Communicating,
Key recovery Issues / challenges
Tasks / key drivers monitoring and
stages/elements / obstacles
review
management are adhered to
Ensure time out and
reflection breaks are
taken
Planning approvals Provide regular status
involve regulatory reports and advice to
considerations LDRC for liaison and
Resource consent Include scenarios and engagement with the
needs to be Anticipated community regarding
subsequently applied consequences within their accommodation,
for if there is an organisational recovery service and cultural
ongoing environmental plans needs
8. Formalising
effect
work programs and Communicate the plan
Technical resources Provide access to
carrying out design (especially design technical resources that and design
work consultants) can stay involved over
the period of the
recovery program/ plan
Ongoing access to Secure appropriate
resources (materials, stores of key/specialist
skills, and items that are likely to be
key/specialist difficult to source in
items) quantity at short notice
Shortage and/or Involve construction and Provide regular status
limited capacity of related contractors (who reports and advice to
contractors (both may not have standing/ the LDRC for liaison
specialist and ongoing contracts) in and engagement
general building planning to enable them with the community
contractors) to identify and regarding their
Additional project understand the demands accommodation,
management involved service and cultural
capability may be needs
required
Tender requirements Assess tender Communicate status
and processes applications and award reports on contractual
9. Organising Contractual/ contracts arrangements and
procurement agreements to the
and managing LDRC
arrangements
contracts for Material supplies Secure supply chains
the physical and material providers
works Staff resourcing Consider
accommodation
and transport for staff
and contractors
(including labour hire)
Train and equip
personnel (e.g. personal
protective equipment/
inductions)
Financial constraints
Security of staff and Continually assess
materials vulnerabilities and
threats to recovery site
10. Obtain certificates for
Commission works final use of built things
and finalise (e.g. occupancy
program certificates) Handover
Stages/key process elements Infrastructure Recovery
(AEMI Community Recovery Handbook 2)
115
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.