Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn a Dwelling House.
Reconfiguring a lot Code assessment
Landslide Hazard Overlay Code
Operational work Code assessment
associated with
If involving: Landslide Hazard Overlay Code
reconfiguring a lot
(a) earthworks exceeding 50m3 (other than the
placing of topsoil);
(b) vegetation clearing; or
(c) redirecting the existing flow of surface or
groundwater.
Operational work Code assessment
involving excavation or
If involving: Landslide Hazard Overlay Code
filling of land not
associated with a (a) earthworks exceeding 50m³ (other than the
material change of use placing of topsoil);
or reconfiguring a lot (b) vegetation clearing; or
(c) redirecting the existing flow of surface or
groundwater.
Table 5.9.9 Regional Infrastructure Overlay benchmarks and criteria
Development subject to Categories of development and assessment Assessment benchmarks for assessable
overlay development
Regional Infrastructure Overlay if in a water resource catchment and water supply buffer area
Material change of use, Code assessment
other than in an existing
If involving: Regional Infrastructure Overlay Code
building, and not
involving a dwelling (a) the establishment, expansion or upgrade of an
house on an existing lot onsite wastewater treatment system; or
or community residence (b) increasing the number of people living or
on an existing lot. working on site;
(c) a rural activity storing chemicals or livestock on
site
Reconfiguring a lot Code assessment
If increasing the number of lots Regional Infrastructure Overlay Code
Operational work Code assessment
involving excavation or
If involving: Regional Infrastructure Overlay Code
filling of land not
associated with a (a) excavating 100m³ or more of material; or
material change of use (b) filling land with 500m³ or more of material with
or reconfiguring a lot an average depth of 500mm or greater
Regional Infrastructure Overlay gas pipeline corridor and buffer area or major electricity infrastructure or adjoining major
electricity infrastructure
Material change of use, Code assessment
other than in an existing
Regional Infrastructure Overlay Code
building, and not
involving a dwelling
house or a community
residence, or animal
husbandry, or cropping
Reconfiguring a lot Code assessment
NOOSA PLAN 2020 Page 122 of 123
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.