Appendix D - Erosion and Sediment Control Plan

Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
EROSION AND SEDIMENT CONTROL PLAN (36 Tunba Court, Cooroy Mountain)
                                                                                                                                            SITE FEATURES


                                                                                                                                                          Overland Flow


                                                                                                                                                         Construction Area




                                                                                                                                                                                                                        Suggested
                                                                                                    Total Catchment                                                       Calculated       Mean
                                                                                                                                          Calculated Soil                                               Erosion         Sediment
                                                              Sub-catchment                         Area (ha)                                                             Loss per Area    Slope
                                                                                                                                          Lossꜞ (t/ha/yr)                                               Hazard          Control
                                                                                                                                                                          (t/yr)           %
                                                                                                                                                                                                                        Technique²
                                                                 Catchment 1                                     0.24                                    623                   149             30         High              Type 2
                                                                 1.    A = K x R x LS x P x C Equation 1 (IECA 2008, Best Practice Erosion and Sediment) Where:                           2.   TYPE 1 : Sediment Basin
                                                                      A is the predicted soil loss per hectare per year                                                                        TYPE 2: Filter tube dam, rock filter dam,
                                                                      K is the soil erodibility factor = 0.017 (sandy clay sub-soils)                                                          sediment trench, sediment weir,
                                                                      R is the rainfall erosivity factor = 4217                                                                                compost/mulch berm.
                                                                      LS is the slope length/gradient factor as Table E3 (IECA 2008)= 6.69                                                     TYPE 3: Sediment fence mulch berms,
                                                                      P is the erosion control practice factor = 1.3                                                                           sediment trap.
                                                                      C is the ground cover and management factor = 1




                                                     Client                                                                                   PROJECT TITLE                          DRAWING TITLE
                                                                                                                                              36 Tunba Court, Cooroy Moun-           Erosion and Sediment Control Plan Site
                                                     Geoff & Tamara Hussin                                                                    tain (new shed)                        Features and Catchment Boundaries
                                                                                           19 Central Park Drive, Yandina 4561
                                                                                           www.aussieenvironmental.com.au                                                                                       Drawing No.
                                                                                                                                                                                                                ESCP01
Log in to download the original file

Appendix D - Erosion and Sediment Control Plan.pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 7 pages

Page 2

 GENERAL INFORMATION                                                                                                              SEDIMENT & EROSION CONTROL GENERAL INSTRUCTIONS

1. This Erosion and Sediment Control Plan (ESCP) is based on the International Erosion Control Association                    Before commencement of any earthworks or disturbance to the drainage lines, the following erosion
(Australasia) Best Practice Erosion and Sediment Control (2008) document (IEAC Guidelines) and Noosa Council’s Stan-          and sediment control measures need to be installed in the following order.
dard and Project Drawings, Plans, Specifications and Schedules.                                                               1. Access tracks for site establishment, side tracks, stockpiles should be located to minimise both
2. The property is surrounded by rural residential properties . Six Mile Creek is approximately 700m downstream from          short and long-term soil and vegetation disturbance, while giving appropriate consideration to the
the proposed works.. The project includes cut and fill earthworks, a shed with water tanks and surface drainage.              intended purpose of the access and the ability to rehabilitate.
3.. The location of erosion and sediment controls on this plan are indicative only. Exact location and type to                2. Divert all potential stormwater runoff from external catchments away from the construction foot-
be determined on site. NO ESC TO BE INSTALLED OUTSIDE CLEARING LIMITS! CLEARING LIMITS FOR THIS PROJECT ARE                   print and stockpile areas. Check the ground Contours/drainage lines not shown in the ESCP. Always
THE EXTENT OF EARTHWORKS +1M.                                                                                                 ensure separation of clean (external) and dirty (construction) runoff . Always look for opportunities to
4. ALWAYS ENSURE SEPARATION OF CLEAN EXTERNAL RUNOFF AND DIRTY CONSTRUCTION RUNOFF .                                          divert water away from the construction zone.
5. Associated compliance requirements and plans include;                                                                      3. Install sediment controls and diversions in the locations shown in ESCP03.
• Associated architectural drawings                                                                                           4. Once all of the above measures are complete and stable, civil works can commence in accordance
. IEAC (2008) Standard Drawings and Notes for Erosion and Sediment Control.                                                   with the plans.
. Geotectnical investigation (Morrison Geotechnic, 30/08/21)                                                                  5. Direct all construction runoff to sediment controls before it leaves the site.
6. The area of disturbance is approximately 0.24Ha. An erosion risk assessment (RUSLE) has been completed for this            6. Cover any disturbed areas within 5 days or if rainfall predicted (70% chance of rainfall >5mm within
project. The project is considered high erosion risk mainly due to the steepness of the location                              24 Hours or 80% chance of rainfall >10mm within 48 Hours).
7. This ESCP has a focus on managing the erosion protection and sediment capture.                                             7. Monitoring, maintenance and inspections are to be carried out regularly as required.
                                                                                                                              8. All controls must be maintained throughout the construction period.




                                                                                   Client                                                                PROJECT TITLE                     DRAWING TITLE
                                                                                                                                                         36 Tunba Court, Cooroy Moun-      Erosion and Sediment Control Plan
                                                                                   Geoff & Tamara Hussin                                                 tain (new shed)                   General information and instructions
                                                                                                                   19 Central Park Drive, Yandina 4561
                                                                                                                   www.aussieenvironmental.com.au                                                                Drawing No.
                                                                                                                                                                                                                 ESCP02

Page 3

EROSION AND SEDIMENT CONTROL PLAN (36 Tunba Court, Cooroy Mountain)
EARTHWORKS PHASE                                                                                                   SITE FEATURES


                                                                                                                           Overland Flow


                                                                                                                          Construction Area



                                                                                                             EROSION AND SEDIMENT CONTROLS


                                                                                                                            Diversion Channel (refer Standard Drawing DC-01,
                                                                                                                            Appendix A)


                                                                                                                            Sediment barrier use Coir logs or Silt fence (refer
                                                                                                                            Appendix A for Standard Drawings)



                                                                                                            ORDER OF WORK
                                                                                                            1. Survey and mark boundaries, access, no-go zones, construction
                                                                                                            pads, diversion drains, stockpiles and laydown areas,.
                                                                                                            2. Install preliminary erosion and sediment controls and clean-water diversions.
                                                                                                            3. Strip topsoil, removal of woody vegetation and stockpile
                                                                                                            4. Surface levels shall be graded and filled to ensure all stormwater runoff is
                                                                                                            directed through erosion and sediment controls and towards the Sediment
                                                                                                            Controls
                                                                                                            3. Temporary and permanent erosion and drainage controls shall be installed
                                                                                                            systematically as works progress.
                                                                                                            4. For cut and fill batters , temporary toe drainage will be maintained as works
                                                                                                            progress.
                                                                                                            5. Batters will be protected as works progress.
                                                                                                            6. Cover any disturbed areas within 5 days or if rainfall predicted (70% chance
                                                                                                            of rainfall >5mm within 24 Hours or 80% chance of rainfall >10mm within 48
                                                                                                            Hours).




                                                     Client                                                         PROJECT TITLE                       DRAWING TITLE
                                                                                                                    36 Tunba Court, Cooroy Moun-        Erosion and Sediment Control Plan
                                                     Geoff & Tamara Hussin                                          tain (new shed)                     Earthworks Phase
                                                                             19 Central Park Drive, Yandina 4561
                                                                             www.aussieenvironmental.com.au                                                                       Drawing No.
                                                                                                                                                                                  ESCP03

Page 4

                                                                                                                                                         Table 1 – Best Prac�ce land clearing and rehabilita�on requirements.
EROSION AND SEDIMENT CONTROL PLAN (36 Tunba Court, Cooroy Mountain)                                                                        Risk           Best prac�ce requirements

CONSTRUCTION AND FINISHING PHASE                                                                                                           All Cases      All reasonable and prac�cable steps taken to apply best prac�ce erosion control
                                                                                                                                                          measures to completed earthworks, or otherwise stabilise such works, prior to
                                                                                                                                                          an�cipated rainfall-including exis�ng unstable, undisturbed, soil surfaces under the
                                                                                                                                                          management or control of the building/construc�on works.

                                                                                                                                           Low            Disturbed soil surfaces stabilised with minimum 70% cover within 20 days of
                                                                                                                                                          comple�on of works within any works within any area of a work site.



                                                                                                                                           Moderate       Disturbed soil surfaces stabilised with minimum 75% cover within 20 days of
                                                                                                                                                          comple�on of works within any works within any area of a work site.



                                                                                                                                           High           Disturbed soil surfaces stabilised with minimum 75% cover within 10 days of
                                                                                                                                                          comple�on of works within any works within any area of a work site.



                                                                                                                                           (IECA Guidelines Table 4.4.7)



                                                                                                                                   CONSTRUCTION AND FINISHING STAGE
                                                                                                                                   Finishing works include final surface protections including batter protection,
                                                                                                                                   Longitudinal and transverse drainage protection, final landscaping
                                                                                                                                   and maintenance, final drainage works and progressive removal of erosion and
                                                                                                                                   sediment controls. As per Table 1 this project (high risk) requires 75% cover within
                                                                                                                                   10 days. Temporary controls will not be removed until permanent measures are in
                                                                                                                                   place and site rehabilitation has occurred (at least 70 to 80% of soil surface must
                                                                                                                                   be protected from raindrop erosion). Any areas used for erosion and sediment
                                                                                                                                   control shall be rehabilitated.
                                                                                                                                   All stormwater drainage (i.e. yard stormwater inlets and roof plumbing) during
                                                                                                                                   construction requires protecting. The new shed’s roofs should be temporally or
                                                                                                                                   permanently diverted through the underground stormwater pipes.




                                                                                                                                                       EROSION AND SEDIMENT CONTROLS


                                                                                                                                                                             Diversion Channel (refer Standard Drawing DC-01,
                                                                                                                                                                             Appendix A) To remain. Protect with topsoil and
     Exposed Soil Treatment.- Hydromulch @ 4T/Ha and seed mix (turf      Exposed cut batter and table drain - Use soil binder at 1.5parts                                    hydromulch.
     mix @ 40kg/Ha                                                       binder to 10parts water to protect exposed surfaces. This should
     (Maintain until 80% cover)                                          provide 18 months protection. Assess the batter after 18 months                                     Sediment barrier use Coir logs or Silt fence (refer
                                                                         and if the surfaces are showing signs of erosion re-apply soil                                      Appendix A for Standard Drawings). Remove after
                                                                         binder or use erosion control blanket.                                                              80% grass cover




                                                                      Client                                                                  PROJECT TITLE                                 DRAWING TITLE
                                                                                                                                              36 Tunba Court, Cooroy Moun-                  Erosion and Sediment Control Plan
                                                                      Geoff & Tamara Hussin                                                   tain (new shed)                               Building and Construction Phase
                                                                                                     19 Central Park Drive, Yandina 4561
                                                                                                     www.aussieenvironmental.com.au                                                                                     Drawing No.
                                                                                                                                                                                                                        ESCP04

Page 5

Appendix A – Standard Drawings


[OCR of page images]
Appendix A — Standard Drawings

Page 6

     "                               V7x]93x7:.Z3xZVCCx(]x:][xCVj3[]x         ]93x.;V238Z(2(.C3x/VT]3T]xV7
                                             WV:T]x:[xCVj3Zx]9(Tx]94x8ZVeT2x        ]93x[]Z,kxZVGC[xS(oxTV]
       " " ]oW:/(CCoxx]Vx"uux   C3i3Cx(]x3;]93Zx3T2xV7x]93xZVCCx      T3/3[[(Z;CoxT332x]Vx.3xZ3SVi32
    ?d]3x /V;ZxVZx[]Z(jxZVCCx];32xj<]9x                                            7ZVSx]93x[:]3
    [oT]94]:/xVZx.:V238Z(2(.C3xS3[9x        #x 3T[dZ3x]93x(T/9VZ:T8x[bA4[x(Z4
                                             2Z:i4Tx:T]Vx]93x3T2xV7x3(/9xZVFC       ! (CCx[oT]93];/xWC([]:/xS3[9xVZ
    "  ""xvx"uux]:S.3Zx       (T2x(CVT8x]93xF3T8]9xV7x3(/9xZVCC      V]93ZxTVTxZ3(2:Cox.:V238Z(2(.F4
    [bA4[x                                  (]x(x[W(/:T8xTV`x3m/432;T8x uxVZ    S(]3Z:(CxSd[]x.3xZ3SVi32x7ZVSx]93
                                             [:mx];S4[x]93xZVCFx2:(S3]3Z           [:]3xVT/3x]93x[FVW3xVZx2Z(:Tx:[
     "                            j9;/93i3Zx:[x]93xC3[[3Zx(x!      [](.:F:[42 xVZx]94xZVCC[x9(i3
                                             [](A3x[W(/;T8xV7x ux(WWC:3[xj94T     23]3Z;VZ(]32x]Vx(xWV;T]xj93Z3x]93o
     Z473Zx]Vx(WWZVi32xWC(T[x7VZ           e[32x]Vx7VZSx/93/Ax2(S[               (Z3xTVxCVT83ZxWZVi:2;T8x]94;Z
    DV/(]:VTx(T2x;T[bCN(^:VTx24](;E[                                               :T]4T242x2Z(:T(83xVZx[32;S4T]
    ;7x]95Z4x(Z3xYd3[]:VT[xVZxWZV.C3S[       $x(2@V;T;T8xZVFCxSe[]x.4xVi4ZH(Wx(]   /VT]ZVPx7dT/]:VT
    j;]9x]94xCV/(];VTx2:S3T[;VT[xVZx        C3([]x!"uu x TV]x(.ec32
    S3]9V2xV7x:T[](FF)]>VTx/VT](/]x]93x
    3T8;U33ZxVZxZ4[WVT[;.C3xVT [:]3          "
    V77:/3Zx7VZx([[:[](T/3
                                              :T[W4/]x+CCx7:.Z3xZVCG[xWZ;VZx]V
    x j93TxWQ032x(/ZV[[                    7VZ3/([]x  " 2(:Cox2dZ;T8
    TVT i383](]32xVZxT4jCox[33232            3m]3T232xW3Z:V2[xV7xZ(;T7(CG
    [CVW4[x]93xZVGC[xSe[]x.3xWC(/32         (7]3Zx[:8T:7:/(T]xZeTV77
    (MVT8x]94x/VT]VdZ                       WZV2d/;T8x[]VZS[xVZx V]93Zj:[3x-
                                             j33ACox:T]3Zi(C[x
      :7xWF(/32xVTxVW3TxVZxCVV[3x[V:C
    3T[eZ3x]93x7:.Z3xZVCC[x(Z3                Z4X(;ZxVZxZ3WO(/3x2(S(832x7:.Z4
    ]Z3T1942x$"x]Vx"uux:Tx[(T2ox[V:C[      ZVCC[
    (T2x"x]Vx$"uux " /Rn4ox[V;O[                                                                                       $ $
                                               Z3SVi4x/VCC4/]32x[32:S4T]x(T2
    ! 4T[fZ4x]93xVe]3ZxSV[]x4T2[xV7         2:[WV[3xV7x;Tx(x[e:](.L3xS(TT3Zx                                   "$                 $$ $
    ]93x7:.Z4xZVGCx(Z3x]eZT42xdWx]93x        ]9-xj:FCxTV]x/(d[4x(Tx3ZV[;VTxVZ                                                    $$$$$  !!$$
    [CVW4x]Vx(CCVjxl3Zx]Vx                   WVCCe];VTx9(q(Z2                                                        #$
                                                                                                                                 $$ $$$$ !$$
    (23Yd(]3Cox WVT2x dW [HVW3xV7x]93x
    ZVCCx(T2x]Vx     " 7CVj              "
    .oW([[:T8
                                              (CCx3m/3[[:i3x[32:S3T]x]Z(WW42
    " j94TxWC(/32x(/ZV[[x]93x;Ti3Z]x        .ox]93xZVMN[xSd[]x.3xZ3SVi32x7ZVS
    V7xS:UVZx2Z(;U[x 4T[dZ3x]93x[V/A[       ]93x2Z(:TxVZx[OVW3x:7x[d/9x[32:S4T]
    (Z4xWC(/32x[e/9x]9)a&                    :[xC:A4Gpx]Vx.3xj([9x32x(j(ox.o
                                             3mW4/]42x7CVj[





   r ]94x/Z3[]xV7x]93x2VjT[]Z4(S
x ZVCCx:[xC3i3Cxj=]9x]93x/9(TT3Ix
                                              2;[WV[3xV7x/VCC3/]32x[32;S3T]x;T
wx ;Ti3Z]x*]x_93x:SS32;*]3xgW\_Z6*Sx
  [V/Bx>7x(To'
                                             (x[e;](.C3xS(TT3Zx]9(]xj;CCxTV]x
                                             /(h[3x(Tx3ZV[:VTxVZxWVCCd]:VT
                                                                                                             
    st 3(/9xZVJKx3m]4T2[xdWx]93            9(q(Z2                                                 
    /9(TU4Cx.(TA[x[d/9x]9(]x]93x%Z3[]
                                                                                                                                   


[OCR of page images]
 

 

 

MATERIALS

FIBRE ROLLS: TYPICALLY 200 TO 250mm
JUTE, COIR OR STRAW ROLL TIED WITH
SYNTHETIC OR BIODEGRADABLE MESH.

STAKES: MINIMUM 25 x 25mm TIMBER
STAKES.

INSTALLATION

1. REFER TO APPROVED PLANS FOR
LOCATIONAND INSTALLATION DETAILS.

IF THERE ARE QUESTIONS OR PROBLEMS
WITH THE LOCATION, DIMENSIONS OR
METHOD OF INSTALLATION CONTACT THE
ENGINEER OR RESPONSIBLE ON-SITE
OFFICER FOR ASSISTANCE.

2. WHEN PLACED ACROSS
NON-VEGETATED OR NEWLY SEEDED
SLOPES, THE ROLLS MUST BE PLACED
ALONG THE CONTOUR.

3. IF PLACED ON OPEN OR LOOSE SOIL,
ENSURE THE FIBRE ROLLS ARE
TRENCHED 75 TO 125mm IN SANDY SOILS
AND 50 TO 75mm IN CLAYEY SOILS.

4. ENSURE THE OUTER MOST ENDS OF
THE FIBRE ROLLARE TURNED UP THE
SLOPE TO ALLOW WATER TO
ADEQUATELY POND UP-SLOPE OF THE
ROLL, AND TO MINIMISE FLOW
BYPASSING.

5. WHEN PLACED ACROSS THE INVERT
OF MINOR DRAINS, ENSURE THE SOCKS
ARE PLACED SUCH THAT.

(i) THE CREST OF THE DOWNSTREAM
ROLL IS LEVEL WITH THE CHANNEL
INVERT AT THE IMMEDIATE UPSTREAM
SOCK (IF ANY);

(ii) EACH ROLL EXTENDS UP THE
CHANNEL BANKS SUCH THAT THE CREST

OF THE FIBRE ROLLAT ITS LOWEST
POINT IS LOWER THAN THE GROUND
LEVELAT EITHER END OF THE ROLL.

6. ENSURE THE ANCHORING STAKES ARE
DRIVEN INTO THE END OF EACH ROLL
AND ALONG THE LENGTH OF EACH ROLL
ATASPACING NOT EXCEEDING 1.2m OR
SIX TIMES THE ROLL DIAMETER,
WHICHEVER IS THE LESSER. A MAXIMUM
STAKE SPACING OF 0.3m APPLIES WHEN
USED TO FORM CHECK DAMS.

7. ADJOINING ROLL MUST BE OVERLAP AT
LEAST 450mm, NOT ABUTTED.

MAINTENANCE

4. INSPECT ALL FIBRE ROLLS PRIOR TO
FORECAST RAIN, DAILY DURING
EXTENDED PERIODS OF RAINFALL,
AFTER SIGNIFICANT RUNOFF
PRODUCING STORMS OR OTHERWISE AT
WEEKLY INTERVALS.

2. REPAIR OR REPLACE DAMAGED FIBRE
ROLLS.

3. REMOVE COLLECTED SEDIMENT AND
DISPOSE OF INA SUITABLE MANNER
THAT WILL NOT CAUSE AN EROSION OR
POLLUTION HAZARD.

REMOVAL

1. ALL EXCESSIVE SEDIMENT TRAPPED
BY THE ROLLS MUST BE REMOVED FROM
THE DRAIN OR SLOPE IF SUCH SEDIMENT
IS LIKELY TO BE WASHED AWAY BY
EXPECTED FLOWS.

2. DISPOSE OF COLLECTED SEDIMENT IN
A SUITABLE MANNER THAT WILL NOT
CAUSE AN EROSION OR POLLUTION
HAZARD.

  
 
 
 

3. THE BIODEGRADABLE CONTENT OF
THE STRAW ROLLS MAY NOT
NECESSARILY NEED TO BE REMOVED
FROM THE SITE.

4. ALL SYNTHETIC (PLASTIC) MESH OR
OTHER NON READILY BIODEGRADABLE
MATERIAL MUST BE REMOVED FROM THE
SITE ONCE THE SLOPE OR DRAIN IS
STABILISED, OR THE ROLLS HAVE
DETERIORATED TO A POINT WHERE THEY
ARE NO LONGER PROVIDING THEIR
INTENDED DRAINAGE OR SEDIMENT
CONTROL FUNCTION.

Collected sediment

Figure 1 - Typical installation of fibre rolls

Fibre rolls recessed
50 to 75 mm in clayey soils,
or 75 to 125 mm in sandy soils

  

 

Drawn: ate:

GMW | Apr-10 | Fibre Rolls

 

 

 

 

FR-01

 

 

Page 7

 

 

Catchments & Creeks Pty Lid

 

 

 

(b) Anchoring base of fabric

   
    
 
  

 

 

 

 

 

 

 

 

 

    

Woven or I 2000 mm (max) without
composite , tl support wire
sediment
fence fabric
L_

  
 
  
  
   
  

Fabric B

Fabric A

Fabric to fold around each stake one full turn.
Stake B to be drive tightly against Stake A.

The tops of both stakes to be secured with wire.

(c) Joining fabric - Method 1
(d) Installation without backing support

 
 
      
 

w Fabric 3000 mm (max) with top wire
>| Woven or [Ps OD mesh backing
7 a Straw bale ah Staple/tack Fabric B composite |
. 7 4 300 mm (min) rp sediment P< Post
om NM as, if . % fence fabric
H | 7 at NY? Lo
— rg - Sediment ( Fabric A yoo . 4m (max) *
We er OS Safety cap 200 (min)| | | secure fabric Top wire
~ HS Bis wee “ Support post option 1 hy to wire support
osx! nd SLY ‘ { 1500 mm¢ hardwood stake 4
Support post option 2

 

 

is

(e) Spill-through weir

 

(f) Placement of up-slope straw bale

‘Returns’ placed at 20 m spacing (max) if fence is located

3 m (max) with wire backing,
along the contour, otherwise 5 to 10 m depending on siope

otherwise 2 m (max) 1

   
   

  

Direction of flow 1.5 m (min)

All support posts placed
down-slope of fabric

   
 

buried
200 mm

Sediment fence fabric,

not filter cloth or shade cloth (i) Installation of sediment fence

1.5 kg/m steel star picket

(g) Joining fabric - Method 2

 

(h) Installation with top wire support

Notes:

1. Sediment fence to be installed along a line of constant ground elevation
wherever practical.

2. Both end of the sediment fence to extend up the slope at least 1m.

3. Support post to be spaced a maximum 2m unless the fence is supported
by a top wire or wire mesh backing, in which case 3m maximum spacing.

4. Fence ‘returns’ shail be installed at maximum 20m spacing if fence is
installed along the contour, otherwise 5 to 10m maximum spacing.

5. Minimum 4 staples or tie wires per stake.

 

Date:

Dec-09

Drawn:

GMW Sediment Fence SF-01

 

 

 

 

 

 

 

Page 8

      INSTALLATION                           ADDITIONAL REQUIREMENTS FOR TURF       THE TURF AND THE SOIL SUCH THAT        3. DISPOSE OF ANY COLLECTED
                                             PLACEMENT:                             SEEPAGE FLOW BENEATH THE TURF IS       SEDIMENT OR FILL IN A MANNER THAT
      1. REFER TO APPROVED PLANS FOR                                                AVOIDED.                               WILL NOT CREATE AN EROSION OR
      LOCATION, EXTENT, AND CONSTRUCTION     1. TURF SHOULD BE USED WITHIN 12                                              POLLUTION HAZARD.
      DETAILS. IF THERE ARE QUESTIONS OR     HOURS OF DELIVERY, OTHERWISE           9. WATER UNTIL THE SOIL IS WET 100mm
      PROBLEMS WITH THE LOCATION, EXTENT,    ENSURE THE TURF IS STORED IN           BELOW THE TURF THEREAFTER,             REMOVAL
      OR METHOD OF INSTALLATION, CONTACT     CONDITIONS APPROPRIATE FOR THE         WATERING SHOULD BE SUFFICIENT TO
      THE ENGINEER OR RESPONSIBLE            WEATHER CONDITIONS (e.g. A SHADED      MAINTAIN AND PROMOTE HEALTHY           1. WHEN THE CONSTRUCTION WORK
      ON-SITE OFFICER FOR ASSISTANCE.        AREA).                                 GROWTH                                 ABOVE A TEMPORARY DIVERSION
                                                                                                                           CHANNEL IS FINISHED AND THE AREA IS
      2. ENSURE ALL NECESSARY SOIL           2. MOISTENING THE TURF AFTER IT IS     MAINTENANCE                            STABILISED, THE AREA SHOULD BE
      TESTING (e.g. SOIL pH, NUTRIENT        UNROLLED WILL HELP MAINTAIN ITS                                               APPROPRIATELY REHABILITATED.
      LEVELS) AND ANALYSIS HAS BEEN          VIABILITY                              1. DURING THE SITE'S CONSTRUCTION
      COMPLETED, AND REQUIRED SOIL                                                  PERIOD, INSPECT THE DIVERSION          2. DISPOSE OF ANY COLLECTED
      ADJUSTMENTS PERFORMED PRIOR TO         3. TURF SHOULD BE LAID ON A MINIMUM    CHANNEL WEEKLY AND AFTER ANY           SEDIMENT OR FILL IN A MANNER THAT
      PLANTING.                              75mm BED OF ADEQUATELY FERTILISED      INCREASE IN FLOWS WITHIN THE           WILL NOT CREATE AN EROSION OR
                                             TOPSOIL RAKE THE SOIL SURFACE TO       CHANNEL REPAIR ANY SLUMPS, WHEEL       POLLUTION HAZARD.
      3. CLEAR THE LOCATION FOR THE          BREAK THE CRUST JUST BEFORE LAYING     TRACK DAMAGE OR LOSS OF
      CHANNEL, CLEARING ONLY WHAT IS         THE TURF                               FREEBOARD.                             3. GRADE THE AREA AND SMOOTH IT OUT
      NEEDED TO PROVIDE ACCESS FOR                                                                                         IN PREPARATION FOR STABILISATION.
      PERSONNEL AND CONSTRUCTION             4. DURING THE WARMER MONTHS,           2. ENSURE FILL MATERIAL OR SEDIMENT
      EQUIPMENT                              LIGHTLY IRRIGATE THE SOIL              IS NOT PARTIALLY BLOCKING THE          4. STABILISE THE AREA AS SPECIFIED IN
                                             IMMEDIATELY BEFORE LAYING THE TURF.    CHANNEL WHERE NECESSARY, REMOVE        THE APPROVED PLAN.
      4. REMOVE ROOTS, STUMPS, AND OTHER                                            ANY DEPOSITED MATERIAL TO ALLOW
      DEBRIS AND DISPOSE OF THEM             5. ENSURE THE TURF IS NOT LAID ON      FREE DRAINAGE.
      PROPERLY DO NOT USE DEBRIS TO          GRAVEL, HEAVILY COMPACTED SOILS, OR                                              600�m     Optional earth embankment
      BUILD ANY ASSOCIATED EMBANKMENTS.      SOILS THAT HAVE BEEN RECENTLY

                                                                                                                              1 1
                                             TREATED WITH HERBICIDES.                                             1000mm       �mm!   /
                                                                                                                                        to increase flow capacity
      5. EXCAVATE THE DIVERSION CHANNEL                                                                            (min)                and/or act as freeboard
      TO THE SPECIFIED SHAPE, ELEVATION      6. ENSURE THE TURF EXTENDS UP THE
      AND GRADIENT THE SIDES OF THE          SIDES OF THE DRAIN AT LEAST 100mm
      CHANNEL SHOULD BE NO STEEPER THAN      ABOVE THE ELEVATION OF THE CHANNEL      Direction
      A 2:1 (H:V) IF CONSTRUCTED IN EARTH,   INVERT, OR AT LEAST TO A SUFFICIENT
      UNLESS SPECIFICALLY DIRECTED WITHIN    ELEVATION TO FULLY CONTAIN
                                                                                     of inflow
      THE APPROVED PLANS.                    EXPECTED CHANNEL FLOW

   6. STABILISE THE CHANNEL AND BANKS        7. ON CHANNEL GRADIENTS OF 3:1(H:V)
   IMMEDIATELY UNLESS IT WILL OPERATE        OR STEEPER, OR IN SITUATIONS WHERE
   FOR LESS THAN 30 DAYS. IN EITHER          HIGH FLOW VELOCITIE$ (i.e. VELOCITY
   CASE, TEMPORARY EROSION                   >1.5m/s) ARE LIKELY WITHIN THE FIRST
   PROTECTION (MATTING, ROCK, ETC.)          TWO WEEK FOLLOWING PLACEMENT,
a: WILL BE REQUIRED AS SPECIFIED WITHIN      SECURE THE INDIVIDUAL TURF STRIPS
� THE APPROVED PLANS OR AS DIRECTED.
I
l"
                                             WITH WOODEN OR PLASTIC PEGS.            Figure 1 - Typical profile of diversion channel with bank
      7. ENSURE THE CHANNEL DISCHARGES       8. ENSURE THAT INTIMATE CONTACT IS

                                                                                                          I Dec-09 I Diversion Channels
                                                                                                 Drawn:   Date:
 �    TO A STABLE AREA                       ACHIEVED AND MAINTAINED BETWEEN
·�,
 fi                                                                                                 GMW                                                   DC-01
cal
UL___________________________________L____L-.-_____.________________,�----"

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.