Log in to see the plans as drawn Performance Outcomes Acceptable Outcomes
and landscaping of the site.
Environment, heritage and scenic amenity Table 6.3.2.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Environment, heritage and scenic amenity
PO22 AO22.1
Development: For landscape amenity reasons, cut or fill is less than 1.5 metres
(a) has minimal impact on the natural landform of the site; in depth relative to the ground level.
(b) does not lead to erosion or the transport of sediments off
AO22.2
site; and
Development does not result in sediment or other material
(c) does not lead to the disturbance of natural features, including building materials or waste products being deposited or
buildings or structures of cultural heritage significance. released into the road reserve, stormwater drain or adjacent
properties.
AO22.3
Development on a site adjoining a local heritage place respects
the cultural heritage significance of the place by mitigating any
adverse impacts on the setting or integrity of the heritage values.
Editor’s Note— Local heritage places are identified on the
Heritage and Character Areas Overlay maps in Schedule 2.
PO23 AO23.1
Development on sloping sites: Building and structures are not constructed on land with a slope
(a) is visually responsive to the natural topography and sits greater than 25%.
within the landscape rather than dominating it; and
(b) steps down slopes or uses suspended floor construction, AO23.2
minimising cut or fill and avoiding benching of the site. On sloping sites, split level buildings with small floorplates, that
step down the slope are used as an alternative to standard single
or double storey construction to minimise building bulk and
benching of the sites.
Editor's note refer to Figure 6.9.1A and Figure 6.9.1B
AO23.3
The distance between the ground level and the lowest part of the
floor of the building does not exceed 3 metres.
Earthworks and drainage Table 6.3.1.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Earthworks and drainage
PO24 AO24
Filling and excavation for operational works do not directly, Filling and excavation for operational works i s designed and
indirectly or cumulatively cause adverse impacts external to the constructed to ensure overland flow and/or flooding is not
development site by: worsened, impeded, or otherwise diverted to adversely affect other
(a) causing ponding of water on the site or nearby land; properties or downstream environments.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream or downstream; or
(c) adversely affecting the flow of water in any overland flow
path.
Figure 6.3.2.4 Streetscape Character & Building Bulk Medium Density Street
NOOSA PLAN 2020 Page 21 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.