2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                          Noosa Local Disaster Recovery Plan 2015/2016

List of Tables
Table 1 – Functional Lead Agencies (State level)
Table 2 – Main Steps in the Recovery Process
Table 3 – Recovery Activation, Triggers and Actions
Table 4 – Community Sectors to be considered in Community Needs Analysis
Table 5 – SMEAC Structure for Operational Planning
       Table 6 - Economic & financial impacts of disasters at the household and business /
       industry level
Table 7 - Direct and indirect economic impacts of disaster on key community sectors
Table 8 – Examples of impacts of disasters on the natural environment by component
Table 9 – Principles of ecologically sustainable development (in recovery)
Table 10 – Examples of recovery activities (risk treatment options) in the natural
environment
List of Figures
Figure 1 – Interaction between prevention, preparedness, response and recovery
Figure 2 – National Recovery Principles
Figure 3 – Three levels of Recovery
Figure 4 – Community driven Recovery Process
Figure 5 – Recovery Reporting and Resource Flow
Figure 6 – Noosa Recovery Framework
Figure 7 – Response and Recovery Levels of Activation
Figure 8 – The Recovery Needs Analysis Concept
Figure 9 – Recovery Project Cycle
Figure 10 – The multi-layered aspects of the community
Useful Checklists
1.   Pre-event planning
2.   Community recovery management/coordination
3.   Recovery management/operational considerations
4.   Outreach
5.   Evacuation/Emergency Relief Centre
6.   Recovery Centre
7.   Human Resources (managing people)
8.   Community Recovery Evaluation
References used in the development of this plan
Queensland Recovery Guidelines, 2012
Australian Emergency Management Handbook 2 - Community Recovery
Australian Emergency Management Series – Manual 10 – Recovery
Australian Government – NDRRA Determination 2012
QRA – Rebuilding a stronger, more resilient Queensland
QRA – Operation Queenslander – Local Plan
Queensland 2013 Flood Recovery Plan
South Burnett Recovery Plan


Other Useful References for Recovery
International Recovery Platform - http://www.recoveryplatform.org/
Volunteering Queensland - www.volunteeringqld.org.au




                                                                                         70
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.