2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
required.
Closed - Croamhurst Conservation Park; Cooloola (Noosa
River) Resources Reserve. Partly open - Dularcha National
Park; Bribie Island National Park; Kondililla National Park;
Maleny National Park; Mapleton Falls National Park; Mapleton
National Park; Mooloolah River National Park; Parklands
Conservation Park; Ringtail Forest Reserve; Tuchekoi National
Protected Area Estate Park.
EHP Southern Region: 4 TEL applications received. 3
approved, 1 refused. Noosa Shire Council landfill - approved
31/1/13; Transpacific Industries, Bundaberg - approved 1/2/13;
Temporary Emissions Licences (TELs) Holicim, Toowoomba - refused 1/2/13; Holicim approved 6/2/13
European heritage sites damaged through sewer/
flooding issues/ coastal erosion (WW2 bunkers on
Bribie)
Region wide coastal erosion
Bribie island break through issue
Increased sediment movement through rivers to open
ocean including impacts on near shore
ecology/ reefs, impacts on coastal ICOLL fish
breeding habitats
Landslips at a number of sites
Loss of dunal vegetation from erosion
Vegetation dieback from foam impacts
Increased midden site exposure due to erosion
Local Council advice
Turtle nest lost due to erosion (16 nests)
Contact: Michael Anderson
Vegetation loss and damaged throughout the
[email protected]
protected area network (including significant hollow
bearing trees)
Significant riverbank/ creek bank erosion issues and
assoc riparian vegetation loss
Damage to protected area infrastructure – e.g.
signage/ trails/ fire tracks
Seagrass decline
Sewer network failure and associated contamination
issues (e.g. reduction of DO levels)
General debris and aquatic weed movement through
waterways
Increased acid sulphate leachate movement from
development sites
Exotic fish movement through waterways (e.g. Ewen
Maddock Dam)
Public health/ hygiene issues associated with wide
spread event factors such as power loss e.g. food/
water contamination
Able to provide specific examples of each of the listed
items above if needed.
In some cases, ecological survey techniques need to be employed to assess specific
concerns, or to gain a broad audit of natural environmental impacts and likely consequences
of the disaster. A rapid response research capacity following a large-scale natural
disturbance assists in understanding the ecosystems dynamics and long-term
consequences of natural disasters.
26.4 Interaction with the other pillars of recovery
Often there is a high level of activity post-disaster to restore infrastructure services and
‘normal’ environmental considerations may be bypassed (for example, seeking vegetation
clearance approvals). Although quick action is essential, good environmental practices, if
built into the process beforehand, can still be applied. The LDRC should consider any
competing outcomes between the environment recovery effort and that of the other pillars of
recovery.
63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.