7       Conclusion
This Engineering Services Report has been prepared to provide a review and information on the
engineering requirements to support the proposed development application at 5 School Street,
Pomona.
The following requirements have been reviewed as part of this report:
    •   Suitable access is provided from School St via an upgraded access.
    •   Vehicles can safely manoeuvre internal shared driveways and on-site parking.
    •   A flood search has been obtained to determine the minimum floor levels requirements and
        freeboard for the site.
    •   Stormwater quantity has been assessed and on-site detention requirements is considered
        unnecessary for reasonings provided;
    •   Stormwater quality objectives have been achieved by application of a bio-retention basin;
    •   The site is currently serviced by the existing water and sewerage network and augmentations
        to connections will be provided to meet the development requirements.
In summary, this report shows that the development site can be adequately serviced, and provision
made as currently shown and in further detailed design for this development to be in accordance with
Council's code requirements.




 15 November 2024                                                                                    Page 17
Log in to download the original file

Attachment 3 - Revised Engineering Report (rec. 7.04.2025) MCU24-0165 & OPW24-0222.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.