence decisions
                                    (c) application of the latest version of Airservices’ National
                                        Operating Standard (NOS) Environmental Management
                                        of Changes to Aircraft Operations (AA-NOS-ENV-2.100).
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 30

Section 34

10.3 The ANO also acknowledges that some complaints it received raised concerns
     about the effectiveness of Airservices’ noise impact assessment processes.
     As many noted, the recommendations made by the ANO in its Investigation
     into complaints about the introduction of new flight paths in Hobart (April 2018)
     had not been fully implemented at the time Airservices undertook its activities
     in the Sunshine Coast. Given this, and that those recommendations have now
     been addressed by a substantially updated NOS, the ANO has not made
     further recommendations on this issue, but continues to monitor Airservices’
     progress towards improved environmental assessment procedures and
     practices.




Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020)   Page 31

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.