13. The Institute of Engineers Australia Soil Erosion and Sediment Control Engineering Guidelines
for Queensland Construction Sites requires that clean stormwater is directed around disturbed
areas. The sediment and erosion control plan indicates that external catchment discharge will
be direced to the sediment basins during construction. Council is concerned that channelling
of external water to sediment basin will restrict the ability of the site to achieve required water
quality objectives during construction. Please revise the staging to allow clean external
catchment discharge to flow around undisturbed areas of the site and accordingly reduce the
quantity of water to manage within the sediment basins.
14. Indicate the volume of material to be ‘cut’ from the existing dams.
15. There is contradiction between the Smith + Tracy architects masterplan staging dwg no: 0805-
TP05 and Brown Consulting Bulk Earthworks layout plan dwg no: NO7058-DA07A. Please
ensure there is consistency between all drawings and indicate to Council the stage of
construction that the basins construction will commence and be finalised.
16. Provide plan of the developed site showing the overland flowpaths during ARI 100 year storm
in the events that major stormwater pipelines are fully blocked.
17. Please provide amended layout plan/s showing a truck turning area at the end Trading Post
Road generally in compliance with Noosa Shire Council’s Engineering Drawing 9025 or its
equivalent.
18. Council is not satisfied that the entire suite of turning path requirements has been
demonstrated on Drawing Number NO7058-DA12 Sheets 1-3. In this respect, please show-
turning paths for “car with caravan” for all carpark spaces shown on turning path 4. Also,
demonstrate the complete turning path for Garbage Trucks on Turning Path 3 and Turning
Path 5.
Traffic
19. Traffic matters are still being reviewed, with any additional information required to be
requested under separate cover.
Waste Management
9. Waste management shall comply with Council’s Planning Scheme Policy PSP9 Waste
Management. You are required to demonstrate in regard to the following:-
9.1. Demonstrate that the internal road network can cater for refuse vehicles, as it is
considered that individual on-site collection may occur.
9.2. Demonstrate that central waste disposal areas (ie. Residential Aged Care Facility and
Village Community Centre) provided within the site can cater a refuse vehicle to enter
and exit the site in forward direction without creating an unsafe situation for staff,
residents and visitors of the site.
9.3. Demonstrate the location of waste storage facilities at Residential Aged Care Facility
and Village Community Centre.
9.4. Demonstrate that the waste storage facilities at the Residential Aged Care Facility,
Village Community Centre and nodals are large enough to store waste and recycle
bins.
9.5. The location of bin wash down facilities is required to be shown on the proposal plans.
Under the provisions of the Integrated Planning Act 1997, you have three options available in
response to this Information Request. You may give the assessment manager (in this instance
Council) and each referral agency (if any):
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment manager and
each referral agency to proceed with the assessment of the application; or
3. a letter:
(i) stating that you do not intend to supply any of the information requested; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2007.00002398.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 21 KB (small file)
- File type
No other editions are linked here.