Council archive · source document
08/0110 - Response to Information Request [As Published] · 132008.110
edword street — 5 / \ / jserese F210 — entry itt — losby lgorage awning below pomde-caotea fg gs ot #100 2 Level t ale NOTE: The Plumbing contractor shall provide all drainage required for the discharge from A/C tundishes. The lccation of all tundishes shatl be provided by the Mechanical engineer. Tundishes sholl be connected os per AS3500.2 Section 11.22 and 4.6.7.8 Tundishes may be connected: 1. To a downpipe. 2. To a FWG with a maximum 10m length. 3. Above the seol of a fixture trop, if the tundish level is above the floodrim of the fixture limit. 4. To o Drain with o 740 pipe and trap. Gera Deserptien Date oa Rates Oats Fer Gevelepment Anprovo! [for Bunding Approval of Tend [Fer Construction I Constructea l ihe iz i is emell: @cennya.com Pu: S444 8648 wee conhyd.com Px: S444 0226 CUENT + J. TAUSCHKE & S. CHANG ARCAMTERT BADEN DESIGN & DRAFTING SERVICI Provect: PROPOSED DUPLEX OEVELOPMENT 8 EDWARD ST NOOSAVILLE PRE oe ORAWING TITLE: Bin 2 Bn 3 She 3 = = 5 3 SANITARY DRAINAGE WB no 400 onder ground pa Sele [06 o5-< Dee Ne saurst;t00 ar uxal 3% 8 | 1920-1 (RPO:- Lot 5 on RP66617
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0110 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 824 KB (small file)
- File type
No other editions are linked here.