Original source · versioned page text
2018-07-10 Planning & Environment Committee Agenda
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 JULY 2018
The applicant has also provided a Tree Protection Plan (TPP) prepared by Myles Baldwin Design
Rev D 06/04/2018. An amended Construction Management Plan (CMP) has also been provided.
The plans are amended versions of the plans which formed part of the court settlement for the
lower deck adjacent to the road frontage.
The reports have been reviewed and the recommendations are generally supported. The
applicant has advised that all works and storage of equipment and materials will occur within the
area excavated for the pedestrian access tunnel. Accordingly, there will be no further impact on
vegetation.
Built form
The built form of the development will be consistent with the requirements of the Noosa Plan as
the proposed design modifications will not substantially change the existing approval.
The proposed works do not contribute to gross floor area as the definition of gross floor area
excludes lift shafts and floor areas located in a basement. The proposed works will result in a
minor increase to site cover related to the footprint of the lift shaft however the total site cover will
remain below that permitted by the planning scheme.
4.2. Referral Agencies
The application was not required to be referred to any Referral Agencies.
4.3. Other Referrals
The application was forwarded to the following internal Council officers:
Environment Officer
5. CONCLUSION & REASONS FOR DECISION
The application seeks to change the existing development approval for a dwelling to include a lift
and subterranean access path. The works, which have already commenced, have occurred in
the root zone of a significant tree and result in the removal of planted understorey vegetation.
The tree has been assessed by an arborist, engaged by Council officers. The arborist has
provided recommendations to address the on-going maintenance and safety of the tree, which
may be included as permit conditions. The on-going maintenance of the vegetated backdrop to
main beach is addressed through permit conditions incorporating amendments to the existing
Tree Protection Plan and Construction Management Plan. It is therefore recommended that
Council support the proposed changes.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services X Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service X Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture X Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 40 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.