2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                           Noosa Local Disaster Recovery Plan 2015/2016


PART C – Recovery Activities
21.    Introduction
This section of the plan provides guidance to the Noosa LDRC and the sub-groups on ‘how
to’ conduct recovery operations. It draws from material provided in the Australian
Emergency Management Australia – Community Recovery Handbook 2 which offers current
best practice guidance on recovery.

This part is divided into four sections each aimed at one of the four pillars of recovery. This
part should be used by the sub-groups to assist them in undertaking their function.

It should be noted that recovery is essentially a creative endeavour aimed at addressing and
resolving problems and issues to achieve defined objectives. Each disaster is essentially
different and the recovery activities undertaken for each disaster event will often be unique
to that event. This part is provided to guide the LDRC and sub-groups by providing typical
methodologies and considerations for recovery. It is not exhaustive and the LDRC and sub-
groups must recognise that a range of methodologies and considerations may be applicable
to any particular event.


22.    Recovery project cycle
The LDRC and sub-groups should strive to manage recovery operations using the recovery
project cycle. Figure 9 depicts this cycle.




                             Figure 9 – Recovery Project Cycle
                              (AEMI Community Recovery Handbook 2)



23.    Human/social recovery
Human/social recovery activities often begin spontaneously within a community and it is the
role of the Human/Social Recovery Sub-group to provide structure and resources to support,
integrate and coordinate these spontaneous efforts.
                                                                                             32
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.