Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-3-final-noosa-plan-2020-part-4-6

of 320

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
  Performance outcomes                                                 Acceptable outcomes
  protects land identified as ecologically important areas, water
  catchments, beach protection or coastal management areas and
  land with historical or cultural values.
  PO2
  Low impact recreation activities for the purpose of an environment No acceptable outcome provided
  facility provides opportunities for the appreciation, conservation
  and interpretation of ecologically important areas or areas of
  cultural or heritage value.
  PO3                                                                  AO3
  Low impact outdoor sport and recreation activities such as           Development includes linkages to or between existing or future
  walking, cycling and canoe trails, develop for recreation, leisure   components of the Noosa Trail Network.
  and nature appreciation purposes and do not include buildings,
  structures or infrastructure.
  PO4
  Low impact telecommunication facilities and utility installations No acceptable outcome provided
  are compatible with, and do not affect, the values and process
  within ecologically important areas and are designed to minimise
  the visual impacts on scenic amenity.
  PO5
  Development maintains the primary function of the zone and        No acceptable outcome provided
  protects ecologically important areas, water catchments, waterway
  connectivity, marine plants, beach protection and coastal
  management areas and land with historical or cultural values.
  PO6
  Development and use of premises within 750 metres of the             No acceptable outcome provided
  Noosaville airport do not cause an obstruction or any other
  potential hazard to aircraft movement associated with the airport.



 Building design and built form                  Table 6.7.1.3 ­ Criteria for assessment (Part)
  Performance outcomes                                                 Acceptable outcomes
  Building design and built form
  Height and Scale
  PO7                                                                  AO7.1
  Buildings and structures—                                            Buildings and structures are no more than 4 metres in building
  (a)    are low rise, and have a maximum building height of 1         height.
         storey;
                                                                       AO7.2
  (b)    have a minimal footprint on the land;
                                                                       The maximum length of wall in one place is 15 metres.
  (c)    do not visually dominate the site or surrounding spaces;
         and                                                           AO7.3
  (d)    are low set and of a smaller scale to the prevailing          For any individual building or roofed structure, no more than
         vegetation around them.                                       150m² is under the roof.

                                                                       AO7.4
                                                                       Where excavation is required, the maximum portion of the
                                                                       exposed external façade of the building cannot exceed 4 metres in
                                                                       building height.

                                                                       Editor's note—refer to figure AP3­13A
  Setbacks and siting
  PO8                                                                  AO8.1
  Buildings and structures are appropriately set back so as to—        Buildings and structures are sited on that part of the site with the



NOOSA PLAN 2020                                                                                                                      Page 2 of 6
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-3-final-noosa-plan-2020-part-4-6.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.