Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                Acceptable Outcomes

  (a)    is visually responsive to the natural topography and sits    greater than 25% to protect scenic amenity and other landscape
         within the landscape rather than dominating it; and          qualities.

  (b)    steps down slopes or uses suspended floor construction,
                                                                      AO25.2
         minimising cut and fill and avoiding benching of the site.
                                                                      On sloping sites, split­level buildings, with small floorplates, that
                                                                      step down the slope are used as an alternative to slab on ground
                                                                      construction to minimise building bulk and benching of the sites.

                                                                      Editor's note­ Refer to Figure 6.9.1A and Figure 6.9.1B

                                                                      AO25.3
                                                                      The distance between the ground level and the lowest part of the
                                                                      floor of the building does not exceed 3 metres.



 Earthworks and drainage                  Table 6.3.1.3 Criteria for assessment (part)
  Performance Outcomes                                                Acceptable Outcomes
  Earthworks and drainage
  PO26                                                                AO26
  Filling and excavation for operational works do not directly,       Filling and excavation for operation works are designed and
  indirectly or cumulatively cause adverse impacts external to the    constructed to ensure overland flow and/or flooding is not
  development site by:                                                worsened, impeded, or otherwise diverted to adversely affect other
  (a)    causing ponding of water on the site or nearby land;         properties or downstream environments.

  (b)    increasing flooding, which adversely affects the safety or
         use of any land upstream or downstream; or
  (c)    adversely affecting the flow of water in any overland flow
         path.

  Figure 6.3.4.4 ­ Hastings Street Character outcome




  Figure 6.3.4.5 ­ Gympie Terrace/Mary Street/Thomas Street




NOOSA PLAN 2020                                                                                                                   Page 47 of 48
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6(PDF, 9MB).pdf · 9.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.