Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0110 - Response to Information Request [As Published] · 132008.110

of 10

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Council's Reference: 2008/110

 

Our Reference: 00927 LO7 ZL
consultinga
May 12, 2008 pty Itd
town planners +
urban designers
Chief Executive Officer
Sunshine Coast Regional Council
P.O Box 141

TEWANTIN Q 4565

ATTENTION: DANIEL SMITH - PLANNING SECTION

Dear Daniel,

 

RE: RESPONSE TO INFORMATION REQUEST
Development Application for Material Change of Use of Premises — Duplex Dwelling to
be assessed against the Superseded Planning Scheme over Lot 5 RP66617, located at
8 Edwards Street, Noosaville: J Tauschke and S Chang

| refer to the above application and in particular to the request for additional information issued by your
Council and dated March 4, 2008.

This request listed two (2) items that your Council considers is necessary in order to complete its
assessment of the above application. The applicants have decided to respond to these items as below:

Item 1: Please provide a roof plan showing the proposed roof top terraces.

Applicant’s Response to Item 1: The applicants wish to advise Council that the proposed duplex design
will not incorporate any roof top terraces.

Item 2: Please provide an assessment prepared by a qualified registered engineer of the impact of
filing of the development site on the drainage condition on the adjoining properties
particularly on the property at the rear of the site (No 236 Gympie Terrace).

The assessment should include any proposed measures and works to be implemented by
the applicant to address any adverse drainage impact.

Applicant's Response to Item 2: Please find attached plans prepared by Reinhold Koenning and dated
06/05/08, identifying the proposed stormwater management for the site, and also including
information about erosion and sediment control, roof and site drainage, and, connection to
reticulated water supply and sanitary drainage.

Overall, the engineering plans prepared by Reinhold Koenning identify that all stormwater
can be drained to the road frontage. As a result of the proposed stormwater management,
the adjoining property at the rear will not be impacted on by this proposal.

The applicants consider that they have now responded to Council's request for information. The decision
making period has therefore commenced and we request that your Council proceeds with its assessment of
the above application as soon as possible.

SUNSHINE COAST OFFICE GYMPIE OFFICE

1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSAHEADS Q 4567 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570
TELEPHONE 07 54555425 - FACSIMILE 07 54555725 TELEPHONE 07 54827440 - FACSIMILE 07 54824952

[email protected] [email protected]
Full text of the other 9 pages

Page 2

Page 2

Please contact our Sunshine Coast office if you require any further information and/or clarification.

Yours faithfully

‘whe

Zana Larikka
Town Planning {ntem
martoo consulting pty Itd

Enc :(1)
ce: John Tauschke & Shirley Chang

P.O. Box 90
METUNG VIC 3904

Page 3

 

 

 

8 EDWARD ST
NOOSAVILLE

FOR

J. TAUSCHKE & S. CHANG

y Drainage nas besn Ges'gnes end anal be constructed i
Stoncord. Seneroge Low, &
fe AS 3560,

  

SANITARY ORAINAGE
Underground aipework snail ve 100 916, PVC DW, mn grege 160 UNO
‘anctl be PVC clas OW.
ron suanended shcll ce "Coeenrene” or
mus clay or HOPE,
jmork so el Eaparatar eho be MORE, or Mireaus clay wih
3,
sBECLON openings brought to surtace in povee or concrete
igings (9 hove b/Ges GOK,

          

 

 

und pipework shall be 100 alo PYG class SW min grode 1'100 UNO
#6 shall ve 100 Dio PVC do

9 (WO) ond planter
sity "membrone clamp where required

WATER SUPPLY
Pinewore anal! be occording 10 AS4070 tor exomple ABS (ceryionitrite
ng). AP (Boy arooytene) of PE (Palveinyene) or couper UND.

 

14 (PO) shall ve "Gotie Woad” oF aimilor,

 

                    

re shail ge 20 aia UNO.

   

or amlar,

protected.
y¢ Claas PN70,

 

BACKFLOW PREVENTION
Prove BED 10. ary

 

 

tor storm water to be “loston, otic” or oporavec equal.
eturers recammengatlans for loading condition.

 

Gate Water
Duct access pone!
Double check woe

         

le Enlarger
6 Orandge

 

q
level
Cole Water Rise

 

eptor tap
Down Five os
Siac Golly Non Hole
Sete veve
Nest ine Sete weve
uD vert House connection eranen
Gre i" House ¢rcin
ign level
Ingpetton Chamber
five Draower
Fire Riser
Non pat

 

water meter

reperty Boundary
Property deagniotion
Fone device

vo Valve
ne Hose Core

een Eccentric entarger
ee Enterger

ORG Overtiow Revel uly
eter

Closet

Sink

Launery tub
woshin
Nacrind
Poge wosre
© we Pow
© & Basin

Worer e-poly

Se Stower

HWS hot soter system

 
 

SITE CLASSIFICATION;
Site <2000sqm

FOWARD STREET

Trestment of sui
Demand reduction

Water quolity improvement
Flood management

Waste reduction

Back of Kero

sD

face cunoftf bio

 

  

>

IWMP RQUIRED ond complying solution accepted

 

iter strip
harvesting strategy

not required
AAA fixtures

Vai e
aha

EARS

treatment & harvesting f

PROPOSED
DEVELOPMENT

 

 

 

 

 

 

 

 

“| Pat-o

 

House

Floor Level

RLe 37

 

 

 

EXISTING SITE SURVEY

 

 

 

 

|
Lot}5 on RP66617

DRAWING SCHEDULE

INTERGRATED WATER MANAGEMENT PLAN:
1920-IWMP-1 — COVER SHEET AND CALCULATIONS
1920-IWMP-2 —-— STORMWATER MANAGEMENT

OPERATIONAL WORKS:
1920-OPW-1 — STORMWATER OPERATIONAL WORKS
1920-OPW-2 — SEDIMENT & EROSION CONTROL PLAN

PLUMBING DESIGN FOR BUILDING APPROVAL:

1920-1 — SANITARY DRAINAGE

1920-2 —- STORMWATER DRAINAGE

1920-3 — WATER SUPPLY RAINWATER RETICULATION
1920-4 — WATER SUPPLY MAINS RETICULATION

 

 

 

 

 

 

 

 

 

 

Site 510m"
Roof 218m
Oriveway 93m"
Landscape 199m?
New impervious 311m"
CATCHMENT AREAS
No

 

All kitchen, laundry & bathroom fittings and toilets
to comply with the AAA Woter Conservation Rating
System os defined by AS/NZS6400,

Provide flow restrictor valves where necessary

to taps and shower roses, The flow shall not
exceed 0 maximum of 9L/min

Note:

Qo not scale from these drawings,
Do not rely on these drawing: r
alignment ‘and levels of all existing
infrasteuct
It is the obi ion of the contractor
and/or plumbing contractor to survey
all existing services prior to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

construction
at Beseriplien Bote
ave ates “Dote__
or Developmant Approval] ¥ _, ,Oé=08-08
[For Gullfina Approwal x [06-05-08
ot Tender J
‘et Construction
he Conatructed
1
1
|————————————_—__—.
I contact: Relnhold Koenning wlEsust RPEG No 7023
PO Bax 1178
taal inOconyd 6 fH 5444 8645

emait: r@eontyd com
sewe.conhyd.com Fx: S444 g224 |

 
 

J. TAUSCHKE & S. CHANG
ANDREW McKELLAR DESIGN

Provect: PROPOSEO DUPLEX DEVELOPMENT
8 EDWARD ST
NOOSAVILLE

DRAWING TITLE:

 

1.W.M.P.
COVER SHEET AND
CALCULATIONS

 

oe
1 8 1920—twuP.

 

    

 

 

100 ov a una
Lot 5 on RP&6617

 

 

 

Page 4

 

 

 

 

  
                              

Trap type

 

1,590

 

 

 

 

 

Provide permeable povera for the
Ariveway, Muitor earparks sholl be

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    
 

      

concrete, ~ oe
Cant the procedure of construction | 109 Flop
‘ond the loyete Os wel 2 the. compaction
olay with the auppier of the permeable 100 ventas cover
pore SRO OPE] Prot tocaton to aut 18 gener ew teh td
: tl (piznse fen. ft
- FUSES = 7 *
#180 from OP's (Ce 7 ‘ t “asa esa
et [] overtiow
8 40,000 fitre
I = * 1 tor harvesting
| ferro,
yee
: 100mm sludge 20nd
» Age 99.800
-¥ fooe C1}
Fuso
Ke , ~ re
| ‘2.5m dometer
HARVESTING TANK DETAIL SCHEMATIC nis
1.4390.
——\-——— se te vee Py
WS
harvesting tank,
concrete. precast
J ALLCASTPRECAST
93.5 % 1.4 depth,
{etal volume
Description Pete.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Adjocent C+M ECOTRMEX
“~ Permeodie “
Yep Layer
\ 2000min 1 y (send, 30mm)
g ar Fei
Hot Dip GoNanised Kerb a5

Feet Fob

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

7emin__75eain, Ges 25 » 6mm Gonaniaad Hotes;
AL MB veel TNE eign to be YO0min nny ety DuV PERMEABLE PAVING FOR DRIVEWAY Buaaine OLD 4378 Pi Sate 054s
| 2. ted warts to be hot dp gohorines Son contyd ca __ Pe Saag 8226
tear Bett A > A Leet wa emit (ype Nor P), oF Suet?
nooe ag ene ’ J. TAUSCHKE & S. CHANG
i Adjacent Modular Porous Povere ASTM C-33 Sana
x Pavement (ot lecst 40% void spoce) or Sondy Loam Turt REE

\ \ \ \ BADEN DESIGN & DRAFTING SERVICE]
a 7 i (tena D5 BRovEc PROPOSED DUPLEX DEVELOPMENT

Hat ip MB connection. ne olp to 125 78 ome : eo nes 25mm) 8 EDWARD ST

pce stl clot cone or WS eection z . as NOOSAVILLE

Feria ito tings. —— Frew Fone =f 1

= Bou i DRAWING 4
DETAR A SECTION B - B ane j—-— ba,
TYPICAL CROSS SECTION OF STORMWATER TO KERB Pavement Eas Fer Faocie
LLW.M.P.
~~ Wndiaturbes Sal STORMWATER
WANAGEMENT
ALTERNATIVE PERMEABLE PAVING FOR DRIVEWAY
[tewgn” Rx [ome ee [06-03-08 | Beg ho T

 

  

 

seus 13:10 ma una]? 8 |1920-KWuP-2

([RPO:— Lot 5 on RP66E17

 

 

 

Page 5

 

 

 

 

 

 

we

 

    

 

        

 

          

          

 

 

    

      

 

 

 

 

 

 

 

 

 

 

 

       

 

 

 

 

 

 

     

        
     

  

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

  

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

+= Frog Pap
or ;
S004 feeeton ta aut 180 gente --—aee pc”
t quit af !
Toso peste gaa foe A +180 tom on Lei T : j casa asso __
Greewoy’ ator corporis anall be Mi — : Overton
concrete. y 2
Sarr theres tein tomy @
seed ae 2 © See fen C1) Q 12h
fer detail, Ko RRO a eau An
i
0 | Se topdy
DL i\ toomm studge zone p.e00
0 0
2 0
C Sam ameter
D du
0 6
HARVESTING TANK DETAIL SCHEMATIC ots
a a Hi
\ ex tang
[Sa guay ‘ct cpponte
ce ot” cone, antl
hovtu'ond weaton co] | | | RMR OOO ORY \ yp \ ms JEP =
[Pit prlor to
eonetnetion
Py
_ 30009
“uN pit,
1.08 surface runott.
with “concrate_bottom Smm gap ot bettam
e355 tam cept,
total volume
a Bescipion Bote
\ 2000in / |
a leave Ne
i Adjacent C+M ecormnex irae ones tae
Hot Dip Gatvanined Karts ai Povarpent Pe
yeh mt 2 V nels Povey,
48 {tan Som)
—— y eta
grants 28
— growal, 200run
Ysnin 75min ote: Forties tage :
f oo US section 1. UPVC pipe to be 100mm Ney duty OW Filter Fobrie
- 2. Ai seal works to be nat cip gohvanited
|i Connection fiting 3: At ena "on PVE pine ia. be svolag ath Undiaturied Sail
fefer Detoil ‘A’ wolvent weld cement (type N or P), or
‘ Ritber dg ein
. Buddina OLD 4575
° PERMEABLE PAVING FOR ORIVEWAY Bran, G0 4475 mt Save anes
Cc sencongieen Px: aaa 0224_|
an \_ :
Fiting tor cannacton ot #100
Hol dip MS connection PVE pip to 125 k 75 » Ben
i
pped te staid alt Sitcone or Ais ection
ont we titngs. saipcent usocter Porous Pavers Asta 0-33 Song
SECTION 6 - B Poremant ot tees! CO wad space) OF Sandy Loom Tart
PETalL_A \ \ Prone PROPOSED DUPLEX DEVELOPMENT
° Top Layer 8 EDWARD ST
a omen) NOOSAVILLE _
a oe nas rome Saeed TE
Bote Layer I
Concrete grovel, 200mm
Fowement Edge iter Foore STORMWATER
: at OPERATIONAL WORKS
este ea tts; _— ‘Undisurbed Soil j
ETAL. PERMEABLE PAVING FOR DRIVEWAY |
[eeaiert RK Prana ‘ww [05-05-08] Po Na 7
om aruaa] 3 9 8 [1920-OPW=1

 

 

    

SAUL + 1:100

RPD:— Lot S on RP66617

 

 

Page 6

 

 

 

4
x”
Ss

Bock of Kerb

 

STREET

 

 

NOTE;
PROVIDE STORMWATER CONNECTION
ACCROSS ROAD PRIOR TO CONSTRUCTION.

 

 

 

 

 

 

EDWAXD

} ; L Note:
| & oO Temporary crossovers
S: Sor

= == 7

 

 

may be used according
to construction scheme

 

 

 

Nn
N.

 

Perimeter sediment fence
refer to detail

 

 

 

  

 

 

© RERPOMSEALITY:

 

 

 

 

‘Thm reaporatlly kx of maaaues ragaring tha sadinert and anice corira dug sxnalhucin aha be wih ie
CONTRACTOR. The ccotactr sted aprcict one stall racbes, Keely wm tormman to be maponalite for,

‘Re oust af eds pasha such 00 paminn ore Fanched, cut 08 eeaies, cach sais are porimatar bari. AB of
wen meceurne vhad aceure fhe nucle Grechad Wo a wedimardatin basi cuteg eoneruton.

‘he ence wah doef manne prea mart lbs separa et oy
rut aapc0ed

Ketataon rc rater of Dee vectrert canted trey ol ereund the pacimetet a whore plas

‘rommerci of fences, uarcags unc alee a8 wall ax hu mackrartaton basin war each tabi wvect

mre of a accra pa are! a minictann cf macdmart raneter tie areal Ws guricter exer wf corcremn ||
ru emtmceg vatican

epee car saat cl el wn Wee by

‘emmure ero Rr ecliciom devious ar provided fr the accel ss ouch on care, bolas, paper,
me and eno butog meri cut oF,

‘enause a8 sccolee for bot incoming and oulpoing gots in parker sola nd vance we cloety marten anc cor |
tioaing dram pate and impt neat une clase.

‘cect he fw pat of scmreter if ul fre dileg conse ction and wae aloe, eaceBeagh, bales ac! her
(Renauses  eraure 69 RICE a Grecian Te eecimeriafon beaks at a8 Res,

Aa cane cf mor rand evento tu towing ectln pian aba be foowed and eaponaly et aftr by 0
CONTRACTOR:
‘DONT WAIT URS. IF BS TOO LATED

bean ila Airy Cw mind prod and monkor the dein pattn, Rectract whee rq.
‘check the forces afi eum saa an paclaca 4 lepicne shara maqured. Check and raghace a8 hecters,

 

 

 

 

 

 

 

Ls 4 se

 

 

 

 

SEDIMENT CONTROL:

                      

possible,
‘and sediment cantrots to be inetoled ond be operational betora commencing upslope

inal producing etarme,
0% permanent all

    

Construction Entry/Exit Sediment Trop.
nL eS EE aay ham
Wheel = wosh er pray unit may rod Guring

 

jjecant (0 the field Inlet
block join height fixed ta timber atohes at comers

600 NOM gap between
bogs cet Ga spilwoy

‘shal be placed ot the toe of © etope or on the contour, ino row with anda Uighty abutting the edjacent bales.

joles shall be embedded In the acilc minmum of 100mm of the downstream fide ond placed ac the
horizontal

‘be seurely anchored In ploce «i

            

   

 

 

Angie first stoke towards
predously tals bole

Cactertie fabric, a

Bidum U3 or emir.

a

Runet tom pod
directed to sediment
trap

 

 

 

 

 

       

2/Steel pickets, or 50250
ileien, SSmin eto ground

       

 

Fo to top ef stoke with
shodectoih fostener or
rc to eteo! picket

Geotertie Forte
ond Fa? Nh

Overiond fgg ROT 50150 HW atoke or steel

picket 1Z0Gmin long,

Poste or steal pickets
Seven 600mm Into ground

00min vertical avertap of fabric

Undisturbed area

 

NOTE:
‘The kadiment ond erosion control macxures apply to the folloelng works:
1, Extension of stormwotar to oppaaita side of Edward Street

2. Construction of lab ond orvewoys

X Construction of eocess drivewoy and carports

8. Construction of stormwater pipe work

‘The contractor shell provide the appropriate dotoiled devices tor each
stage and ansure the torgets of madimant ond erosion control are met.

 

 

 

 

Prior to the commencment of any construction activities the following measures:
shall be Incorporated:

© — Provide education of alta personne!

© — Set up action plans 96 8 preceution In caso of disturbances occuring
especially after an unexpected strong rainfall event

© — Provide regular Inspection and maintenance of all structures Including tho
temporary structures,

 

 

 

 

Description Dale

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pre $444 8645,
Pe S440 9224

J. TAUSCHKE & S. CHANG

 

CUENT

 

ARCHITECT + ~
BADEN DESIGN & DRAFTING SERVIC!

 

Provect: PROPOSED OUPLEX DEVELOPMENT
8 EDWARD ST
NOOSAVILLE

      

SEDIMENT & EROSION
CONTROL PLAN
OPERATIONAL WORKS

 

 

 

 

RPO:— Lot S on RP66617

 

 

Page 7

 

   

edword
street

— 5

/

\
/

jserese
F210 — entry itt —

losby

lgorage

 

awning
below

 

pomde-caotea

 

 

 

 

fg gs ot

 

 

 

#100
2

Level t

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ale

NOTE:

The Plumbing contractor shall provide all drainage
required for the discharge from A/C tundishes.
The lccation of all tundishes shatl be provided by
the Mechanical engineer.

Tundishes sholl be connected os per AS3500.2
Section 11.22 and 4.6.7.8

Tundishes may be connected:

1. To a downpipe.

2. To a FWG with a maximum 10m length.

3. Above the seol of a fixture trop, if the tundish
level is above the floodrim of the fixture limit.

4. To o Drain with o 740 pipe and trap.

 

 

Gera Deserptien Date

 

 

 

 

 

 

 

 

 

 

 

 

oa Rates Oats
Fer Gevelepment Anprovo!

[for Bunding Approval

of Tend

[Fer Construction I
Constructea l

 

 

 

ihe
iz
i
is

 

 

 

 

 

 

 

 

 

emell: @cennya.com Pu: S444 8648
wee conhyd.com Px: S444 0226
CUENT +
J. TAUSCHKE & S. CHANG
ARCAMTERT

BADEN DESIGN & DRAFTING SERVICI
Provect: PROPOSED DUPLEX OEVELOPMENT

  

 

 

 

 

 

 

 

 

8 EDWARD ST
NOOSAVILLE

PRE oe ORAWING TITLE:
Bin 2
Bn 3
She 3
= =
5 3 SANITARY DRAINAGE
WB no

400 onder

ground
pa Sele [06 o5-< Dee Ne
saurst;t00 ar uxal 3% 8 | 1920-1

 

 

 

 

(RPO:- Lot 5 on RP66617

Page 8

 

 

 

   
               

 

   

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

] ———_—_—_—_]
|
| on
. 3.5 x 3.4m depth, \
* volume
re
zoo kas os
1| Soe
rable pavers tor tha
‘ carparks ehall De
srocadure of construction
3 a well cs the compaction
sipplar of Ure permeable
w
Vv povcereactes
9 Batting
K
a
H
opt
Sods ®
Ay Sox Gunter:
Begin 128
#3.5 x 1.4m depth, i
fetal Toxine eau 940
witin 250,
Depth 180
De 8100
1 gutter vehind
Fascia
GROUND
gutter behind
Fascia
Desoianen Date
Adjacent C+M ecotanex °
“v Permeable “"
a ROOF PLAN _ — haz
Concrete, coge ror De ‘Approval x [oé—-05—08
For Bulling, Approval |X fos~a5=08
200m
=
Frog Flap Hot tip Gaboniaed Kerb ’
é
eee Se emir Stet ow
t gous a | _
sve tom toa ai ; E _ : J. TAUSCHKE & S. CHANG
we € ; - — ; ROMTECT =
5 2 Gotveniead . , y BADEN DESIGN & DRAFTING SERVICE]
g 7] fot honeeting | f 2. Ad etosl works 19 be Dot dip gemenisee erouct” PROPOSED DUPLEX DEVELOPMENT
= f Connsction, fing 3 et oe nee en es 8 EDWARD ST
: water Boer ag ent oP. ow NOOSAVILLE
2 DaAWE TME: |
—}100men stodge zone __ F600 — it
x \K : i
Fitting lor connection of #100 STORMWATER
Behe commen, ee DRAINAGE |
Tien Geomncter ies Scie i nce or
BETA A SECTION § — B
RPD:— Lot 5 on RP&6617

 

 

Page 9

 

edward
street

 

 

 

 

 

1200

1417
1
i

 

Solar HW Int
ot Irom collector

 

oe

 

 

 

 

 

2048

 

 

 

 

 

ea2

 

 

 

 

 

OPTIONAL:

 

Secondary
Pump: ~Paway UV titer system
Davey KRB 60 HS 50-00 Slertig WW 75-35"

040

7 eed sama spp ST gg ae

  

 

 

 

 

 

 

 

 

 

 

 

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

  

 

iq .
ster rif re non
' is fupelied by “RAINHARVESTING’
PUMP. & FILTRATION SPECIFICATION
ql Description Date
poncereootes s
tiottng 4
4 ow {
r | i
i Root woter vad
— melons, | —
iecreen ‘if oppicable i beroec eprovgl | X Newt aa aoa
| ‘or Bullding _Aporoval x [08-95-08]
\ For Tenaer ~
i Wor Consinsction
! Consiuctes
ESI 7 r | bed ' | !
ving 4 1 1 | |
L ' j—remate water !
. ic \—ieeillcar i
poten =
iw *n | i
i | | Pest Guantbatom ie sess 64s
: | i i sro gentng cot _ Px. S344 6724
CUENT |
: ! i J. TAUSCHKE & S. CHANG
= \ | a a
: _ i BADEN DESIGN & DRAFTING SERVICE|
| : meter i Pacuect. PROPOSED DUPLEX DEVELOPMENT
{ Lfa}—--He- 4 8 EDWARD ST
z ' ¢ NOOSAVILLE
I ! | Rana WLE:
secs a
ing vere Cl
pom Gon i WATER SUPPLY
i RAINWATER RETICULATION |
monmucter |
system 1 i
eB towns -
on eR Joma” — Tew Tomascagt oe me
STORMWATER HARVEST, Y seme $3400 esunal 7 of 8 | 1920-3

 

 

 

[RPD:— Lot 5 on RP66617

 

Page 10

 

 

 

edword
street

[Existing town mein
[connection

FLs.830

Aoply 10 local outhoritery for o
new #20 connection for domestic
voter supply,

New eannaction ot cost

 

 

 

 

 

a

Solor_gonela

 

Solar_paneia

 

 

 

 

 

 

 

 

 

 

 

 

 

mactnervocras

volcony Hoot

\4baqm

dining

Fis.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

Lavel 2
Lave 1
a al
i
Poot
‘Shower
Oround
Deseription Date.
t
Notes Bote

 

 

 

 

 

 

 

 

 

 

Jd. TAUSCHKE & S. CHANG

 

AROATECT =
BADEN DESIGN & DRAFTING SERVICE)
‘PRoxct: PROPOSED DUPLEX DEVELOPMENT
& EDWARD ST
NOOSAVILLE
DRAWING TITLE:

 

WATER SUPPLY
MAINS RETICULATION

    

 

RPD:— Lot S on RP66617

 

 

 

Used in these records

About this file

File size
824 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0110 - Response to Information Request [As Published].pdf · 824 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.