Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                            Noosa Local Disaster Recovery Plan 2015/2016




Figure 1 – Interaction between prevention, preparedness, response and recovery
(AEMI Community Recovery Handbook, Handbook 2)

Any event that requires significant recovery also provides opportunities to make
communities more resilient for future events. Recovery should be viewed as an opportunity
to enhance disaster resilience.

Effective recovery requires a range of services operating in a coordinated and streamlined
way. The integration of government agencies and government owned corporations, NGOs,
industry groups, the private sector and whole-of-community is the foundation of recovery.


2. Four functions/pillars of recovery
Effective recovery requires an integrated, multi-disciplinary approach. It commences with
detailed needs analysis, consequence management, community engagement and planning
and then moves into service delivery. A coordinated effort by all agencies involved in the
recovery process is necessary. It is a complex and potentially protracted process. To assist
in managing complexity, recovery can be conceptually grouped into four inter-related
functions applicable in an all hazards environment:
           economic
           environmental
           human-social
           infrastructure (which can be further broken down sub components such as roads
            and bridges; community infrastructure etc)


3. Recovery principles
This plan has been developed in accordance with the following national principles for
recovery agreed in 2008.
   understanding the context

                                                                                             2
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.