7 Consultation in practice
Website information
7.1 Airservices used its website as a mechanism for communicating publicly about
its proposed flight path changes. This was an effective tool for
communications, which was updated regularly and provided a range of
relevant information and resources, including general and community specific
Fact Sheets and Frequently Asked Questions during the consultation period.
7.2 The 20 March update included a copy of the Fact Sheet titled “Sunshine Coast
Airport Proposed Airspace Change Runway 13-31”, which identified that:
In 2014, Sunshine Coast Council consulted with the community on early design
concepts, which included an Environmental Impact Statement approved by the State
Government. To support operation of Runway 13/31 in 2020, Airservices proposed
design has been modelled on the flight path design concept in the Environmental
Impact Statement.
To improve environmental impacts, Airservices proposed flight path design variations
from the design concept.
However, there was no reference in any material at this time that the
consultation was limited to only these variations or clear advice that the new
flight path design was necessarily constrained by the flight path design concept
in the EIS. Indeed, the fact sheet said:
Airservices Australia is proposing airspace changes at Sunshine Coast Airport to
support the operation of a new runway, known as Runway 13/31, which will be
operational in 2020.
These proposed designs use modern technology and aircraft capability to be as safe
and efficient as possible. Wherever possible, changes to the flight paths that would
deliver safety enhancements have been identified and these have been balanced with
minimising the effects of aircraft noise on the community, as far as practical.
Airservices is seeking feedback on the proposed flight path design to be considered as
part of the final airspace design.
7.3 On 4 April, Airservices released a “Frequently Asked Questions” document
which it committed to updating:
…as we progress consultation on the proposed airspace and flight path changes to
support operation of Runway 13/31 at the Sunshine Coast Airport
7.4 On 8 April, Airservices announced on its website the commencement of its
series of four consultation drop-in sessions and at the same time was specific
about the limited scope of the consultation. Almost mid-way through the
consultation period, this announcement was the first public indication that
Airservices’ consultation would be limited to the target area:
Airservices has designed proposed airspace and flight paths to support operation of the
new runway and these are modelled on the flight path design concept in the
Environmental Impact Statement. These designs include variations to improve
environmental impacts. Airservices is consulting on the variations to the flight paths
from the approved Environmental Impact Statement.
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.