Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
Uniting Care Community (Lifeline)
St. John’s Ambulance Service
St. Vincent’s De Paul
Adventist Development and Relief Agency
Australian Wildlife Hospital (Australia Zoo)
Save the Children
Insurance Council of Australia
27.7.3 Infrastructure Recovery Sub-group
Role
The Infrastructure Sub-group is to coordinate planning and implementation of infrastructure
recovery in the Noosa local government area.
Responsibilities
assess damage to housing stock, commercial and industrial buildings and structures,
rural structures, roads, bridges and public infrastructure
liaise with the Insurance Council of Australia to ensure the declaration of the general
insurance industry Catastrophe Coordination Arrangements and to identify nominated
ICA representative
coordinate building safety inspection services, secure damaged buildings and structures
and coordinate demolition/repair and rebuilding
coordinate the assessment of damage to housing stock, commercial and industrial
buildings, rural structures, and infrastructure facilities
work with all sectors/stakeholders to determine priority of work
assist with the development of options for temporary accommodation
assist with development of a coordinated approach to housing related strategies
coordinate restoration of sporting facilities and public playgrounds
coordinate disposal of hazardous material, debris, waste etc
work with affected communities and interest groups to support their involvement in the
decision making process
ensure risk reduction is considered in planning for rebuilding and reconstruction
Reporting responsibilities
Chair is to attend meetings of the Sub-group and represent the Group on the LDRC
sub-group is to meet as required at the discretion of the Chair of the sub-group
agendas, minutes of meetings and action plans are to be copied to the Chair of the
Noosa Local Disaster Recovery Committee
Sub-group composition
Suggested members
Full membership may be derived from inclusion of key representatives from a range or
government and non-government organisations. When establishing a Sub-group for
recovery operations consider whether specific organisations are best placed at the Sub-
group or Local Advisory Group level. Possible entities for inclusion as full members of the
Infrastructure Recovery Sub-group include:
State government agencies and government bodies
State Development, Infrastructure and Planning
95
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.