2020-10-12 GC Agenda - Item 9 - Attachment 1 - Aircraft Noise Ombudsman Report - Investigation
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
5 Community Consultation
Joint Stakeholder Communication and Engagement Plan
5.1 In the case of the Sunshine Coast, leaving aside the EIS processes in
2014/15, community engagement about the proposed airspace and flight path
changes was undertaken jointly by Airservices, Sunshine Coast Airport and
Sunshine Coast Council.
5.2 The arrangements for the period of public engagement (20 March to 30 April
2019) were documented in a joint Stakeholder Communication and
Engagement Plan (SCEP)11.
5.3 The SCEP noted in its introduction that:
Airservices must meet a regulatory obligation to show evidence that affected
communities were engaged with how the designs would impact them.12
and defined Airservices’ engagement responsibility as:
Release of updated information:
Flight paths
Airspace design
Impact on communities (what will I see and hear?)13
Airservices’ Stakeholder Engagement Plan
5.4 Separately, and as required by its NOS14, Airservices had prepared its own
internal Stakeholder Engagement Plan (SEP)15. Version 1.0 of the SEP was
approved on 17 March 2019 by the Acting Executive General Manager, Air
Navigation Services, with the following caveat, among others:
The SEP also provides limited social, economic and cultural context of the communities
being consulted to ensure genuine engagement and accessibility of information,
however this will be addressed in future versions and other planning products. 16
11 SCAEP Stakeholder Engagement Working Group (SEWG) (comprising Sunshine Coast Council Airport
Expansion Project Team (SCC), Airservices Australia and Sunshine Coast Airport (SCA) Pty Ltd), Airspace change
and flight path design for Sunshine Coast Airport RWY 13/31 Stakeholder Communication and Engagement Plan
20 March – 30 April 2019 (SCEP), Version 5: WEDNESDAY 13/3/19 4.30pm
12 ibid, p. 3
13 ibid, p. 12
14 Airservices Australia, NOS, op. cit
15 Airservices Australia, Stakeholder Engagement Plan, Sunshine Coast Airport Airspace Changes, Runway 13/31
(SEP), Version 1.0: Effective 17 March 2019 (SEP V1)
16 ibid, p. 1
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.