Council archive · source document
Engineering Information Response Letter · MCU20/0143
21 January 2021
SCG Ref: 30295(L1)
By email: [email protected]
The Macky Group Pty Ltd
C/- Adapt Town Planning + Development Management
PO Box 7618
SIPPY DOWNS Q 4556
Dear Sir/Madam
Re: MCU20/0143 and OPW20/0230 - Lot 30 RP92522 #6 Angler Street, Noosa Heads
We refer to Noosa Council’s recent information request dated 24 December 2020 and comment as follows: -
Issue 1 & 2 - Piling
As the project is still in preliminary design phase, a specialist piling contractor is yet to be engaged. We can
confirm that ground anchors will not be permitted without the neighbouring property owner’s written consent.
Ground monitoring devices will be used throughout installation be completed to ensure best possible building
practice. Dilapidation reports of all neighbouring dwellings will be completed prior to construction.
Issue 3 & 4 - Carparking
Vehicle movement paths have been shown on SCG Drawing No. 30295-OW5.1, we have revised this to include
the visitor bay.
Yours faithfully
Checked by:
TOM HARRINGTON SEAN RICHARDSON – RPEQ 5835
For and on behalf of For and on behalf of
SCG CONSULTING ENGINEERS SCG CONSULTING ENGINEERS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Information Response Letter.pdfRelated documentApplication case desk ↗
About this file
- File size
- 521 KB (small file)
- File type
No other editions are linked here.