Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
The four State Government Functional Lead Agencies for recovery are represented at the
Disaster District level and will coordinate the provision of State recovery resources within the
District to the affected area. These services should be coordinated through the LDRC using
agreed service delivery arrangements.
Disaster District members will often be asked to contribute to the recovery effort through
participation on the Local Disaster Recovery Committee or its sub-groups as appropriate.4
Furthermore ongoing liaison with the Disaster District Coordinator (DDC) and the District
Disaster Coordinator’s Executive Officer on recovery matters is necessary to ensure support
from the State through the Disaster District is relevant and coordinated. Reporting on the
recovery effort should be provided to the district to assist in coordination and district level
planning. The concept of recovery information and resources flow in Queensland is
depicted in Figure 4.
11.6 Functional lead agencies (state level)
Under the State Disaster Management Plan, key state government departments are defined
as functional lead agencies for the four functions of recovery. These functional lead
agencies are appointed to assist in the coordination of State level support to the local
recovery effort. The state functional lead agencies for recovery are detailed in Table 1.
Function Lead Agency (State and District Level)
Economic Department of State Development, Infrastructure and Planning
Environmental Department of Environment and Heritage Protection
Human-social Department of Communities, Child Safety and Disability Services
Infrastructure Transportation infrastructure: Department of Transport and Main
Roads
Building recovery: Department of Housing and Public Works
Energy infrastructure (electricity, gas, fuel): Department of
Energy and water supply
Water supply and sewerage Infrastructure: Department of Energy
and Water Supply
Water entities: Unitywater
Telecommunications: Telstra; and other telecommunications
providers
NDRRA and SDRA
Queensland Reconstruction Authority
coordination
Recovery
coordination and Queensland Reconstruction Authority
monitoring
(coordination function)
Table 1 – Functional Lead Agencies (State level)
(Queensland Recovery Guidelines)
11.7 Establishment of a statutory authority by the State
In circumstances deemed appropriate by the Premier, the recovery structure for the State
may be determined by the Premier, under the auspices of a Task Force or Statutory
Authority. The Premier, and where necessary the Queensland Parliament, will determine the
4
State agencies do not require approval or permission from the DDC to assist or sit on the Local
Recovery Committee Sub Groups. State Agencies are involved in the Local Recovery Committee as
part of their normal business. The Local Recovery Coordinator can approach any State Agency for
assistance.
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.