 Drainage           Table 6.8.2.3 Criteria for assessment (part)
  Performance outcomes                                                    Acceptable outcomes

  Earthworks and Drainage
  PO23                                                                    AO23
  Development and associated site works including filling,                Development and associated site works, including filling and
  excavation and retaining structures do not directly, indirectly or      excavation, are designed and constructed to ensure overland flow
  cumulatively cause adverse impacts external to the development          and/or flooding is not worsened, impeded, or otherwise diverted to
  site by:                                                                adversely affect other properties.
  (a)    causing ponding of water on the site or nearby land;
  (b)    increasing flooding, which adversely affects the safety or
         use of any land upstream and downstream; or
  (c)    adversely affecting the flow of water in any overland flow
         path.




 Pedestrian and Cycling Connectivity                       Table 6.8.2.3 Criteria for assessment (part)
  Performance outcomes                                                    Acceptable Outcomes
  Pedestrian and Cycling Connectivity
  PO24
  Convenient and legible connections are provided for pedestrians         No acceptable outcome provided
  and cyclists to the site, particularly having regard to linkages with
  existing and proposed public transport infrastructure, the open
  space network, centres and other community­related activities.


  PO25                                                                    AO25.1
  Public or semi­public spaces are integrated into the centre's           Public and semi­public spaces are located to ensure pedestrian
  pedestrian and cycle networks.                                          movement flows through the site and connects to the pedestrian
                                                                          and cycle networks.

                                                                          AO25.2
                                                                          Pedestrian arcades, laneways or enclosed thoroughfares are a
                                                                          minimum of 6 metres wide, provide a direct line of sight to a major
                                                                          pedestrian destination (major tenancy, car park, public place, etc.),
                                                                          and are not dead ends, narrow or circuitous.


 Environment and heritage                  Table 6.8.2.3 Criteria for assessment (part)
  Performance outcomes                                                    Acceptable Outcomes
  Environment, heritage and scenic amenity
  PO26                                                                    AO26
  Development:                                                            Development does not result in sediment or other material
  (a)    retains natural vegetation wherever possible;                    including building materials or waste products being deposited or
                                                                          released into the road reserve, stormwater drain or adjacent
  (b)    has minimal impact on the natural landform of the site;
                                                                          properties.
  (c)    does not lead to erosion or the transport of sediments off
         site;
  (d)    does not lead to the disturbance of natural features,
         buildings or structures of cultural heritage significance.



  PO27


NOOSA PLAN 2020                                                                                                                      Page 17 of 30
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-3-final-noosa-plan-2020-part-4-6.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.