Council archive · source document
Geotechnical Stability Assessment · MCU19/0008
Project No. PG-2096 Page | 9 April 2019 Ref: PG-2096, 2019-02-21, GR VER 2 Andrew and Michelle Douglas – Geotechnical Stability Assessment - Proposed Residence, 22 Arakoon Crescent, Sunshine Beach TABLE 3 EARTH PRESSURE COEFFICIENTS (NON-SLOPING CREST BACKFILL) Unit Friction Active At Rest Passive Material Weight Angle Ka Ko Kp (kN/m3) (degrees) Loose 18 26 0.39 0.56 2.56 Sands Medium Dense 18.5 30 0.33 0.50 3.0 Dense 19 32 0.31 0.47 3.25 Preference should be given to adopting thin soil layers and using small hand- controlled compaction equipment during backfilling against retaining walls. This is in order to limit the stress applied to the walls during construction. Should heavy compaction be required, then wall stresses will be well in excess of Ko and temporary propping should be used. It is recommended that all retaining walls be drained for full height in order to minimise hydrostatic pressure build-up behind the wall. Additional guidelines on wall drainage are provided in Appendix G of AS 4689-2002. 9.0 SITE MANAGEMENT To maintain the long term performance of the structure, good management of the soil conditions and the development is vital throughout the life of the development. The following are some specific comments with respect to site management. It is important that the site be well drained. The ground around the building should slope away at 1 in 20 for 2 metres and then fall to the stormwater system to prevent ponding of water adjacent to the building. Founding soils should not be allowed to become saturated. Service trenches under the buildings should be kept to a minimum. Saturation of the on-site material will result in an increase in potential ground surface movements. Footings should be poured immediately after excavation. If footings cannot be poured on the same day as excavation, a blinding layer of 50mm thickness is recommended. Trees, garden beds and other vegetation should be planted at a distance at least equivalent to three quarters of their mature height away from the structures. This will assist in minimising shrinkage movements in the expansive on-soils.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotechnical Stability Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.