Council archive · source document
Properly made submission (object) Valerie & Peter Beer MCU13/0092
,~
ENVIRONMENTAL ISSUES:
Significant negative impact will be imposed on local residents, in adjacent streets and on local community
facilities. Congestion, noise, traffic and general nuisance can be expected.
Visual impact should be a major consideration of council now & in the future. The design and layout of the
proposal are inferior to what could be achieved for the area.
Drainage has not been given any significant consideration by the proposer. Impact on the immediate natural
environment will be detrimental.
ENGINEERING & TRAFFIC ISSUES:
The current car parking amenity in the Peregian Beach area is inadequate & very poorly designed. Little
consideration has been given to safety & visual aesthetic, this development would increase the already damaged
appeal of the locale.
As identified in the council’s Information request, the traffic report is poorly considered and the response by the
proponent fails to adequately address the issues.
The roundabout at Peregian Beach and adjacent sections of the David Low Way are now at capacity during peak
periods & weekends. The impact of the proposed development on the area would be chronic from both a safety
and amenity perspective.
Council has a responsibility to ratepayers is to uphold the best interests of the community. Peregian
Beach remains one of the few communities left on the Sunshine Coast that has not been spoiled by
unnecessary development, please maintain the character of the area by firmly rejecting
this proposal.
Kind regards,
Valerie Beer
~.~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Properly made submission (object) Valerie & Peter Beer MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 965 KB (small file)
- File type
No other editions are linked here.