Council archive · source document
ver c-1303-10-21 · OPW15/0142
Attached to the e-mail OPW15/0142 Response to Information Request.
LECEND N\
eS PLACE TEMPORARY ROCK ACCESS STD DWG N\
SD 6-14 WITH CATTLE GRID & TWIN 375¢
PIPES AS DIRECTED BY ENGINEER
EXTENTS OF EXCAVATION. WHEN 1:2
TOPSOIL & MULCH. WHEN 1:4 TOPSOIL
AND TURF (AS PER LANDSCAPE PLANS).
EXTENTS OF FILLING. TOPSOIL 50mm THICK & TURF:
(AS PER LANDSCAPE PLANS).
WET DAM SEDIMENT BASIN TO STD DRG SD 6-4.
WITH 0.4 STORAGE, 0.6 SETTLING & 0.5 WEIR ON
DOWNSTREAM END
EARTH BANK DIRTY WATER DIVERSION (OR
SEDIMENT FENCE ALTERNATIVE) TO STD DWG
“HH HHH
SD 5-5, WRAP MOUND IN GEOTEXTILE OR
WEED MAT
wn SEDIMENT FENCE TO STD DWG SD 6-8 /,
es
—_ DIRECTION OF SEDIMENT FLOW/FINISHED ALLOTMENT FLOW
8 GEOTEXTILE SAUSAGE INLET FILTER TO STD
DWG SD 6-11
\olm
ONSITE EROSION & SEDIMENT CONTROL
OBJECTIVE:
TIME FROM COMMENCEMENT OF DISTURBANCE TO REHABILITATION TO BE <3 MONTHS.
CLEARANCE:
1, PLACE CLEAN WATER DIVERSION AND SEDIMENT BASINS IN PLACE BEFORE COMMENCING
STRIPPING.
2. MINIMISE DISTURBANCE BEYOND EXTENT OF WORK TO 2m (5m MAXIMUM).
3. SLASH AND STORE GRASS FOR MULCH, STRIP AND STOCK PILE TOPSOIL.
4. MULCH CLEARED VEGETATION FOR RE-USE AND STOCKPILE MULCH AND TOPSOIL AWAY
FROM CONCENTRATED STORMWATER FLOW PATHS.
5, STOCKPILE ON SITE
* DIVERT OVERLAND STORMWATER AROUND STOCKPILES BY BUNDS
* SILT FENCE IS TO BE PLACED ON DOWNSLOPE OF STOCKPILE
* SEPERATE FROM REMAINING VEGETATION AREAS BY MINIMUM 2m
* IF STOCKPILES ARE TO BE LEFT FOR 2 WEEKS, COVER WITH GEOFABRIC OR
EQUIVALENT
6. STORE EXTRA MATERIALS FOR EMERGENCY EROSION AND SEDIMENT CONTROL ON SITE
(i.e. MULCH, GYPSUM, ROCKS, GEOFABRIC, SAND BAGS).
7. IF WATER RELEASED FROM SITE IS, OR IS LIKELY TO EXCEED 50mg\L: TAKE FURTHER
IMMEDIATE REMEDIAL ACTION BEFRE RELEASING WATER.
8. ANY DIVERSION DRAINS WHICH DROP DOWN BATTERS MUST BE GEOTEXTILE LINED
9. EMBANKMENTS OR BATTERS NOT BEING WORKED MUST BE STABILISED IMMEDIATELY THEY
ARE PREPARED.
10. STORE GYPSUM ON SITE FOR MULTIPLE BASIN FILLS.
11, HOLD POINTS FOR ESCP.
* PRESTART MEETING
* SUBGRADE APPROVAL
* FINAL TRIM BASE APPROVAL
“=
es “SS
wea 1G =
BUILD BIO BASIN AND
SWALE EARLY AND USE AS
A DIRTY WATER DIVERSION
AND SEDIMENT BASIN.
(
\
LAY PIPE AND PIT PRIOR TO
EWKS SO THAT IT CAN ACT
AS A CLEAN WATER
DIVERSION
LAY GEOPTEXTILE SHUTES.
TO SWALES AT BIO BATTER
PS
1413
wearK,
ONS
Callaghan & Toth )
Civil, Environmental &
Hydraulic Engineers
PO BOX 2305
NOOSA HEADS 4567
i 6/41 Sunshine Beach Road
=I Phone 54749081, Fax 54749041
www.callaghanandtoth.com.au
designed [ADT | datum AHD DERIVED
drawn MM . PSM #
checked | AH Origin (BM) RL *
approved
SURVEYED BY
MAX WATTERSON & ASSOCIATES
PHONE 54 426 121
(——r ee ee
project
PROPOSED KABARA HOSTEL
EXTENSION, 20 TOPAZ STREET
COOROY
Jf
_—————————————SSSS
Client
NOOSA COUNCIL
$A aA
(OO
title
SEDIMENT & EROSION CONTROL
PLAN
Va
_
LOT 102 on SP236318
Parish of TEWANTIN
County of MARCH
NOOSA SHIRE COUNCIL
Locality of COOROY
—_
OT
SCALE
5 0 5 10 15 20 25m
1:500
SCALE BEFORE REDUCTION {A3}
SCALE SHOWN IS ORIGINAL DRAWING SCALE DO NOT SCALE
THIS DRAWING USE ONLY DIMENSIONS PROVIDED.
REVISIONS
A | PRELIMINARY ISSUE.
B | DRAINAGE ADDITIONS
ee eee ee ~~
FILES
COMPUTER DIRECTORY
XAJOBS\CT\...
FOR TENDER
Sheet 11of 12 sheets
drawing number
1303-20
date JULY 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ver c-1303-10-21.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.