3rd November 2021

Our Ref: 002291
Council’s Ref: MCU21/0117 OPW21/0199

Noosa Shire Council
The Chief Executive Officer
9 Pelican Street
Tewantin QLD 4565
Via email: [email protected]


ATTENTION: Wilhelm Koschade


Response to Council’s Further Advice – Proposed Combined Applications for a Development Permit
for a Material Change of Use and Operational Works Permit to Establish Multiple Dwellings (11 x Units)

5 Pearl Street and 54 Elm Street, Cooroy 4563 QLD
Lot 2 on RP153798 and Lot 2 on RP64750


Dear Wilhelm,

In relation to the abovementioned property and development application MCU21/0117 and OPW21/0199, on
behalf of 4CD DEVELOPMENTS PTY LTD (A.B.N. 28 649 018 904), we hereby submit the following information as
requested in Council’s Information Request dated 30th September 2021 and email of 1st October 2021.

In accordance with section 13.2 of the Development Assessment Rules, we wish to advise that the applicant
is providing all of the information requested.

The following attachments are enclosed within this response:

         • Attachment 1 –Revised Architectural Plans prepared by Zest Building Design,
         • Attachment 2 - Revised Landscape Plan prepared by Zest Building Design,
         • Attachment 3 – Revised Civil Engineering Plans and Response prepared by Recor Consulting,
            and
         • Attachment 4 - Revised Stormwater Engineering Report prepared by Recor Consulting.


Information Required by Council

1. Provide amended plans which includes a suitable landscape buffer with adequate width to provide dense
landscaping for screening and buffering purposes.




RG Strategic                                                     PO Box 1818       07 5474 3873
                                                                 Noosa Heads       [email protected]
                                                                 QLD 4567          rgstrategic.com.au
Full text of the other 3 pages

Page 2

Applicant’s Response

1. Refer to Revised Architectural and Landscape Plans prepared by Zest Building Design (Attachment 1 and
2).


Information Required by Council

2. Please amend Detail C on the Roadworks & Drainage Layout Plan to include a minimum pavement
replacement width of 650mm (minimum) to allow sufficient widening to align the kerb and channel with the
corresponding K&C further down the street.


Applicant’s Response

2. Refer to Revised Civil Plans prepared by Recor Consulting (Attachment 3).


Information Required by Council

3. Please amend one of the plans to detail whether the street trees are proposed for removal or retainment.


Applicant’s Response

3. In the applicant’s information response to Council submitted on 20th August, in Attachment 1 – Revised
Architectural’s Sheet A.006, includes in detail all existing trees and those proposed to be removed (two
trees in Pearl St) and those to be retained (one tree in Pearl St and one tree In Elm St).

Within Attachment 3 Revised landscape Plan Sheet L.000, details reinforce the existing trees which are
being retained. We believe that these submitted plans provide clear detail regarding tree removal and
retention.


Information Required by Council

4. Following further internal engineering review, unfortunately the revised stormwater design includes a pump
out facility to discharge the water from the development to Pearl St. Performance Outcome 18 of the
Driveways and Parking Code specifies – parking areas are designed to ensure drainage without the use of
pumps or other electrical apparatus (with no acceptable outcome provided). Historically we have not
accepted stormwater designs that include pumps due to the amenity issues the pumps cause (noise, and
fumes from back up generators) along with the potential inundation impacts on the development and
neighbouring/downstream properties in the event the pump malfunctions in a rain event. This is not an issue
we are willing to condition.




                                                                  PO Box 1818        07 5474 3873
                                                                  Noosa Heads        [email protected]
                                                                  QLD 4567           rgstrategic.com.au

Page 3

Applicant’s Response

4. Refer to the Revised Stormwater Engineering Report and Civil Plans prepared by Recor Consulting
(Attachment 3 and 4).



This ends my client’s response to matters raised by Council within their Further Advice Notice.

We ask that Council proceeds with the finalising of the assessment of this application.

Should you require any additional information or have any queries please to not hesitate to contact us.



Kind Regards,




Russell Green APIA MQELA
Managing Director




                                                                    PO Box 1818        07 5474 3873
                                                                    Noosa Heads        [email protected]
                                                                    QLD 4567           rgstrategic.com.au

Page 4

STRATEGIC SOLUTIONS,
CREATIVE THINKING

Used in these records

About this file

File size
170 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU21.0117 OPW21.0199-Response to Council's FA.pdf · 170 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.