Attachment 3 - Revised Engineering Report (rec. 7.04.2025) MCU24-0165 & OPW24-0222
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
Attention: Rowan Anderson 15 November 2024
C/- N/A Arcos Project: 240628
By Email Rev 0
AG-240628-RPT-C-01
Engineering Report incl. Stormwater Management
5 School Street,
Pomona, QLD
Document Control
Version Date Details Prepared Checked Approved
0 15/11/24 For Approval HR GM LS
1 05/03/25 IR response JCL GM LS
Director
Lachlan Swann B.Eng (Civ) (Hons), CPEng, RPEQ, NER, MIEAust
[email protected]
For and On Behalf of Arcos Group
E [email protected]
W arcosgroup.com.au
A 177C Brisbane Road, Mooloolaba, QLD, 4557