Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                         Noosa Local Disaster Recovery Plan 2015/2016

                                    DSIP’s objectives (on which they will focus during
                                    recovery) are:
                                     champion the interests of business and industry in
                                       Queensland
                                     fast track delivery of major resource and industrial
                                       development projects
State Development,
                                     diversify and build resilience in regional and state
Infrastructure and Planning
                                       economies
(DSIP)
                                     assist property and construction industries to grow
                                       and flourish through streamlined planning
                                       processes
                                     re-empower local governments and their
                                       communities to plan for their futures
                                     improve service delivery

                                    Queensland Health has lead agency responsibility for
                                    the follow key areas:
                                       medical command, control and coordination of
                                        health resources
                                       appropriate pre-hospital on-site medical and health
                                        response management for casualties
                                       transportation to appropriate hospitals for definitive
                                        treatment and care
Queensland Health                      public health advice warnings and directions to
                                        combatants and the community
                                       psychological and counselling services for disaster
                                        affected persons of the general community
                                       emergency workers and recovery workers
                                       ongoing medical and health services required
                                        during the recovery period to preserve the general
                                        health of the community
                                       scientific services during health event response and
                                        recovery operations.
                                  Works to minimise the disaster’s impact on the
                                  community’s education and training services. In
Department of Education,          recovery works with Local and State Recovery
Training and Employment           Groups to determine priorities to deliver required
                                  services.
                                  Police and Community Safety assist recovery
                                  through maintaining law and order and public
Police and Community Safety       safety. In recovery works with Local and State
                                  Recovery Groups to provide required services.
                                  Plans, manages and delivers Queensland's integrated
                                  transport environment to achieve sustainable transport
                                  solutions for road, rail, air and sea. In recovery works
Transport and Main Roads
                                  with Local and State Recovery Groups to establish
                                  priorities for repair and reconstruction of transport
                                  infrastructure and services.




                                                                                             99
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.