Skip to the record
Accept no imitations.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6

of 320

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                    Acceptable Outcomes
  Pedestrian and Cycling Connectivity
  PO55
  Convenient and legible connections are provided for pedestrians         No acceptable outcome provided
  and cyclists to the site, particularly having regard to linkages with
  existing and proposed public transport infrastructure, the open
  space network, centres and other community­related activities.


  PO56                                                                    AO56.1
  Public or semi­public spaces are integrated into the centre's           Public and semi­public spaces are located to ensure pedestrian
  pedestrian and cycle networks.                                          movement flows through the site and connects to the pedestrian
                                                                          and cycle networks.

                                                                          AO56.2
                                                                          Pedestrian arcades, laneways or enclosed thoroughfares are a
                                                                          minimum of 6 metres wide, provide a direct line of sight to a major
                                                                          pedestrian destination (major tenancy, car park, public place, etc.),
                                                                          and are not dead ends, narrow or circuitous.


 Environment and heritage                  Table 6.4.2.3 Criteria for assessment (part)
  Performance outcomes                                                    Acceptable Outcomes
  Environment and heritage
  PO57                                                                    AO57.1
  Development:                                                            Development does not result in sediment or other material
  (a)    has minimal impact on the natural landform of the site;          including building materials or waste products being deposited or
                                                                          released into the road reserve, stormwater drain or adjacent
  (b)    does not lead to erosion or the transport of sediments off
                                                                          properties.
         site;
  (c)    does not lead to the disturbance of natural features,          AO57.2
         buildings or structures of cultural heritage significance; and Development on a site adjoining a local heritage place respects
  (d)    does not visually impact on the cultural heritage              the cultural heritage significance of the place by mitigating any
         significance of the site .                                     adverse impacts on the setting or integrity of the heritage values.

                                                                          Editor’s Note— Local heritage places are identified on the
                                                                          Heritage and Character Areas overlay maps in schedule 2.
  PO58
  Uses are conducted in an environmentally responsible manner,    No acceptable outcome provided
  operating without deleterious impacts on immediate, surrounding
  or downstream communities, environments or environmental
  processes.


 Infrastructure          Table 6.4.2.3 Criteria for assessment (part)
  Performance outcomes                                                    Acceptable outcomes

  Infrastructure
  PO59
  Development is supported by adequate infrastructure and urban           No acceptable outcome provided
  services including reticulated water, sewerage, stormwater
  drainage, sealed roads, pathways and electricity and
  telecommunication infrastructure.
  PO60
  Development does not adversely impact on the continued                  No acceptable outcome provided
  operation, viability and maintenance of existing infrastructure or


NOOSA PLAN 2020                                                                                                                      Page 40 of 67
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 3 - Final Noosa Plan 2020 Part 4-6(PDF, 9MB).pdf · 9.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.