Original source · versioned page text
Attachment 3 - Revised Engineering Report (rec. 7.04.2025) MCU24-0165 & OPW24-0222
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
TABLE 4: RECOMMENDED RAINFALL-RUNOFF PARAMETERS
Parameter Urban Residential
Rainfall threshold (mm) 1
Soil storage capacity (mm) 500
Initial storage (% capacity) 10
Field capacity (mm) 200
Infiltration capacity - Coefficient a 211
Infiltration capacity - Exponent b 5.0
Initial depth (mm) 50
Daily recharge rate (%) 28
Daily baseflow rate (%) 27
Daily deep seepage rate (%) 0
5.6.2.5 Pollutant Export Parameters
The pollutant export parameters for split catchment land use was adopted for MUSIC modelling and
are shown in Table 5.
TABLE 5: POLLUTANT EXPORT PARAMETERS – SPLIT CATCHMENT URBAN RESIDENTIAL LAND USE
Flow Type Surface Type Total Suspended Total Total Nitrogen
Solids (TSS) Phosphorous (TN)
(Log10 mg/L) (TP) (Log10 mg/L)
(Log10 mg/L)
Mean Std Mean Std Mean Std
Dev Dev Dev
Baseflow Roof N/A N/A N/A N/A N/A N/A
concentration
parameters Road Reserve 1.00 0.34 -0.97 0.31 0.20 0.20
Ground 1.00 0.34 -0.97 0.31 0.20 0.20
Stormflow Roof 1.30 0.39 -0.89 0.31 0.26 0.23
concentration
parameters Road Reserve 2.43 0.39 -0.30 0.31 0.26 0.23
Ground 2.18 0.39 -0.47 0.31 0.26 0.23
5.6.2.6 MUSIC Model Layout
The model node arrangement shown in Figure 8 has been adopted and is representative of the
proposed development.
15 November 2024 Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.